메뉴 건너뛰기




Volumn 127, Issue 6, 2001, Pages 431-437

Probabilistic optimal-cost scheduling

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRUCTION; COST EFFECTIVENESS; CRITICAL PATH ANALYSIS; ESTIMATION; OPTIMIZATION; PLANNING; PROBABILITY; PROJECT MANAGEMENT; STATISTICAL METHODS;

EID: 0035509423     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2001)127:6(431)     Document Type: Article
Times cited : (20)

References (8)
  • 2
    • 4243892388 scopus 로고    scopus 로고
    • Integrated range estimating and probabilistic scheduling of construction projects
    • PhD dissertation, Dept. of Civil Engineering, Texas A&M University, College Station, Tex.
    • (1999)
    • Isidore, L.J.1
  • 6
    • 0006980803 scopus 로고
    • The Construction Industry Institute (CII); Construction Industry Institute, University of Texas at Austin, Austin, Tex.
    • (1995) Schedule Reduction
  • 8
    • 0025701917 scopus 로고
    • Project compression. A method for speeding up resource constrained projects which preserve the activity schedule
    • (1990) Eur. J. Operational Res. , vol.49 , Issue.1 , pp. 140-152
    • Yau, C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.