메뉴 건너뛰기




Volumn 131, Issue 12, 2005, Pages 1292-1300

Optimal lighting arrangements for nighttime highway construction projects

Author keywords

Algorithms; Decision support systems; Highway construction; Light, artificial; Nighttime construction; Optimization

Indexed keywords

HIGHWAY CONSTRUCTION; LIGHT, ARTIFICIAL; NIGHTTIME CONSTRUCTION;

EID: 29044436435     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:12(1292)     Document Type: Article
Times cited : (24)

References (26)
  • 3
    • 0030234407 scopus 로고    scopus 로고
    • Development of work zone lighting standards for nighttime highway work
    • Transportation Research Board, Washington D.C.
    • Ellis, R. D. Jr., and Amos, S. J. (1996). "Development of work zone lighting standards for nighttime highway work." Transportation Research Record, 1529, Transportation Research Board, Washington D.C.
    • (1996) Transportation Research Record, 1529
    • Ellis Jr., R.D.1    Amos, S.J.2
  • 4
    • 0035392410 scopus 로고    scopus 로고
    • Optimum planning of highway construction under the A+B bidding method
    • El-Rayes, K. (2001). "Optimum planning of highway construction under the A+B bidding method." J. Constr. Eng. Manage., 127(4), 261-269.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.4 , pp. 261-269
    • El-Rayes, K.1
  • 5
    • 15944404996 scopus 로고    scopus 로고
    • Automated DSS for lighting design of nighttime operations in highway construction projects
    • National Institute of Standards and Technology, Washington, D.C.
    • El-Rayes, K., and Hyari, K. (2002). "Automated DSS for lighting design of nighttime operations in highway construction projects." Proc., 19th International Symp. on Automation and Robotics in Construction, ISARC 2002, National Institute of Standards and Technology, Washington, D.C.
    • (2002) Proc., 19th International Symp. on Automation and Robotics in Construction, ISARC 2002
    • El-Rayes, K.1    Hyari, K.2
  • 6
    • 15944408442 scopus 로고    scopus 로고
    • CONLIGHT: Lighting design model for nighttime highway construction
    • El-Rayes, K., and Hyari, K. (2005). "CONLIGHT: Lighting design model for nighttime highway construction." J. Constr. Eng. Manage., 131(4), 467-476.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.4 , pp. 467-476
    • El-Rayes, K.1    Hyari, K.2
  • 7
    • 33646165633 scopus 로고    scopus 로고
    • Nighttime construction: Evaluation of lighting for highway construction operations in Illinois
    • Illinois Transportation Research Center, Illinois Department of Transportation, Ill
    • El-Rayes, K., Liu, L., Soibelman, L., and Hyari, K. (2003). "Nighttime construction: Evaluation of lighting for highway construction operations in Illinois." Final Rep. Project No. VD-H1, FY 00/01, ITRC FR 00/01-2, Illinois Transportation Research Center, Illinois Department of Transportation, Ill.
    • (2003) Final Rep. Project No. VD-H1, FY 00/01, ITRC FR 00/01-2
    • El-Rayes, K.1    Liu, L.2    Soibelman, L.3    Hyari, K.4
  • 8
    • 0035132257 scopus 로고    scopus 로고
    • Optimizing resource utilization for repetitive construction projects
    • El-Rayes, K., and Moselhi, O. (2001). "Optimizing resource utilization for repetitive construction projects." J. Constr. Eng. Manage., 127(1), 18-27.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.1 , pp. 18-27
    • El-Rayes, K.1    Moselhi, O.2
  • 9
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost trade-off problems
    • Feng, C. W., Liu, L., and Burns, S. (1997). "Using genetic algorithms to solve construction time-cost trade-off problems." J. Comput. Civ. Eng., 11(3), 184-189.
    • (1997) J. Comput. Civ. Eng. , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.W.1    Liu, L.2    Burns, S.3
  • 10
    • 0034172005 scopus 로고    scopus 로고
    • Stochastic construction time-cost trade-off analysis
    • Feng, C. W., Liu, L., and Burns, S. (2000). "Stochastic construction time-cost trade-off analysis." J. Comput. Civ. Eng., 14(2), 117-126.
    • (2000) J. Comput. Civ. Eng. , vol.14 , Issue.2 , pp. 117-126
    • Feng, C.W.1    Liu, L.2    Burns, S.3
  • 12
    • 3242662050 scopus 로고    scopus 로고
    • Assignment and allocation optimization of partially multiskilled workforce
    • Gomar, J., Haas, C., and Morton, D. (2002). "Assignment and allocation optimization of partially multiskilled workforce." J. Constr. Eng. Manage., 128(2), 103-109.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.2 , pp. 103-109
    • Gomar, J.1    Haas, C.2    Morton, D.3
  • 14
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • Hegazy, T. (1999). "Optimization of resource allocation and leveling using genetic algorithms." J. Constr. Eng. Manage., 125(3), 167-175.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 15
    • 0033156961 scopus 로고    scopus 로고
    • EvoSite: Evolution-based model for site layout planning
    • Hegazy, T., and Elbeltagi, E. (1999). "EvoSite: Evolution-based model for site layout planning." J. Comput. Civ. Eng., 13(3), 198-206.
    • (1999) J. Comput. Civ. Eng. , vol.13 , Issue.3 , pp. 198-206
    • Hegazy, T.1    Elbeltagi, E.2
  • 16
    • 0035335808 scopus 로고    scopus 로고
    • Cost optimization in projects with repetitive nonserial activities
    • Hegazy, T., and Wassef, N. (2001). "Cost optimization in projects with repetitive nonserial activities." J. Constr, Eng. Manage., 127(3), 183-191.
    • (2001) J. Constr, Eng. Manage. , vol.127 , Issue.3 , pp. 183-191
    • Hegazy, T.1    Wassef, N.2
  • 17
    • 0011022696 scopus 로고
    • Variables impacted by nighttime construction projects
    • Transportation North-west, Univ. of Washington, Seattle, Wash.
    • Hinze, J., and Carlisle, D. (1990). "Variables impacted by nighttime construction projects." Final Rep. No. TNW 90-07, Transportation North-west, Univ. of Washington, Seattle, Wash.
    • (1990) Final Rep. No. TNW 90-07
    • Hinze, J.1    Carlisle, D.2
  • 19
    • 15944417869 scopus 로고    scopus 로고
    • IESNA guide for choosing light sources for general lighting
    • New York
    • Illumination Engineering Society of North America (IESNA). (1998). "IESNA guide for choosing light sources for general lighting." Rep. No. DG-10-98, New York.
    • (1998) Rep. No. DG-10-98
  • 20
    • 29044439375 scopus 로고    scopus 로고
    • IESNA practice for roadway lighting
    • American National Standard, New York
    • Illuminating Engineering Society of North America (IESNA). (2000). "IESNA practice for roadway lighting." Rep. No. ANSI/IESNA RP-8-00, American National Standard, New York.
    • (2000) Rep. No. ANSI/IESNA RP-8-00
  • 22
    • 2342429500 scopus 로고    scopus 로고
    • Report on the Department of Transportation's Administration of the Nighttime Construction Program
    • State of New York Office of the State Comptroller, Albany, N.Y.
    • McCall, H. C. (1999). "Report on the Department of Transportation's Administration of the Nighttime Construction Program." Rep. No. 98-5-50, State of New York Office of the State Comptroller, Albany, N.Y.
    • (1999) Rep. No. 98-5-50
    • McCall, H.C.1
  • 23
    • 0027866760 scopus 로고
    • Scheduling of repetitive projects with cost optimization
    • Moselhi, O., and El-Rayes, K. (1993). "Scheduling of repetitive projects with cost optimization." J. Constr. Eng. Manage., 119(4), 681-697.
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.4 , pp. 681-697
    • Moselhi, O.1    El-Rayes, K.2
  • 24
    • 29044436021 scopus 로고
    • Nighttime paving
    • Colorado Dept. of Highways, Federal Highway Administration, Denver
    • Price, D. A. (1986). "Nighttime paving." Implementation Rep. No. CDOH/DTP/R-86/6, Colorado Dept. of Highways, Federal Highway Administration, Denver.
    • (1986) Implementation Rep. No. CDOH/DTP/R-86/6
    • Price, D.A.1
  • 25
    • 0012749572 scopus 로고
    • Benefits and safety impact of night work-zone activities
    • U.S. Department of Transportation, Federal Highway Administration, Washington, D.C.
    • Shepard, F. D., and Cottrel, B. (1985). "Benefits and safety impact of night work-zone activities." Rep. No. FHWA/RD-85/067, U.S. Department of Transportation, Federal Highway Administration, Washington, D.C.
    • (1985) Rep. No. FHWA/RD-85/067
    • Shepard, F.D.1    Cottrel, B.2
  • 26
    • 29044444668 scopus 로고
    • Longman Scientific and Technical, Burnt Mill, Harlow, Essex, United Kingdom
    • Pritchard, D. C. (1995). Lighting, 5th Ed., Longman Scientific and Technical, Burnt Mill, Harlow, Essex, United Kingdom.
    • (1995) Lighting, 5th Ed.
    • Pritchard, D.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.