-
2
-
-
0041341872
-
Disassembly scheduling with multiple product types
-
Kim, H.-J., Lee, D.-H., Xirouchakis, P., Züst, R.: Disassembly Scheduling with Multiple Product Types, Annals of the CIRP, Vol. 52 (2003) 403-406
-
(2003)
Annals of the CIRP
, vol.52
, pp. 403-406
-
-
Kim, H.-J.1
Lee, D.-H.2
Xirouchakis, P.3
Züst, R.4
-
3
-
-
33747286457
-
Disassembly planning and scheduling: Review and further research
-
Lee, D.-H., Kang, J.-G., Xirouchakis, P.: Disassembly Planning and Scheduling: Review and Further Research, Proceedings of the Institution of Mechanical Engineers: Journal of Engineering Manufacture - Part B, Vol. 215 (2001) 695-710
-
(2001)
Proceedings of the Institution of Mechanical Engineers: Journal of Engineering Manufacture - Part B
, vol.215
, pp. 695-710
-
-
Lee, D.-H.1
Kang, J.-G.2
Xirouchakis, P.3
-
4
-
-
8344257395
-
Disassembly scheduling: Integer programming models
-
Lee, D.-H., Kim, H.-J., Choi, G., Xirouchakis, P.: Disassembly Scheduling: Integer Programming Models, Proceedings of the Institution of Mechanical Engineers: Journal of Engineering Manufacture - Part B, Vol. 218 (2004) 1357-1372
-
(2004)
Proceedings of the Institution of Mechanical Engineers: Journal of Engineering Manufacture - Part B
, vol.218
, pp. 1357-1372
-
-
Lee, D.-H.1
Kim, H.-J.2
Choi, G.3
Xirouchakis, P.4
-
5
-
-
2342594041
-
A two-stage heuristic for disassembly scheduling with assembly product structure
-
Lee, D.-H., Xirouchakis, P.: A Two-Stage Heuristic for Disassembly Scheduling with Assembly Product Structure, Journal of the Operational Research Society, Vol. 55 (2004) 287-297
-
(2004)
Journal of the Operational Research Society
, vol.55
, pp. 287-297
-
-
Lee, D.-H.1
Xirouchakis, P.2
-
6
-
-
0037501212
-
Disassembly scheduling with capacity constraints
-
Lee, D.-H., Xirouchakis, P., Züst, R.: Disassembly Scheduling with Capacity Constraints, Annals of the CIRP, Vol. 51 (2002) 387-390
-
(2002)
Annals of the CIRP
, vol.51
, pp. 387-390
-
-
Lee, D.-H.1
Xirouchakis, P.2
Züst, R.3
-
7
-
-
0035429278
-
Disassembly scheduling with parts commonality using petri-nets with timestamps
-
Neuendorf, K.-P., Lee, D.-H., Kiritsis, D., Xirouchakis, P.: Disassembly Scheduling with Parts commonality using Petri-nets with Timestamps, Fundamenta Informaticae, Vol. 47 (2001) 295-306
-
(2001)
Fundamenta Informaticae
, vol.47
, pp. 295-306
-
-
Neuendorf, K.-P.1
Lee, D.-H.2
Kiritsis, D.3
Xirouchakis, P.4
-
8
-
-
0031219811
-
Disassembly of multiple product structures
-
Taleb, K. N., Gupta, S. M., Disassembly of Multiple Product Structures, Computers and Industrial Engineering, Vol. 32 (1997) 949-961
-
(1997)
Computers and Industrial Engineering
, vol.32
, pp. 949-961
-
-
Taleb, K.N.1
Gupta, S.M.2
-
9
-
-
0031119840
-
Disassembly of complex product structures with parts and materials commonality
-
Taleb, K. N., Gupta, S. M., Brennan, L.: Disassembly of Complex Product Structures with Parts and Materials Commonality, Production Planning and Control, Vol. 8 (1997) 255-269
-
(1997)
Production Planning and Control
, vol.8
, pp. 255-269
-
-
Taleb, K.N.1
Gupta, S.M.2
Brennan, L.3
-
10
-
-
0000495984
-
Economic lot sizing: An O(n log n) algorithm that runs in linear time in the Wagner-Whitin case
-
Wagelmans, A., Hoesel, S. V., Kolen, A.: Economic Lot Sizing: an O(n log n) Algorithm that Runs in Linear Time in the Wagner-Whitin Case, Operations Research, Vol. 40 (1992) 145-156
-
(1992)
Operations Research
, vol.40
, pp. 145-156
-
-
Wagelmans, A.1
Hoesel, S.V.2
Kolen, A.3
|