-
1
-
-
27844489806
-
Lot scheduling in a disassembly factory
-
Luleå University of Technology, Sweden
-
Brander, P. and Sommer-Dittrich, T., Lot scheduling in a disassembly factory. Working Paper, Luleå University of Technology, Sweden, 2003.
-
(2003)
Working Paper
-
-
Brander, P.1
Sommer-Dittrich, T.2
-
2
-
-
0742334451
-
Directive 2002/96/EC of the European Parliament and of the Council of 27 January 2003 on waste electrical and electronic equipment (WEEE) - Joint declaration of the European Parliament, the Council and the Commission relating to Article 9
-
Directive 2002/96/EC of the European Parliament and of the Council of 27 January 2003 on waste electrical and electronic equipment (WEEE) - joint declaration of the European Parliament, the Council and the Commission relating to Article 9. Off. J. EU, 2002, L 037, 24-39. Available online at: http://wwwdb.europarl.eu.int/oeil/oeil_ViewDNL. ProcedureView?lang=2&procid= 4445 (accessed 17 June 2003).
-
(2002)
Off. J. EU
, vol.L 037
, pp. 24-39
-
-
-
3
-
-
0026895316
-
The cyclic lot scheduling problem with sequence-dependent setups
-
Dobson, G., The cyclic lot scheduling problem with sequence-dependent setups. Oper. Res., 1992, 40, 736-749.
-
(1992)
Oper. Res.
, vol.40
, pp. 736-749
-
-
Dobson, G.1
-
4
-
-
0017931081
-
The economic lot scheduling problem (ELSP): Review and extensions
-
Elmaghraby, S.E., The economic lot scheduling problem (ELSP): Review and extensions. Manag. Sci., 1978, 24, 587-598.
-
(1978)
Manag. Sci.
, vol.24
, pp. 587-598
-
-
Elmaghraby, S.E.1
-
5
-
-
0000848478
-
Optimal power of two replenishment strategies in capacitated general production/distribution networks
-
Federgruen, A. and Zheng, Y.-S., Optimal power of two replenishment strategies in capacitated general production/distribution networks. Manag. Sci., 1993, 39, 710-727.
-
(1993)
Manag. Sci.
, vol.39
, pp. 710-727
-
-
Federgruen, A.1
Zheng, Y.-S.2
-
6
-
-
0031277045
-
Quantitative models for reverse logistics: A review
-
Fleischmann, M., Bloemhof-Ruwaard, J.M., Dekker, R., Van der Laan, E., Van Nunen, J.A.E.E. and Van Wassenhove, L.N., Quantitative models for reverse logistics: a review. Eur. J. Oper. Res., 1997, 103, 1-17.
-
(1997)
Eur. J. Oper. Res.
, vol.103
, pp. 1-17
-
-
Fleischmann, M.1
Bloemhof-Ruwaard, J.M.2
Dekker, R.3
Van Der Laan, E.4
Van Nunen, J.A.E.E.5
Van Wassenhove, L.N.6
-
7
-
-
0034394639
-
A characterisation of logistics networks for product recovery
-
Fleischmann, M., Krikke, H.R., Dekker, R. and Flapper, S.D.P., A characterisation of logistics networks for product recovery. Omega, 2000, 28, 653-666.
-
(2000)
Omega
, vol.28
, pp. 653-666
-
-
Fleischmann, M.1
Krikke, H.R.2
Dekker, R.3
Flapper, S.D.P.4
-
8
-
-
0030129785
-
Scheduling using drum-buffer-rope in a remanufacturing environment
-
Guide Jr, V.D.R., Scheduling using drum-buffer-rope in a remanufacturing environment. Int. J. Prod. Res., 1996, 34, 1081-1091.
-
(1996)
Int. J. Prod. Res.
, vol.34
, pp. 1081-1091
-
-
Guide Jr., V.D.R.1
-
9
-
-
0030823588
-
Scheduling policies for remanufacturing
-
Guide, Jr, V.D.R., Kraus, M.E. and Srivastava, R., Scheduling policies for remanufacturing. Int. J. Prod. Econ., 1997, 48, 187-204.
-
(1997)
Int. J. Prod. Econ.
, vol.48
, pp. 187-204
-
-
Guide Jr., V.D.R.1
Kraus, M.E.2
Srivastava, R.3
-
10
-
-
0033358107
-
Issues in environmentally conscious manufacturing and product recovery: A survey
-
Gungor, A. and Gupta, S.M., Issues in environmentally conscious manufacturing and product recovery: a survey. Comput. Ind. Eng., 1999, 36, 811-853.
-
(1999)
Comput. Ind. Eng.
, vol.36
, pp. 811-853
-
-
Gungor, A.1
Gupta, S.M.2
-
11
-
-
0035837942
-
A solution approach to the disassembly line balancing problem in the presence of task failures
-
Gungor, A. and Gupta, S.M., A solution approach to the disassembly line balancing problem in the presence of task failures. Int. J. Prod. Res., 2001, 39, 1427-1467.
-
(2001)
Int. J. Prod. Res.
, vol.39
, pp. 1427-1467
-
-
Gungor, A.1
Gupta, S.M.2
-
12
-
-
0001353411
-
Scheduling disassembly
-
Gupta, S.M. and Taleb, K.M., Scheduling disassembly. Int. J. Prod. Res., 1994, 32, 1857-1866.
-
(1994)
Int. J. Prod. Res.
, vol.32
, pp. 1857-1866
-
-
Gupta, S.M.1
Taleb, K.M.2
-
13
-
-
0033690423
-
Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities
-
Haase, K. and Kimms, A., Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities. Int. J. Prod. Econ., 2000, 66, 159-169.
-
(2000)
Int. J. Prod. Econ.
, vol.66
, pp. 159-169
-
-
Haase, K.1
Kimms, A.2
-
14
-
-
0026243201
-
The economic lot scheduling problem: Theory and practice
-
Lopez, M.A. and Kingsman, B.G., The economic lot scheduling problem: theory and practice. Int. J. Prod. Econ., 1991, 23, 147-164.
-
(1991)
Int. J. Prod. Econ.
, vol.23
, pp. 147-164
-
-
Lopez, M.A.1
Kingsman, B.G.2
-
15
-
-
0039052992
-
The impact of lot size and production scheduling on inventory investment in a remanufacturing environment
-
Perry, J.H., The impact of lot size and production scheduling on inventory investment in a remanufacturing environment. Prod. Inv. Manag. J., 1991, 32, 41-45.
-
(1991)
Prod. Inv. Manag. J.
, vol.32
, pp. 41-45
-
-
Perry, J.H.1
-
16
-
-
0001343645
-
Rounding off to powers of two in continuous relaxations of capacitated lot sizing problems
-
Roundy, R., Rounding off to powers of two in continuous relaxations of capacitated lot sizing problems. Manag. Sci., 1989, 35, 1433-1442.
-
(1989)
Manag. Sci.
, vol.35
, pp. 1433-1442
-
-
Roundy, R.1
-
17
-
-
0032689646
-
Lot sizes in a capacity constrained facility with available initial inventories
-
Segerstedt, A., Lot sizes in a capacity constrained facility with available initial inventories. Int. J. Prod. Econ., 1999, 59, 469-475.
-
(1999)
Int. J. Prod. Econ.
, vol.59
, pp. 469-475
-
-
Segerstedt, A.1
-
19
-
-
84968082184
-
Strategic issues in product recovery management
-
Thierry, M., Salomon, M., Van Nunen, J. and Van Wassenhove, L., Strategic issues in product recovery management. Calif. Manag. Rev., 1995, 37, 114-135.
-
(1995)
Calif. Manag. Rev.
, vol.37
, pp. 114-135
-
-
Thierry, M.1
Salomon, M.2
Van Nunen, J.3
Van Wassenhove, L.4
-
20
-
-
0035341857
-
The economic lot scheduling problem under power-of-two policy
-
Yao, M.-J. and Elmaghraby, S.E., The economic lot scheduling problem under power-of-two policy. Comput. Math. Appl., 2001, 41, 1379-1393.
-
(2001)
Comput. Math. Appl.
, vol.41
, pp. 1379-1393
-
-
Yao, M.-J.1
Elmaghraby, S.E.2
|