메뉴 건너뛰기




Volumn 131, Issue 11, 2005, Pages 1179-1185

Concurrent engineering approach to reducing design delivery time

Author keywords

Building design; Construction industry; Delivery; Fast track construction; Project management

Indexed keywords

BUILDING DESIGN; DELIVERY; FAST TRACK CONSTRUCTION; OVERLAPPING;

EID: 27744532171     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:11(1179)     Document Type: Article
Times cited : (71)

References (19)
  • 1
    • 33644583983 scopus 로고    scopus 로고
    • Positive vs negative iteration in design
    • Brighton, U.K.
    • Ballard, G. (2000). "Positive vs negative iteration in design." IGLC-8, Brighton, U.K.
    • (2000) IGLC-8
    • Ballard, G.1
  • 5
    • 0012039586 scopus 로고    scopus 로고
    • Concurrent engineering: A schedule reduction tool
    • Eldin, N. N. (1997). "Concurrent engineering: A schedule reduction tool." J. Constr. Eng. Manage., 123(3), 354-362.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 354-362
    • Eldin, N.N.1
  • 6
    • 0030147006 scopus 로고    scopus 로고
    • Managing the simultaneous execution of coupled phases in concurrent product development
    • Krishnan, V. (1996). "Managing the simultaneous execution of coupled phases in concurrent product development." IEEE Trans. Eng. Manage., 43(2), 210-217.
    • (1996) IEEE Trans. Eng. Manage. , vol.43 , Issue.2 , pp. 210-217
    • Krishnan, V.1
  • 7
    • 0029544690 scopus 로고
    • Accelerating product development by the exchange of preliminary product design information
    • Krishnan, V., Eppinger, S. D., and Whitney, D. E. (1995). "Accelerating product development by the exchange of preliminary product design information." ASME J. Mech. Des., 117, 491-498.
    • (1995) ASME J. Mech. Des. , vol.117 , pp. 491-498
    • Krishnan, V.1    Eppinger, S.D.2    Whitney, D.E.3
  • 8
    • 0031108561 scopus 로고    scopus 로고
    • A model-based framework to overlap product development activities
    • Krishnan, V., Eppinger, S. D., and Whitney, D. E. (1997). "A model-based framework to overlap product development activities." Manage. Sci., 43(4), 437-451.
    • (1997) Manage. Sci. , vol.43 , Issue.4 , pp. 437-451
    • Krishnan, V.1    Eppinger, S.D.2    Whitney, D.E.3
  • 9
    • 0032140351 scopus 로고    scopus 로고
    • Communication and uncertainty in concurrent engineering
    • Loch, C., and Terwiesch, C. (1998). "Communication and uncertainty in concurrent engineering." Manage. Sci., 44(8), 1032.
    • (1998) Manage. Sci. , vol.44 , Issue.8 , pp. 1032
    • Loch, C.1    Terwiesch, C.2
  • 11
    • 17244362051 scopus 로고    scopus 로고
    • Dynamic planning and control methodology for design/build fast-track construction projects
    • Pena-Mora, F., and Li, M. (2001). "Dynamic planning and control methodology for design/build fast-track construction projects." J. Constr. Eng. Manage., 127(1), 1-17.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.1 , pp. 1-17
    • Pena-Mora, F.1    Li, M.2
  • 14
    • 0034313848 scopus 로고    scopus 로고
    • Time-cost trade-offs in overlapped product development
    • Roemer, T. A., Ahmadi, R., and Wang, R. H. (2000). "Time-cost trade-offs in overlapped product development." Oper. Res., 48(6), 858-865.
    • (2000) Oper. Res. , vol.48 , Issue.6 , pp. 858-865
    • Roemer, T.A.1    Ahmadi, R.2    Wang, R.H.3
  • 16
    • 0036638665 scopus 로고    scopus 로고
    • Exchanging preliminary information in concurrent engineering: Alternative coordination strategies
    • Terwiesch, C., Loch, C. H., and De Meyer, A. (2002). "Exchanging preliminary information in concurrent engineering: Alternative coordination strategies." Org. Sci., 13(4), 402-419.
    • (2002) Org. Sci. , vol.13 , Issue.4 , pp. 402-419
    • Terwiesch, C.1    Loch, C.H.2    De Meyer, A.3
  • 17
    • 0036641080 scopus 로고    scopus 로고
    • Mine customer experiences
    • White, E., Behara, R., and Babbar, S. (2002). "Mine customer experiences." Qual. Prog., 35(7), 63-67.
    • (2002) Qual. Prog. , vol.35 , Issue.7 , pp. 63-67
    • White, E.1    Behara, R.2    Babbar, S.3
  • 18
    • 0032634750 scopus 로고    scopus 로고
    • A decision analytic framework for evaluating concurrent engineering
    • Yassine, A. A., Chelst, K. R., and Falkenburg, D. R. (1999). "A decision analytic framework for evaluating concurrent engineering." IEEE Trans. Eng. Manage., 46(2), 144-157.
    • (1999) IEEE Trans. Eng. Manage. , vol.46 , Issue.2 , pp. 144-157
    • Yassine, A.A.1    Chelst, K.R.2    Falkenburg, D.R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.