-
1
-
-
0020783525
-
The effect of workload dependent due dates on job shop performance
-
Bertrand, J.W.M., 1983. The effect of workload dependent due dates on job shop performance. Mgmt. Sci., 29: 799-816.
-
(1983)
Mgmt. Sci.
, vol.29
, pp. 799-816
-
-
Bertrand, J.W.M.1
-
2
-
-
0022713964
-
Optimal due date assignment in a job shop
-
Cheng, T.C.E., 1986. Optimal due date assignment in a job shop. Int. J. Prod. Res., 24: 503-515.
-
(1986)
Int. J. Prod. Res.
, vol.24
, pp. 503-515
-
-
Cheng, T.C.E.1
-
3
-
-
0016929914
-
Due dates in job-shop scheduling
-
Eilon, S. and Chowdry, I.G., 1976. Due dates in job-shop scheduling. Int. J. Prod. Res., 14: 223-237.
-
(1976)
Int. J. Prod. Res.
, vol.14
, pp. 223-237
-
-
Eilon, S.1
Chowdry, I.G.2
-
4
-
-
0040905924
-
An integrated approach for production planning - A case study
-
Hedge, G.G., Shang, J.S. and Tadikamalla, P.R., 1991. An integrated approach for production planning - A case study. Omega, 19: 413-419.
-
(1991)
Omega
, vol.19
, pp. 413-419
-
-
Hedge, G.G.1
Shang, J.S.2
Tadikamalla, P.R.3
-
5
-
-
0017478424
-
A methodology for assigning minimum cost due dates
-
Weeks, J.K. and Fryer, J.S., 1977. A methodology for assigning minimum cost due dates. Mgmt. Sci., 23: 872-881.
-
(1977)
Mgmt. Sci.
, vol.23
, pp. 872-881
-
-
Weeks, J.K.1
Fryer, J.S.2
-
6
-
-
0018454859
-
A simulation study of predictable due dates
-
Weeks, J.K., 1979. A simulation study of predictable due dates. Mgmt. Sci., 25: 363-373.
-
(1979)
Mgmt. Sci.
, vol.25
, pp. 363-373
-
-
Weeks, J.K.1
-
7
-
-
0024961857
-
Production planning systems and their applicability to make-to-order companies
-
Hendry, L.C. and Kingsman, B.G., 1989. Production planning systems and their applicability to make-to-order companies. Eur. J. Oper. Res., 40: 1-15.
-
(1989)
Eur. J. Oper. Res.
, vol.40
, pp. 1-15
-
-
Hendry, L.C.1
Kingsman, B.G.2
-
9
-
-
0024664777
-
A structural methodology for managing manufacturing lead times in make-to-order companies
-
Kingsman, B.G., Tatsiopoulos, I.P. and Hendry, L.C., 1989. A structural methodology for managing manufacturing lead times in make-to-order companies. Eur. J. Oper. Res., 40: 196-209.
-
(1989)
Eur. J. Oper. Res.
, vol.40
, pp. 196-209
-
-
Kingsman, B.G.1
Tatsiopoulos, I.P.2
Hendry, L.C.3
-
10
-
-
0027147723
-
Customer enquiry management: Part of a hierarchical system to control lead times in make-to-order companies
-
Hendry, L.C. and Kingsman, B.G., 1993. Customer enquiry management: Part of a hierarchical system to control lead times in make-to-order companies. J. Oper. Res., Soc., 44: 61-70.
-
(1993)
J. Oper. Res., Soc.
, vol.44
, pp. 61-70
-
-
Hendry, L.C.1
Kingsman, B.G.2
-
11
-
-
0023979312
-
Theory and practice of load-oriented manufacturing control
-
Bechte, W., 1988. Theory and practice of load-oriented manufacturing control. Int. J. Prod. Res., 26: 375-395.
-
(1988)
Int. J. Prod. Res.
, vol.26
, pp. 375-395
-
-
Bechte, W.1
-
12
-
-
0027609191
-
New concepts in production planning and control
-
Zapfel, G. and Missbauer, H., 1993. New concepts in production planning and control. Eur. J. Oper. Res., 67: 297-320.
-
(1993)
Eur. J. Oper. Res.
, vol.67
, pp. 297-320
-
-
Zapfel, G.1
Missbauer, H.2
-
13
-
-
0026953379
-
Capacity-based order review/release strategies to improve manufacturing performance
-
Philipoom, P.R. and Fry, T.D., 1992. Capacity-based order review/release strategies to improve manufacturing performance. Int. J. Prod. Res., 30: 2559-2572.
-
(1992)
Int. J. Prod. Res.
, vol.30
, pp. 2559-2572
-
-
Philipoom, P.R.1
Fry, T.D.2
-
14
-
-
0003710588
-
-
North River Press. Croton-on-Hudson, New York
-
Goldratt, E.M. and Fox, R.E., 1986, The Race. North River Press. Croton-on-Hudson, New York.
-
(1986)
The Race
-
-
Goldratt, E.M.1
Fox, R.E.2
-
15
-
-
0025414458
-
Coordinated production scheduling for make-to-order manufacturing
-
Markland, R.E., Darby-Dowman, K.H. and Minor, E.D., 1990. Coordinated production scheduling for make-to-order manufacturing, Eur. J. Oper. Res., 45: 155-176.
-
(1990)
Eur. J. Oper. Res.
, vol.45
, pp. 155-176
-
-
Markland, R.E.1
Darby-Dowman, K.H.2
Minor, E.D.3
-
16
-
-
0028516896
-
Capacity analysis in repetitive assemble-to-order manufacturing systems
-
Fumero, F. and Vercellis, C., 1994. Capacity analysis in repetitive assemble-to-order manufacturing systems. Eur. J. Oper. Res., 78: 204-21.
-
(1994)
Eur. J. Oper. Res.
, vol.78
, pp. 204-221
-
-
Fumero, F.1
Vercellis, C.2
-
17
-
-
0041511518
-
-
Production and Inventory Management. Prentice-Hall, Englewood Cliffs, NJ
-
Hax, A.C. and Candea, D., 1984, Production and Inventory Management. Prentice-Hall, Englewood Cliffs, NJ.
-
(1984)
-
-
Hax, A.C.1
Candea, D.2
-
18
-
-
84985824397
-
A hierarchical production planning and scheduling model
-
Bowers, M.R. and Jarvis, J.P., 1992. A hierarchical production planning and scheduling model. Dec. Sci., 23: 144-159.
-
(1992)
Dec. Sci.
, vol.23
, pp. 144-159
-
-
Bowers, M.R.1
Jarvis, J.P.2
-
19
-
-
0018996720
-
Design and implementation of a planning system in a rolling mill: A case study
-
Gelders, L.F. and Steelandt, F.V., 1980. Design and implementation of a planning system in a rolling mill: A case study. AIIE Trans., 22: 54-58.
-
(1980)
AIIE Trans.
, vol.22
, pp. 54-58
-
-
Gelders, L.F.1
Steelandt, F.V.2
-
20
-
-
0021494719
-
Aggregation and disaggregation in hierarchical production planning
-
Axsater, S. and Jönsson, H., 1984. Aggregation and disaggregation in hierarchical production planning, Eur. J. Oper. Res., 17: 338-350.
-
(1984)
Eur. J. Oper. Res.
, vol.17
, pp. 338-350
-
-
Axsater, S.1
Jönsson, H.2
-
21
-
-
0024127004
-
Planning horizons for multi-item hierarchical production scheduling problems: A heuristic search procedure
-
Chung, C.H., Chen, I.J. and Cheng, G.L.Y., 1988. Planning horizons for multi-item hierarchical production scheduling problems: A heuristic search procedure. Eur. J. Oper. Res., 37: 368-377.
-
(1988)
Eur. J. Oper. Res.
, vol.37
, pp. 368-377
-
-
Chung, C.H.1
Chen, I.J.2
Cheng, G.L.Y.3
-
22
-
-
0024640574
-
Hierarchical production planning for a modern steel manufacturing system
-
Lin, C.W. and Moodie, C.L., 1989. Hierarchical production planning for a modern steel manufacturing system. Int. J. Prod. Res., 27: 613-628.
-
(1989)
Int. J. Prod. Res.
, vol.27
, pp. 613-628
-
-
Lin, C.W.1
Moodie, C.L.2
-
23
-
-
0019038129
-
Computerized hierarchical production control in steel manufacture
-
Mackulak, G.T., Moodie, C.L. and Williams, T.J., 1980. Computerized hierarchical production control in steel manufacture. Int. J. Prod. Res., 18: 455-465.
-
(1980)
Int. J. Prod. Res.
, vol.18
, pp. 455-465
-
-
Mackulak, G.T.1
Moodie, C.L.2
Williams, T.J.3
-
24
-
-
3342898705
-
A modified hierarchical production planning system integrated with MRP: A case study
-
to appear
-
Özdamar, L., Yetis, N. and Atli, A.Ö., 1996. A modified hierarchical production planning system integrated with MRP: A case study, Prod. Planning Control, to appear.
-
(1996)
Prod. Planning Control
-
-
Özdamar, L.1
Yetis, N.2
Atli, A.Ö.3
-
25
-
-
38149144750
-
A hierarchical production planning system in the motor industry
-
Tsubone, H. and Sugawara, M., 1987. A hierarchical production planning system in the motor industry. OMEGA, 15: 113-120.
-
(1987)
OMEGA
, vol.15
, pp. 113-120
-
-
Tsubone, H.1
Sugawara, M.2
-
26
-
-
0001563910
-
Hierarchical production planning in a make-to-order company: A case study
-
Carravilla, M.A. and de Sousa, J.P., 1995. Hierarchical production planning in a make-to-order company: A case study. Eur. J. Oper. Res., 86: 43-56.
-
(1995)
Eur. J. Oper. Res.
, vol.86
, pp. 43-56
-
-
Carravilla, M.A.1
De Sousa, J.P.2
-
27
-
-
0043014352
-
-
unpublished MSc. Thesis, Engineering Management Graduate Program, Marmara University, Istanbul
-
Kanli, S., 1996, Production Planning for a Make-to-Order Company, unpublished MSc. Thesis, Engineering Management Graduate Program, Marmara University, Istanbul.
-
(1996)
Production Planning for a Make-to-Order Company
-
-
Kanli, S.1
|