메뉴 건너뛰기




Volumn 76, Issue 5, 2006, Pages 302-316

Medium term system load forecasting with a dynamic artificial neural network model

Author keywords

Artificial neural networks; Dynamic neural networks; Medium term load forecasting; Neural network applications

Indexed keywords

DYNAMIC NEURAL NETWORKS; MEDIUM TERM LOAD FORECASTING; NEURAL NETWORK APPLICATIONS; PURCHASING STRATEGIES;

EID: 31344476313     PISSN: 03787796     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.epsr.2005.06.010     Document Type: Article
Times cited : (163)

References (43)
  • 2
    • 0030087191 scopus 로고    scopus 로고
    • Identification of ARIMAX model for short term load forecasting: An evolutionary programming approach
    • H.T. Yang, C.M. Haung, and C.L. Huang Identification of ARIMAX model for short term load forecasting: an evolutionary programming approach IEEE Trans. Power Syst. 11 1 1996 403 408
    • (1996) IEEE Trans. Power Syst. , vol.11 , Issue.1 , pp. 403-408
    • Yang, H.T.1    Haung, C.M.2    Huang, C.L.3
  • 4
    • 0026910776 scopus 로고
    • Weather sensitive short-term load forecasting using nonfully connected artificial neural network
    • S.T. Chen, D.C. Yu, and A.R. Moghaddamjo Weather sensitive short-term load forecasting using nonfully connected artificial neural network IEEE Trans. Power Syst. 7 3 1992 1098 1105
    • (1992) IEEE Trans. Power Syst. , vol.7 , Issue.3 , pp. 1098-1105
    • Chen, S.T.1    Yu, D.C.2    Moghaddamjo, A.R.3
  • 5
    • 0030286579 scopus 로고    scopus 로고
    • Neural network based short-term load forecasting using weather compensation
    • T.W.S. Chow, and C.T. Leung Neural network based short-term load forecasting using weather compensation IEEE Trans. Power Syst. 11 4 1996 1736 1742
    • (1996) IEEE Trans. Power Syst. , vol.11 , Issue.4 , pp. 1736-1742
    • Chow, T.W.S.1    Leung, C.T.2
  • 6
    • 0035248045 scopus 로고    scopus 로고
    • Neural networks for short-term load forecasting: A review and evaluation
    • H.S. Hippert, C.E. Pedreira, and R.C. Souza Neural networks for short-term load forecasting: a review and evaluation IEEE Trans. Power Syst. 16 1 2001 44 55
    • (2001) IEEE Trans. Power Syst. , vol.16 , Issue.1 , pp. 44-55
    • Hippert, H.S.1    Pedreira, C.E.2    Souza, R.C.3
  • 7
    • 0026818086 scopus 로고
    • Short term load forecasting using a multilayer neural network with an adaptive learning algorithm
    • K.L. Ho, Y.Y. Hsu, and C.C. Yang Short term load forecasting using a multilayer neural network with an adaptive learning algorithm IEEE Trans. Power Syst. 7 1 1992 141 149
    • (1992) IEEE Trans. Power Syst. , vol.7 , Issue.1 , pp. 141-149
    • Ho, K.L.1    Hsu, Y.Y.2    Yang, C.C.3
  • 8
    • 0036699869 scopus 로고    scopus 로고
    • Neural network load forecasting with weather ensemble predictions
    • J.W. Taylor, and R. Buizza Neural network load forecasting with weather ensemble predictions IEEE Trans. Power Syst. 17 3 2002 626 632
    • (2002) IEEE Trans. Power Syst. , vol.17 , Issue.3 , pp. 626-632
    • Taylor, J.W.1    Buizza, R.2
  • 9
    • 84888769842 scopus 로고    scopus 로고
    • Taiwan Power Company, website: http://www.taipower.com.tw.
  • 10
    • 18144394762 scopus 로고    scopus 로고
    • Forecasting regional electricity load based on recurrent support vector machines with genetic algorithms
    • P.F. Pai, and W.C. Hong Forecasting regional electricity load based on recurrent support vector machines with genetic algorithms Electric Power Syst. Res. 74 2005 417 425
    • (2005) Electric Power Syst. Res. , vol.74 , pp. 417-425
    • Pai, P.F.1    Hong, W.C.2
  • 11
    • 18144377117 scopus 로고    scopus 로고
    • Long-term/mid-term electric load forecasting based on short-term correlation and annual growth
    • H.M. Al-Hamadi, and S.A. Soliman Long-term/mid-term electric load forecasting based on short-term correlation and annual growth Electric Power Syst. Res. 74 2005 353 361
    • (2005) Electric Power Syst. Res. , vol.74 , pp. 353-361
    • Al-Hamadi, H.M.1    Soliman, S.A.2
  • 12
    • 31344443816 scopus 로고    scopus 로고
    • California must control demand for power while supply slowly catches up
    • January 11
    • H.R. Varian California Must Control Demand For Power While Supply Slowly Catches Up January 11, 2001 New York Times
    • (2001) New York Times
    • Varian, H.R.1
  • 14
    • 0036408449 scopus 로고    scopus 로고
    • A quantitative analysis of pricing behavior in California's wholesale electricity market during summer 2000
    • P.L. Joskow, and E. Kahn A quantitative analysis of pricing behavior in California's wholesale electricity market during summer 2000 Energy J. 23 4 2000 1 35
    • (2000) Energy J. , vol.23 , Issue.4 , pp. 1-35
    • Joskow, P.L.1    Kahn, E.2
  • 15
    • 0036577197 scopus 로고    scopus 로고
    • Long-term load forecasting for fast developing utility using a knowledge-based expert system
    • M.S. Kandil, S.M. El-Debeiky, and N.E. Hasanien Long-term load forecasting for fast developing utility using a knowledge-based expert system IEEE Trans. Power Syst. 17 2 2002 491 496
    • (2002) IEEE Trans. Power Syst. , vol.17 , Issue.2 , pp. 491-496
    • Kandil, M.S.1    El-Debeiky, S.M.2    Hasanien, N.E.3
  • 16
    • 0029332890 scopus 로고
    • Forecasting monthly electric load and energy for a fast growing utility using an artificial neural network
    • S.M. Islam, M. Al-Alawi, and K.A. Ellithy Forecasting monthly electric load and energy for a fast growing utility using an artificial neural network Electric Power Syst. Res. 34 1995 1 9
    • (1995) Electric Power Syst. Res. , vol.34 , pp. 1-9
    • Islam, S.M.1    Al-Alawi, M.2    Ellithy, K.A.3
  • 19
    • 0032495104 scopus 로고    scopus 로고
    • A comparative study of medium-weather-dependent load forecasting using enhanced artificial/fuzzy neural network and statistical techniques
    • M.M. Elkateb, K. Solaiman, and Y. Al-Turki A comparative study of medium-weather-dependent load forecasting using enhanced artificial/fuzzy neural network and statistical techniques Neurocomputing 23 1998 3 13
    • (1998) Neurocomputing , vol.23 , pp. 3-13
    • Elkateb, M.M.1    Solaiman, K.2    Al-Turki, Y.3
  • 20
    • 0034831851 scopus 로고    scopus 로고
    • Medium-term load forecasting with artificial neural network models
    • M. Gavrilas, I. Ciutea, and C. Tanasa Medium-term load forecasting with artificial neural network models IEEE Conf. Elec. Dist. Pub. 482 2001 383
    • (2001) IEEE Conf. Elec. Dist. Pub. , vol.482 , pp. 383
    • Gavrilas, M.1    Ciutea, I.2    Tanasa, C.3
  • 21
    • 0032140498 scopus 로고    scopus 로고
    • Long-term energy management optimization according to different types of transactions
    • A. Bart, M. Benahmad, R. Cherkaoui, G. Pitteloud, and A. Germond Long-term energy management optimization according to different types of transactions IEEE Trans. Power Syst. 13 3 1998 804 809
    • (1998) IEEE Trans. Power Syst. , vol.13 , Issue.3 , pp. 804-809
    • Bart, A.1    Benahmad, M.2    Cherkaoui, R.3    Pitteloud, G.4    Germond, A.5
  • 22
    • 0032649785 scopus 로고    scopus 로고
    • Experience with FNN models for medium term power demand predictions
    • E. Doveh, P. Feigin, and L. Hyams Experience with FNN models for medium term power demand predictions IEEE Trans. Power Syst. 14 2 1999 538 546
    • (1999) IEEE Trans. Power Syst. , vol.14 , Issue.2 , pp. 538-546
    • Doveh, E.1    Feigin, P.2    Hyams, L.3
  • 23
    • 0026954627 scopus 로고
    • Long range peak demand forecasting under condition of high growth
    • E.H. Barakat, and S.A. Al-Rashed Long range peak demand forecasting under condition of high growth IEEE Trans. Power Syst. 7 4 1992 1483 1486
    • (1992) IEEE Trans. Power Syst. , vol.7 , Issue.4 , pp. 1483-1486
    • Barakat, E.H.1    Al-Rashed, S.A.2
  • 24
    • 12144271359 scopus 로고    scopus 로고
    • A dynamic architecture for artificial neural networks
    • M. Ghiassi, and H. Saidane A dynamic architecture for artificial neural networks Neurocomputing 63 2005 397 413
    • (2005) Neurocomputing , vol.63 , pp. 397-413
    • Ghiassi, M.1    Saidane, H.2
  • 26
    • 0003123930 scopus 로고    scopus 로고
    • Forecasting with artificial neural network: The state of the art
    • G. Zhang, E.B. Patuwo, and M.Y. Hu Forecasting with artificial neural network: the state of the art Int. J. Forecasting 14 1998 35 62
    • (1998) Int. J. Forecasting , vol.14 , pp. 35-62
    • Zhang, G.1    Patuwo, E.B.2    Hu, M.Y.3
  • 27
    • 14844288028 scopus 로고    scopus 로고
    • A dynamic artificial neural network model for forecasting time series events
    • M. Ghiassi, H. Saidane, and D.K. Zimbra A dynamic artificial neural network model for forecasting time series events Int. J. Forecasting 21 2005 341 362
    • (2005) Int. J. Forecasting , vol.21 , pp. 341-362
    • Ghiassi, M.1    Saidane, H.2    Zimbra, D.K.3
  • 29
    • 0027662338 scopus 로고
    • Pruning algorithms - A review
    • R. Reed Pruning algorithms - a review IEEE Trans. Neural Netw. 4 1993 740 747
    • (1993) IEEE Trans. Neural Netw. , vol.4 , pp. 740-747
    • Reed, R.1
  • 30
    • 0033105287 scopus 로고    scopus 로고
    • Model selection in neural networks
    • U. Anders, and O. Korn Model selection in neural networks Neural Netw. 12 1999 309 323
    • (1999) Neural Netw. , vol.12 , pp. 309-323
    • Anders, U.1    Korn, O.2
  • 31
    • 0042525842 scopus 로고    scopus 로고
    • Neural-network construction and selection in nonlinear modeling
    • I. Rivals, and L. Personnaz Neural-network construction and selection in nonlinear modeling IEEE Trans. Neural Netw. 14 4 2003 804 819
    • (2003) IEEE Trans. Neural Netw. , vol.14 , Issue.4 , pp. 804-819
    • Rivals, I.1    Personnaz, L.2
  • 32
    • 0031146959 scopus 로고    scopus 로고
    • Constructive algorithms for structure learning in feedforward neural networks for regression problems
    • T.Y. Kwok, and D.Y. Yeung Constructive algorithms for structure learning in feedforward neural networks for regression problems IEEE Trans. Neural Netw. 8 3 1997 630 645
    • (1997) IEEE Trans. Neural Netw. , vol.8 , Issue.3 , pp. 630-645
    • Kwok, T.Y.1    Yeung, D.Y.2
  • 34
    • 0033442924 scopus 로고    scopus 로고
    • A cross-validation analysis of neural network out-of-sample performance in exchange rate forecasting
    • M.Y. Hu, G.P. Zhang, C.X. Jiang, and B.E. Patuwo A cross-validation analysis of neural network out-of-sample performance in exchange rate forecasting Decis. Sci. 30 1 1999 197 216
    • (1999) Decis. Sci. , vol.30 , Issue.1 , pp. 197-216
    • Hu, M.Y.1    Zhang, G.P.2    Jiang, C.X.3    Patuwo, B.E.4
  • 35
    • 0034346267 scopus 로고    scopus 로고
    • Artificial neural network decision support systems for new product development project selection
    • R.J. Thieme, M. Song, and R. Calantone Artificial neural network decision support systems for new product development project selection J. Marketing Res. 37 2000 499 507
    • (2000) J. Marketing Res. , vol.37 , pp. 499-507
    • Thieme, R.J.1    Song, M.2    Calantone, R.3
  • 36
    • 0033561894 scopus 로고    scopus 로고
    • On cross validation for model selection
    • I. Rivals, and L. Personnaz On cross validation for model selection Neural Comput. 11 1999 863 870
    • (1999) Neural Comput. , vol.11 , pp. 863-870
    • Rivals, I.1    Personnaz, L.2
  • 40
    • 0039988139 scopus 로고    scopus 로고
    • Time series forecasting with neural networks: A comparative study using the airline data
    • J. Faraway, and C. Chatfield Time series forecasting with neural networks: a comparative study using the airline data Appl. Stat. 47 2 1998 231 250
    • (1998) Appl. Stat. , vol.47 , Issue.2 , pp. 231-250
    • Faraway, J.1    Chatfield, C.2
  • 41
    • 0032205039 scopus 로고    scopus 로고
    • The impact of temperature forecast uncertainty on Baysian load forecasting
    • A.P. Douglas, A.M. Breipohl, F.N. Lee, and R. Adapa The impact of temperature forecast uncertainty on Baysian load forecasting IEEE Trans. Power Syst. 13 4 1998 1507 1513
    • (1998) IEEE Trans. Power Syst. , vol.13 , Issue.4 , pp. 1507-1513
    • Douglas, A.P.1    Breipohl, A.M.2    Lee, F.N.3    Adapa, R.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.