메뉴 건너뛰기




Volumn 27, Issue 1, 2016, Pages 251-262

Interoperability requirements for automated manufacturing systems in construction

Author keywords

Construction Data exchange Sustainable interoperability in AECO Automated manufacturing systems

Indexed keywords

APPLICATION PROGRAMS; AUTOMATION; ELECTRONIC DATA INTERCHANGE; INDUSTRIAL RESEARCH; LIFE CYCLE; MANUFACTURE;

EID: 85027921168     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-013-0862-7     Document Type: Article
Times cited : (47)

References (44)
  • 2
    • 30844442567 scopus 로고    scopus 로고
    • Feature-based interoperability between design and analysis processes
    • Aifaoui, N., Deneux, D., Soenen, R., et al. (2006). Feature-based interoperability between design and analysis processes. Journal of Intelligent Manufacturing, 17, 13–27. doi:10.1007/s10845-005-5510-4.
    • (2006) Journal of Intelligent Manufacturing , vol.17 , pp. 13-27
    • Aifaoui, N.1    Deneux, D.2    Soenen, R.3
  • 3
    • 85028251875 scopus 로고    scopus 로고
    • Civil engineering body of knowledge for the 21st century: Preparing the civil engineer for the future
    • ASCE, (2nd ed)
    • ASCE. (2008). Civil engineering body of knowledge for the 21st century: Preparing the civil engineer for the future (2nd ed), 191.
    • (2008) , pp. 101
  • 5
    • 85028252652 scopus 로고    scopus 로고
    • BIM Industry Working Group. (2011). A report for the Government Construction Client Group, 107
    • BIM Industry Working Group. (2011). A report for the Government Construction Client Group, 107.
  • 9
    • 85028276112 scopus 로고    scopus 로고
    • California U of S, Accessed 14 Apr 2013
    • California U of S. (2013). PowerPoint slides | contour crafting. http://www.contourcrafting.org/powerpoint-slides/. Accessed 14 Apr 2013.
    • (2000) Powerpoint Slides | Contour Crafting
  • 13
    • 85007231254 scopus 로고    scopus 로고
    • Accessed 14 Apr 2013
    • Dini, E. (2009). D-Shape. http://www.d-shape.com/cose.htm. Accessed 14 Apr 2013.
    • (2009) D-Shape
    • Dini, E.1
  • 17
    • 79958785956 scopus 로고    scopus 로고
    • Service-oriented manufacturing: A new product pattern andmanufacturing paradigm
    • Gao, J., Yao, Y., Zhu, V. C. Y., et al. (2009). Service-oriented manufacturing: A new product pattern andmanufacturing paradigm. Journal of IntelligentManufacturing, 22, 435–446. doi:10.1007/s10845-009-0301-y.
    • (2009) Journal of Intelligentmanufacturing , vol.22 , pp. 435-446
    • Gao, J.1    Yao, Y.2    Zhu, V.C.Y.3
  • 18
    • 77955711321 scopus 로고    scopus 로고
    • Value proposition on interoperability of BIM and collaborative working environments
    • Grilo, A., & Jardim-Goncalves, R. (2010).Value proposition on interoperability of BIM and collaborative working environments. Automation in Construction, 19, 522–530. doi:10.1016/j.autcon.2009.11.003.
    • (2010) Automation in Construction , vol.19 , pp. 522-530
    • Grilo, A.1    Jardim-Goncalves, R.2
  • 21
    • 85028274374 scopus 로고    scopus 로고
    • Web services business process execution language version 2.0, OASIS
    • Jordan, D., Evdemon, J., Alves, A., & Arkin, A. (2007). Web services business process execution language version 2.0 (pp. 1–264), OASIS.
    • (2007) , pp. 1-264
    • Jordan, D.1    Evdemon, J.2    Alves, A.3    Arkin, A.4
  • 22
    • 0347411216 scopus 로고    scopus 로고
    • Automated construction by contour craftingrelated robotics and information technologies
    • Khoshnevis, B. (2004). Automated construction by contour craftingrelated robotics and information technologies. Automation in Construction, 13, 5–19. doi:10.1016/j.autcon.2003.08.012.
    • (2004) Automation in Construction , vol.13 , pp. 5-19
    • Khoshnevis, B.1
  • 23
    • 74349095857 scopus 로고    scopus 로고
    • Engineering collaboration 2.0: Requirements and expectations
    • Klinc, R., Turk, Z., & Dolenc, M. (2009). Engineering collaboration 2.0: Requirements and expectations. ITcon, 14, 473–488.
    • (2009) Itcon , vol.14 , pp. 473-488
    • Klinc, R.1    Turk, Z.2    Dolenc, M.3
  • 25
    • 84875040447 scopus 로고    scopus 로고
    • Construction ccheduling using the constraint satisfaction problem method
    • Lorterapong, P., & Ussavadilokrit, M. (2012). Construction ccheduling using the constraint satisfaction problem method. Journal of ConstructionEngineering andManagement, 139, 414–422. doi:10.1061/(ASCE)CO.1943-7862.0000582.
    • (2012) Journal of Constructionengineering Andmanagement , vol.139 , pp. 414-422
    • Lorterapong, P.1    Ussavadilokrit, M.2
  • 26
    • 84876066849 scopus 로고    scopus 로고
    • An empirical investigation of information systems interoperability business value in European firms
    • Loukis, E. N., & Charalabidis, Y. K. (2013). An empirical investigation of information systems interoperability business value in European firms. Computers in Industry, 64, 412–420. doi:10.1016/j.compind.2013.01.005.
    • (2013) Computers in Industry , vol.64 , pp. 412-420
    • Loukis, E.N.1    Charalabidis, Y.K.2
  • 27
    • 79958825732 scopus 로고    scopus 로고
    • Machining precedence of 21/2D interacting features in a feature-based data model
    • Mokhtar, A., & Xu, X. (2009). Machining precedence of 21/2D interacting features in a feature-based data model. Journal of Intelligent Manufacturing, 22, 145–161. doi:10.1007/s10845-009-0268-8.
    • (2009) Journal of Intelligent Manufacturing , vol.22 , pp. 145-161
    • Mokhtar, A.1    Xu, X.2
  • 28
    • 67749134001 scopus 로고    scopus 로고
    • Dealing with feature interactions for prismatic parts in STEP-NC
    • Mokhtar, A., Xu, X., & Lazcanotegui, I. (2009). Dealing with feature interactions for prismatic parts in STEP-NC. Journal of Intelligent Manufacturing, 20, 431–445. doi:10.1007/s10845-008-0144-y.
    • (2009) Journal of Intelligent Manufacturing , vol.20 , pp. 431-445
    • Mokhtar, A.1    Xu, X.2    Lazcanotegui, I.3
  • 29
    • 85028278811 scopus 로고    scopus 로고
    • Object Management Group, BPMN, Accessed 27 Aug 2013
    • Object Management Group. (2013). BPMN. http://www.bpmn.org/. Accessed 27 Aug 2013.
    • (2013)
  • 31
  • 32
    • 79954420468 scopus 로고    scopus 로고
    • Can we grow buildings? Concepts and requirements for automated nano- to meter-scale building
    • Rebolj, D., Fischer, M., Endy, D., et al. (2011). Can we grow buildings? Concepts and requirements for automated nano- to meter-scale building. Advanced Engineering Informatics, 25, 390–398. doi:10.1016/j.aei.2010.08.006.
    • (2011) Advanced Engineering Informatics , vol.25 , pp. 390-398
    • Rebolj, D.1    Fischer, M.2    Endy, D.3
  • 34
  • 36
    • 51849095296 scopus 로고    scopus 로고
    • Measuring and modeling labor productivity using historical data. Journal of Construction Engineering and Management
    • Song, L., & AbouRizk, S. M. (2008). Measuring and modeling labor productivity using historical data. Journal of Construction Engineering and Management, 134, 786. doi:10.1061/(ASCE)0733-9364(2008)134:10(786).
    • (2008) , vol.134 , pp. 786
    • Song, L.1    Abourizk, S.M.2
  • 37
    • 0032206731 scopus 로고    scopus 로고
    • Construction labor productivity modeling with neural networks
    • Sonmez, R., & Rowings, J. E. (1998). Construction labor productivity modeling with neural networks. Journal of Construction Engineering and Management, 124, 498–504. doi:10.1061/(ASCE)0733-9364(1998)124:6(498).
    • (1998) Journal of Construction Engineering and Management , vol.124 , pp. 498-504
    • Sonmez, R.1    Rowings, J.E.2
  • 39
    • 0033871479 scopus 로고    scopus 로고
    • Automated construction system for high-rise reinforced concrete buildings
    • Wakisaka, T., Furuya, N., Inoue, Y., & Shiokawa, T. (2000). Automated construction system for high-rise reinforced concrete buildings. Automation in Construction, 9, 229–250. doi:10.1016/S0926-5805(99)00039-4.
    • (2000) Automation in Construction , vol.9 , pp. 229-250
    • Wakisaka, T.1    Furuya, N.2    Inoue, Y.3    Shiokawa, T.4
  • 40
    • 57549087017 scopus 로고    scopus 로고
    • Semi-automated model matching using version difference
    • Wang, H., Akinci, B., Garrett, J. H., et al. (2009). Semi-automated model matching using version difference. Advanced Engineering Informatics, 23, 1–11. doi:10.1016/j.aei.2008.05.005.
    • (2009) Advanced Engineering Informatics , vol.23 , pp. 1-11
    • Wang, H.1    Akinci, B.2    Garrett, J.H.3
  • 41
    • 77956317790 scopus 로고    scopus 로고
    • Bi-level framework for measuring performance to improve productivity of construction enterprises
    • Reston, VA: American Society of Civil Engineers
    • Wang, Q., El-Gafy, M., & Zha, J. (2010). Bi-level framework for measuring performance to improve productivity of construction enterprises. In Constr. Res. Congr. (pp. 970–979). Reston, VA: American Society of Civil Engineers.
    • (2010) Constr. Res. Congr , pp. 970-979
    • Wang, Q.1    El-Gafy, M.2    Zha, J.3
  • 42
    • 67650085635 scopus 로고    scopus 로고
    • Using agent-based modeling to study construction labor productivity as an emergent property of individual and crew interactions
    • Watkins, M., Mukherjee, A., Onder, N., & Mattila, K. (2009). Using agent-based modeling to study construction labor productivity as an emergent property of individual and crew interactions. Journal of Construction Engineering and Management, 135, 657. doi:10.1061/(ASCE)CO.1943-7862.0000022.
    • (2009) Journal of Construction Engineering and Management , vol.135 , pp. 657
    • Watkins, M.1    Mukherjee, A.2    Onder, N.3    Mattila, K.4
  • 44
    • 84872406206 scopus 로고    scopus 로고
    • Complexity analysis of distributed measuring and sensing network inmultistage machining processes
    • Zhang, F., & Jiang, P. (2013). Complexity analysis of distributed measuring and sensing network inmultistage machining processes. Journal of Intelligent Manufacturing, 24, 55–69. doi:10.1007/s10845-011-0538-0.
    • (2013) Journal of Intelligent Manufacturing , vol.24 , pp. 55-69
    • Zhang, F.1    Jiang, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.