메뉴 건너뛰기




Volumn 17, Issue 8, 2004, Pages 679-691

Design of a distributed order promising system and environment for a globally dispersed supply chain

Author keywords

[No Author keywords available]

Indexed keywords

CONTRACTS; CONTROL SYSTEM ANALYSIS; COSTS; CUSTOMER SATISFACTION; DATA ACQUISITION; DATA REDUCTION; MARKETING; OPTIMAL SYSTEMS; PLANNING;

EID: 9244234949     PISSN: 0951192X     EISSN: None     Source Type: Journal    
DOI: 10.1080/0951192042000237500     Document Type: Article
Times cited : (14)

References (25)
  • 3
    • 9244264197 scopus 로고    scopus 로고
    • A model for batch advanced available-to-promise
    • Robert H. Smith School of business, University of Maryland, Maryland
    • CHEN, C. Y., ZHAO, Z. Y. and BALL, M. O., 2000, A model for batch advanced available-to-promise. Internal report, Robert H. Smith School of business, University of Maryland, Maryland.
    • (2000) Internal Report
    • Chen, C.Y.1    Zhao, Z.Y.2    Ball, M.O.3
  • 5
    • 0034275944 scopus 로고    scopus 로고
    • Quoting manufacturing due dates subject to a service level constraint
    • HOPP, W. J. and ROOF STURGIS, M. L., 2000, Quoting manufacturing due dates subject to a service level constraint. IIE Transactions, 32, 771-784.
    • (2000) IIE Transactions , vol.32 , pp. 771-784
    • Hopp, W.J.1    Roof Sturgis, M.L.2
  • 6
    • 0032785527 scopus 로고    scopus 로고
    • Determining safety stocks for production planning in uncertain manufacturing
    • HUNG, Y. F. and CHANG, C. B., 1999, Determining safety stocks for production planning in uncertain manufacturing. International Journal of Production Economics, 38, 199-208.
    • (1999) International Journal of Production Economics , vol.38 , pp. 199-208
    • Hung, Y.F.1    Chang, C.B.2
  • 8
    • 0013367503 scopus 로고    scopus 로고
    • IMPReSS. An automated production planning and delivery quotation system at Harris Corporation-Semiconductor sector
    • LEACHMAN, R. C., BENSON, R. F., LIU, C. and RAAR, D. J., 1996, IMPReSS. An automated production planning and delivery quotation system at Harris Corporation-Semiconductor sector. Interfaces, 26, 6-37.
    • (1996) Interfaces , vol.26 , pp. 6-37
    • Leachman, R.C.1    Benson, R.F.2    Liu, C.3    Raar, D.J.4
  • 9
    • 0002823699 scopus 로고
    • Managing supply chain inventory: Pitfalls and opportunities
    • LEE, H. L. and BILLINGTON, C., 1992, Managing supply chain inventory: pitfalls and opportunities. Sloan Management Review, Spring, 65-73.
    • (1992) Sloan Management Review , Issue.SPRING , pp. 65-73
    • Lee, H.L.1    Billington, C.2
  • 13
    • 0342845324 scopus 로고    scopus 로고
    • The performance of workload rules for order acceptance in batch chemical manufacturing
    • RAAYMAKERS, W. H. M., BERTRAND, J. W. M. and FRANSOO, J. C., 2000, The performance of workload rules for order acceptance in batch chemical manufacturing. Journal of Intelligent Manufacturing, 11, 217-228.
    • (2000) Journal of Intelligent Manufacturing , vol.11 , pp. 217-228
    • Raaymakers, W.H.M.1    Bertrand, J.W.M.2    Fransoo, J.C.3
  • 16
    • 0035323831 scopus 로고    scopus 로고
    • MASCOT: An agent-based architecture for dynamic supply chain creation and coordination in the internet economy
    • SADEH, N. M., HILDUM, D. W., KJENSTAD, D., and TSENG, A., 2001, MASCOT: an agent-based architecture for dynamic supply chain creation and coordination in the internet economy. Production Planning and Control, 12, 212-223.
    • (2001) Production Planning and Control , vol.12 , pp. 212-223
    • Sadeh, N.M.1    Hildum, D.W.2    Kjenstad, D.3    Tseng, A.4
  • 17
    • 0034205729 scopus 로고    scopus 로고
    • Distributed planning and control systems for the virtual enterprise: Organizational requirements and development life cycle
    • SOARES, A. L., AZEVEDO, A. L. and DE SOUSA, J. P., 2000, Distributed planning and control systems for the virtual enterprise: organizational requirements and development life cycle. Journal of Intelligent Manufacturing, 11, 253-270.
    • (2000) Journal of Intelligent Manufacturing , vol.11 , pp. 253-270
    • Soares, A.L.1    Azevedo, A.L.2    De Sousa, J.P.3
  • 18
  • 22
    • 9244237918 scopus 로고    scopus 로고
    • Global available-to-promise
    • June
    • SAP, 1999, Global available-to-promise. White Paper, June (http://www.sap.com).
    • (1999) White Paper
  • 23
  • 24
    • 0032761070 scopus 로고    scopus 로고
    • Information management in production planning for a virtual enterprise
    • ZHOU, Q. and BESANT, C. B., 1999, Information management in production planning for a virtual enterprise. International Journal of Production Research, 37, 207-218.
    • (1999) International Journal of Production Research , vol.37 , pp. 207-218
    • Zhou, Q.1    Besant, C.B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.