메뉴 건너뛰기




Volumn 7, Issue 2, 1996, Pages 117-128

A review of capacity planning techniques within standard software packages

Author keywords

Capacity planning; Manufac turing resources planning; Scheduling; Sequencing; Standard software packages

Indexed keywords

COMPUTER SOFTWARE; MANUFACTURE; PRODUCTION CONTROL; RELIABILITY; ROBUSTNESS (CONTROL SYSTEMS); SCHEDULING;

EID: 0030104249     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537289608930335     Document Type: Article
Times cited : (37)

References (23)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams, J., and Balas, E., 1988, The shifting bottleneck procedure for job shop scheduling. Management Science, 43, 391-401
    • (1988) Management Science , vol.43 , pp. 391-401
    • Adams, J.1    Balas, E.2
  • 3
    • 0028413139 scopus 로고
    • Analytical modeling and experimental study of human workload in scheduling of advanced manufacturing systems
    • Bi, S., and Salvendy, G., 1994, Analytical modeling and experimental study of human workload in scheduling of advanced manufacturing systems. International Journal of Human Factors in Manufacturing, 4, 205-234
    • (1994) International Journal of Human Factors in Manufacturing , vol.4 , pp. 205-234
    • Bi, S.1    Salvendy, G.2
  • 5
    • 85025389994 scopus 로고
    • In one word: Not from experience
    • BREHMER, B., 1980, In one word: not from experience. Acta P.ycholngica, 45, 223-241
    • (1980) Acta P.Ycholngica , vol.45 , pp. 223-241
    • Brehmer, B.1
  • 6
    • 0344800680 scopus 로고
    • Models of diagnostic judgement
    • J. Rasmussen, K. Duncan and J. Leplat, Chichester: John Wiley & Sons
    • Brehmer, B., 1987, Models of diagnostic judgement. In J. Rasmussen, K. Duncan and J. Leplat (eds) New Technology and Human Error (Chichester: John Wiley & Sons), pp. 87-95
    • (1987) New Technology and Human Error , pp. 87-95
    • Brehmer, B.1
  • 8
    • 85010608780 scopus 로고
    • Architecture of a Factory Controller, PhD thesis, Delft University of Technology, Delft, The Netherlands
    • Drift, J. H. M., 1993, Architecture of a Factory Controller, PhD thesis, Delft University of Technology, Delft, The Netherlands
    • (1993)
    • Drift, J.H.M.1
  • 9
    • 0019585243 scopus 로고
    • A review of production scheduling
    • Graves, S. C., 1981, A review of production scheduling. Operations Research, 29, 646-675
    • (1981) Operations Research , vol.29 , pp. 646-675
    • Graves, S.C.1
  • 10
    • 6944240759 scopus 로고
    • A framework for improving performance in complex tasks
    • Centre de Recherche Public — Centre Universitaire, 28-30 September 1994, Luxembourg
    • Hart, M. W., and ’Wiers, T.V. C. S., 1994, A framework for improving performance in complex tasks. In Proceedings of the First European Conference Cognitive Science in Industry, Centre de Recherche Public — Centre Universitaire, 28-30 September 1994, Luxembourg
    • (1994) In Proceedings of the First European Conference Cognitive Science in Industry
    • Hart, M.W.1    Wiers, T.V.C.S.2
  • 11
    • 34249973653 scopus 로고
    • A survey of priority rule-based scheduling
    • Haupt, R., 1989, A survey of priority rule-based scheduling. OR Spektrum, 11, 3-16
    • (1989) OR Spektrum , vol.11 , pp. 3-16
    • Haupt, R.1
  • 12
    • 0025422983 scopus 로고
    • Why we still use our heads instead of formulas: Toward an integrative approach
    • Kleinmuntz, B., 1990, Why we still use our heads instead of formulas: toward an integrative approach. Psychological Bulletin, 107,296-310
    • (1990) Psychological Bulletin , vol.107 , pp. 296-310
    • Kleinmuntz, B.1
  • 15
    • 6944243403 scopus 로고
    • PhD thesis, Delft University of Technology, Delft University Press, Dcllt
    • Melles, B., and Wamelink, W. F., 1993, Production Control in Construction. PhD thesis, Delft University of Technology, Delft University Press, Dcllt
    • (1993) Production Control in Construction
    • Melles, B.1    Wamelink, W.F.2
  • 17
    • 0024956638 scopus 로고
    • The human planning and scheduling role in advanced manufacturing systems: An emerging human factors domain
    • Sanderson, P. M., 1989, The human planning and scheduling role in advanced manufacturing systems: an emerging human factors domain. Human Factors, 31, 635-666
    • (1989) Human Factors , vol.31 , pp. 635-666
    • Sanderson, P.M.1
  • 19
    • 84990557283 scopus 로고
    • A new framework for manufacturing planning and control systems
    • Sum, C. C., and Hill, A. V., 1993, A new framework for manufacturing planning and control systems. Decision Sciences, 24, 739-760
    • (1993) Decision Sciences , vol.24 , pp. 739-760
    • Sum, C.C.1    Hill, A.V.2
  • 21
    • 84952075848 scopus 로고
    • For manufacturing companies with MRP systems, Fallschurch, Va.: AP1CS
    • WEMMERLOV, U., 1984, Capacity Management Techniques (for manufacturing companies with MRP systems Fallschurch, Va.: AP1CS)
    • (1984) Capacity Management Techniques
    • Wemmerlov, U.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.