메뉴 건너뛰기




Volumn , Issue , 2013, Pages 1-577

Handbook of manufacturing control: Fundamentals, description, configuration

Author keywords

[No Author keywords available]

Indexed keywords

HANDBOOKS;

EID: 85026684704     PISSN: None     EISSN: None     Source Type: Book    
DOI: 10.1007/978-3-642-24458-2     Document Type: Book
Times cited : (154)

References (262)
  • 2
    • 0004663130 scopus 로고    scopus 로고
    • Rückstandsorientierte Produktionsregelung von Fertigungsbereichen
    • Brei-01, VDI Progress Reports, Series 2, Düsseldorf
    • [Brei-01] Breithaupt, J.-W.: Rückstandsorientierte Produktionsregelung von Fertigungsbereichen. Grundlagen und Anwendung. VDI Progress Reports, Series 2, No. 571, Düsseldorf (2001)
    • (2001) Grundlagen und Anwendung , Issue.571
    • Breithaupt, J.-W.1
  • 5
    • 0000861722 scopus 로고
    • A proof of the queuing formula: L = Lambda W
    • Litt-61*
    • [Litt-61*] Little, J.D.C.: A proof of the queuing formula: L = Lambda W. Oper. Res. 9(3), 383-387 (1961)
    • (1961) Oper. Res. , vol.9 , Issue.3 , pp. 383-387
    • Little, J.D.C.1
  • 11
    • 85026692161 scopus 로고    scopus 로고
    • Pete-96, VDI Progress Reports, Series 20, Düsseldorf
    • [Pete-96] Petermann, D.: Modellbasierte Produktionsregelung. VDI Progress Reports, Series 20, No. 193, Düsseldorf (1996)
    • (1996) Modellbasierte Produktionsregelung , Issue.193
    • Petermann, D.1
  • 16
    • 0002274219 scopus 로고
    • Input/Output control. A real handle on lead time
    • Wigh-70*
    • [Wigh-70*] Wight, O.: Input/Output control. A real handle on lead time. Prod. Invent. Manag. 11, 9-31 (1970)
    • (1970) Prod. Invent. Manag. , vol.11 , pp. 9-31
    • Wight, O.1
  • 18
    • 33645675694 scopus 로고    scopus 로고
    • Delo-98*, Selbstverlag, Düsseldorf
    • [Delo-98*] Deloitte & Touche Consulting: Vision in Manufacturing. Selbstverlag, Düsseldorf (1998)
    • (1998) Vision in Manufacturing
  • 22
    • 33750082911 scopus 로고
    • Grundlagen der Betriebswirtschaftslehre
    • Gute-51, Springer, Berlin
    • [Gute-51] Gutenberg, E.: Grundlagen der Betriebswirtschaftslehre. Die Produktion, vol. 1. Springer, Berlin (1951)
    • (1951) Die Produktion , vol.1
    • Gutenberg, E.1
  • 23
    • 0002303124 scopus 로고
    • Triumph of the lean production system
    • Kraf-88*
    • [Kraf-88*] Krafcik, J.F.: Triumph of the lean production system. Sloan Manage.Rev. 30, 41-51 (1988)
    • (1988) Sloan Manage.Rev. , vol.30 , pp. 41-51
    • Krafcik, J.F.1
  • 27
    • 16744364386 scopus 로고
    • Adaptable kanban system helps toyota maintain just-in-time production
    • Mond-81*
    • [Mond-81*] Monden, Y.: Adaptable kanban system helps toyota maintain just-in-time production. Ind. Eng. 13(5), 28-46 (1981)
    • (1981) Ind. Eng. , vol.13 , Issue.5 , pp. 28-46
    • Monden, Y.1
  • 28
    • 0003449926 scopus 로고    scopus 로고
    • Toyota Production System
    • Mond-98*, Engineering & Management Press, Norcross
    • [Mond-98*] Monden, Y.: Toyota Production System. An Integrated Approach to Just-In-Time. Engineering & Management Press, Norcross (1998)
    • (1998) An Integrated Approach to Just-In-Time
    • Monden, Y.1
  • 33
    • 0003749677 scopus 로고    scopus 로고
    • Quick Response Manufacturing
    • Suri-98*, Productivity Press, Portland
    • [Suri-98*] Suri, R.: Quick Response Manufacturing. A Companywide Approach to Reducing Lead Times. Productivity Press, Portland (1998)
    • (1998) A Companywide Approach to Reducing Lead Times
    • Suri, R.1
  • 45
    • 33750035675 scopus 로고
    • Verbesserung der Termineinhaltung in komplexen Fertigungsbereichen durch einen neuen Ansatz zur Plandurchlaufzeitermittlung
    • Ludw-92, Görke, W., Rininsland, H., Syrbe, M. (eds.), Springer, Berlin
    • [Ludw-92] Ludwig, E., Nyhuis, P.: Verbesserung der Termineinhaltung in komplexen Fertigungsbereichen durch einen neuen Ansatz zur Plandurchlaufzeitermittlung. In: Görke, W., Rininsland, H., Syrbe, M. (eds.) Information als Produktionsfaktor, pp. 473-483. Springer, Berlin (1992)
    • (1992) Information als Produktionsfaktor , pp. 473-483
    • Ludwig, E.1    Nyhuis, P.2
  • 51
    • 85026711206 scopus 로고    scopus 로고
    • Pete-96, VDI Progress Reports, Series 20, Düsseldorf
    • [Pete-96] Petermann, D.: Modellbasierte Produktionsregelung. VDI Progress Reports, Series 20, No. 193, Düsseldorf (1996)
    • (1996) Modellbasierte Produktionsregelung , Issue.193
    • Petermann, D.1
  • 59
    • 85026692926 scopus 로고
    • Kurzfristige Fertigungssteuerung mit Leitständen
    • Dang-86
    • [Dang-86] Dangelmaier, W., Aldinger, L.: Kurzfristige Fertigungssteuerung mit Leitständen. Werkstattstechnik 76(2), 101-104 (1986)
    • (1986) Werkstattstechnik , vol.76 , Issue.2 , pp. 101-104
    • Dangelmaier, W.1    Aldinger, L.2
  • 62
    • 85026689436 scopus 로고
    • Produktplanung eines Maschinenbaukonzerns
    • Hegi-74
    • [Hegi-74] Hegi, O., Wiendahl, H.-P.: Produktplanung eines Maschinenbaukonzerns. Congena-Texte 1/2, 3-14 (1974)
    • (1974) Congena-Texte , vol.1-2 , pp. 3-14
    • Hegi, O.1    Wiendahl, H.-P.2
  • 64
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • Kirk-83*
    • [Kirk-83*] Kirkpatrick, S., Gelatt, C.D., Vecchi, M.P.: Optimization by simulated annealing. Science 220(4598), 671-680 (1983)
    • (1983) Science , vol.220 , Issue.4598 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt, C.D.2    Vecchi, M.P.3
  • 69
    • 0003766934 scopus 로고
    • A Revolution in Manufacturing
    • Shin-85*, Productivity Press, Portland
    • [Shin-85*] Shingo, S.: A Revolution in Manufacturing. The SMED System. Productivity Press, Portland (1985)
    • (1985) The SMED System
    • Shingo, S.1
  • 70
    • 77952999013 scopus 로고    scopus 로고
    • Das synchrone Produktionssystem
    • Take-99, Verlag Moderne Industrie, Landsberg
    • [Take-99] Takeda, H.: Das synchrone Produktionssystem. Just-in-time für das ganze Unternehmen. Verlag Moderne Industrie, Landsberg (1999)
    • (1999) Just-in-time für das ganze Unternehmen
    • Takeda, H.1
  • 74
    • 85026720254 scopus 로고    scopus 로고
    • Dimensionierung und Bewertung von Fertigungsinseln mit logistischen Kennlinien
    • Lödd-01b
    • [Lödd-01b] Lödding, H., Hernández, R., Wiendahl, H.-P.: Dimensionierung und Bewertung von Fertigungsinseln mit logistischen Kennlinien. Io Manage. 70(1-2), 25-32 (2001)
    • (2001) Io Manage. , vol.70 , Issue.1-2 , pp. 25-32
    • Lödding, H.1    Hernández, R.2    Wiendahl, H.-P.3
  • 77
    • 84888938083 scopus 로고    scopus 로고
    • Kundenindividuelle Massenproduktion
    • Pill-98*, Carl Hanser Verlag, Munich/Vienna
    • [Pill-98*] Piller, F.T.: Kundenindividuelle Massenproduktion. Die Wettbewerbsstrategie der Zukunft. Carl Hanser Verlag, Munich/Vienna (1998)
    • (1998) Die Wettbewerbsstrategie der Zukunft
    • Piller, F.T.1
  • 78
    • 0003725468 scopus 로고
    • Pine-93, Harvard Business School Press, Boston
    • [Pine-93] Pine, B.J.: Mass Customization. Harvard Business School Press, Boston (1993)
    • (1993) Mass Customization
    • Pine, B.J.1
  • 79
    • 24244474350 scopus 로고    scopus 로고
    • Röhr-02, Dissertation, Universität Hannover 2002, veröffentlicht in: Fortschritt-Berichte VDI, Reihe 2, Düsseldorf
    • [Röhr-02] Röhrig, M.: Variantenbeherrschung mit hochflexiblen Produktionsendstufen. Dissertation, Universität Hannover 2002, veröffentlicht in: Fortschritt-Berichte VDI, Reihe 2, Nr. 622, Düsseldorf (2002)
    • (2002) Variantenbeherrschung mit hochflexiblen Produktionsendstufen , Issue.622
    • Röhrig, M.1
  • 81
    • 85026708354 scopus 로고    scopus 로고
    • Manufacturing system operating curves
    • Schn-02b, Nyhuis, P., Wiendahl, H.-P. (eds.), Springer, Berlin
    • [Schn-02b] Schneider, M.: Manufacturing system operating curves. In: Nyhuis, P., Wiendahl, H.-P. (eds.) Fundamentals of Production Logistics, pp. 112-117. Springer, Berlin (2002)
    • (2002) Fundamentals of Production Logistics , pp. 112-117
    • Schneider, M.1
  • 84
    • 85026694414 scopus 로고    scopus 로고
    • Produzieren im turbulenten Umfeld der Halbleiterindustrie Teil 2: Einsatz der Betriebskennlinie im turbulenten Umfeld
    • Stüh-99
    • [Stüh-99] Stühler, L., Schmidt, M., Wiendahl, H.-H.: Produzieren im turbulenten Umfeld der Halbleiterindustrie Teil 2: Einsatz der Betriebskennlinie im turbulenten Umfeld. PPS-Management 4(3), 14-20 (1999)
    • (1999) PPS-Management , vol.4 , Issue.3 , pp. 14-20
    • Stühler, L.1    Schmidt, M.2    Wiendahl, H.-H.3
  • 87
    • 84993102427 scopus 로고    scopus 로고
    • Supply chain management: A strategic perspective
    • Bech-97*
    • [Bech-97*] Bechtel, C., Jayaram, J.: Supply chain management: a strategic perspective. Int. J. Logist. Manag. 8(1), 15-34 (1997)
    • (1997) Int. J. Logist. Manag. , vol.8 , Issue.1 , pp. 15-34
    • Bechtel, C.1    Jayaram, J.2
  • 88
  • 91
    • 0002823699 scopus 로고
    • Managing supply chain inventory: Pitfalls and opportunities
    • Lee-92*
    • [Lee-92*] Lee, L.H., Billington, C.: Managing supply chain inventory: pitfalls and opportunities. Sloan Manage.Rev. 33(3), 65-73 (1992)
    • (1992) Sloan Manage.Rev. , vol.33 , Issue.3 , pp. 65-73
    • Lee, L.H.1    Billington, C.2
  • 92
    • 0002663868 scopus 로고    scopus 로고
    • The Bullwhip effect in supply chains
    • Lee-97*
    • [Lee-97*] Lee, L.H., Padmanabhan, V., Whang, S.: The Bullwhip effect in supply chains. Sloan Manage.Rev. 38, 93-102 (1997)
    • (1997) Sloan Manage.Rev. , vol.38 , pp. 93-102
    • Lee, L.H.1    Padmanabhan, V.2    Whang, S.3
  • 93
    • 0031108822 scopus 로고    scopus 로고
    • Information distortion in a supply chain: The Bullwhip effect
    • Lee-97b*
    • [Lee-97b*] Lee, L.H., Padmanabhan, V., Whang, S.: Information distortion in a supply chain: the Bullwhip effect. Manag. Sci. 43(4), 546-558 (1997)
    • (1997) Manag. Sci. , vol.43 , Issue.4 , pp. 546-558
    • Lee, L.H.1    Padmanabhan, V.2    Whang, S.3
  • 94
    • 0000861722 scopus 로고
    • A proof of the queuing formula: L = Lambda W
    • Litt-61*
    • [Litt-61*] Little, J.D.C.: A proof of the queuing formula: L = Lambda W. Oper. Res. 9(3), 383-387 (1961)
    • (1961) Oper. Res. , vol.9 , Issue.3 , pp. 383-387
    • Little, J.D.C.1
  • 97
    • 77953820750 scopus 로고    scopus 로고
    • Verstärkung des Bullwhip-Effekts durch konstante Plan-Durchlaufzeiten
    • Schö-03
    • [Schö-03] Schönsleben, P., Lödding, H., Nienhaus, J.: Verstärkung des Bullwhip-Effekts durch konstante Plan-Durchlaufzeiten. PPS-Management 8(1), 41-44 (2003)
    • (2003) PPS-Management , vol.8 , Issue.1 , pp. 41-44
    • Schönsleben, P.1    Lödding, H.2    Nienhaus, J.3
  • 103
    • 85026705117 scopus 로고    scopus 로고
    • Verbesserung der Produktionslogistik durch Losgrößenharmonisierung
    • Grei-97, Scientific Reports of the Institute for Material Handling and Logistics, University of Karlsruhe (TH), Karlsruhe
    • [Grei-97] Greiling, M.: Verbesserung der Produktionslogistik durch Losgrößenharmonisierung. Ein bedientheoretisch basierter Ansatz. Scientific Reports of the Institute for Material Handling and Logistics, University of Karlsruhe (TH), Karlsruhe (1997)
    • (1997) Ein bedientheoretisch basierter Ansatz
    • Greiling, M.1
  • 105
    • 0003449926 scopus 로고    scopus 로고
    • Toyota Production System
    • Mond-98*, Engineering & Management Press, Norcross
    • [Mond-98*] Monden, Y.: Toyota Production System. An Integrated Approach to Just-In-Time. Engineering & Management Press, Norcross (1998)
    • (1998) An Integrated Approach to Just-In-Time
    • Monden, Y.1
  • 110
    • 0026153765 scopus 로고
    • Determining the number of Kanbans in a multiproduct, multistage production system
    • Bard-91*
    • [Bard-91*] Bard, J.F., Golany, B.: Determining the number of Kanbans in a multiproduct, multistage production system. Int. J. Prod. Res. 29(5), 881-895 (1991)
    • (1991) Int. J. Prod. Res. , vol.29 , Issue.5 , pp. 881-895
    • Bard, J.F.1    Golany, B.2
  • 111
    • 84986958388 scopus 로고
    • A review of the Kanban production control research literature
    • Berk-92*
    • [Berk-92*] Berkley, B.J.: A review of the Kanban production control research literature. Prod. Oper. Manag. 1(4), 393-411 (1992)
    • (1992) Prod. Oper. Manag. , vol.1 , Issue.4 , pp. 393-411
    • Berkley, B.J.1
  • 112
    • 84870382752 scopus 로고    scopus 로고
    • Kanban-Prinzipien optimieren den Materialfluss bei DaimlerChrysler
    • Bodl-00
    • [Bodl-00] Bodlien, H.-G., Christmann-Jacoby, H.: Kanban-Prinzipien optimieren den Materialfluss bei DaimlerChrysler. PPS-Management 5(3), 56-59 (2000)
    • (2000) PPS-Management , vol.5 , Issue.3 , pp. 56-59
    • Bodlien, H.-G.1    Christmann-Jacoby, H.2
  • 113
    • 0031095866 scopus 로고    scopus 로고
    • A comparison of production-line control mechanisms
    • Bonv-97*
    • [Bonv-97*] Bonvik, A.M., Couch, C.E., Gershwin, B.S.: A comparison of production-line control mechanisms. Int. J. Prod. Res. 35(3), 789-804 (1997)
    • (1997) Int. J. Prod. Res. , vol.35 , Issue.3 , pp. 789-804
    • Bonvik, A.M.1    Couch, C.E.2    Gershwin, B.S.3
  • 115
    • 85026715715 scopus 로고    scopus 로고
    • Ausprägungen der Produktionsplanung und -steuerung
    • Ever-99, Eversheim, W., Schuh, G. (eds.), Springer, Berlin
    • [Ever-99] Eversheim, W. et al.: Ausprägungen der Produktionsplanung und -steuerung. In: Eversheim, W., Schuh, G. (eds.): Produktion und Management, vol. 4, pp. 14-60 -14-83. Springer, Berlin (1999)
    • (1999) Produktion und Management , vol.4 , pp. 14-60-14-83
    • Eversheim, W.1
  • 118
    • 0022062163 scopus 로고
    • Just-in-time manufacturing system: A periodic pull system
    • Kim-85*
    • [Kim-85*] Kim, T.-M.: Just-in-time manufacturing system: a periodic pull system. Int. J. Prod. Res. 23(3), 553-562 (1985)
    • (1985) Int. J. Prod. Res. , vol.23 , Issue.3 , pp. 553-562
    • Kim, T.-M.1
  • 120
    • 85026720254 scopus 로고    scopus 로고
    • Dimensionierung und Bewertung von Fertigungsinseln mit logistischen Kennlinien
    • Lödd-01b
    • [Lödd-01b] Lödding, H., Hernández, R., Wiendahl, H.-P.: Dimensionierung und Bewertung von Fertigungsinseln mit logistischen Kennlinien. Io Manage. 70(1-2), 25-32 (2001)
    • (2001) Io Manage. , vol.70 , Issue.1-2 , pp. 25-32
    • Lödding, H.1    Hernández, R.2    Wiendahl, H.-P.3
  • 121
    • 0000099070 scopus 로고
    • A Unified Modeling of Kanban Systems Using Petri Nets
    • Masc-91*
    • [Masc-91*] Mascolo, M., et al.: A Unified Modeling of Kanban Systems Using Petri Nets. Int. J. Flex. Manuf. Syst. 3(3/4), 275-307 (1991)
    • (1991) Int. J. Flex. Manuf. Syst. , vol.3 , Issue.3-4 , pp. 275-307
    • Mascolo, M.1
  • 122
    • 0025564738 scopus 로고
    • Analysis of a Kanban discipline for cell coordination in production lines I
    • Mitr-90*
    • [Mitr-90*] Mitra, D., Mitrani, I.: Analysis of a Kanban discipline for cell coordination in production lines I. Manag. Sci. 36(12), 1548-1566 (1990)
    • (1990) Manag. Sci. , vol.36 , Issue.12 , pp. 1548-1566
    • Mitra, D.1    Mitrani, I.2
  • 123
    • 0003449926 scopus 로고    scopus 로고
    • Toyota Production System
    • Mond-98*, Engineering & Management Press, Norcross
    • [Mond-98*] Monden, Y.: Toyota Production System. An Integrated Approach to Just-In-Time. Engineering & Management Press, Norcross (1998)
    • (1998) An Integrated Approach to Just-In-Time
    • Monden, Y.1
  • 124
    • 0041453085 scopus 로고
    • A categorized survey of the JIT literature
    • Mora-91*
    • [Mora-91*] Moras, R.G., Jalali, M.R., Dudek, R.A.: A categorized survey of the JIT literature. Prod. Plan. Control 2(4), 322-334 (1991)
    • (1991) Prod. Plan. Control , vol.2 , Issue.4 , pp. 322-334
    • Moras, R.G.1    Jalali, M.R.2    Dudek, R.A.3
  • 125
  • 127
    • 0004220333 scopus 로고
    • Toyota Production System
    • Ohno-88*, Productivity Press, Portland
    • [Ohno-88*] Ohno, T.: Toyota Production System. Beyond Large-Scale Production. Productivity Press, Portland (1988)
    • (1988) Beyond Large-Scale Production
    • Ohno, T.1
  • 128
    • 0024715082 scopus 로고
    • A comparative analysis of an MRP lot-forlot system and a Kanban system for a multistage production operation
    • Rees-89*
    • [Rees-89*] Rees, L.P., Huang, P.Y., Taylor, B.W.: A comparative analysis of an MRP lot-forlot system and a Kanban system for a multistage production operation. Int. J. Prod. Res. 27(8), 1427-1443 (1989)
    • (1989) Int. J. Prod. Res. , vol.27 , Issue.8 , pp. 1427-1443
    • Rees, L.P.1    Huang, P.Y.2    Taylor, B.W.3
  • 129
    • 0003766934 scopus 로고
    • A Revolution in Manufacturing
    • Shin-85*, Productivity Press, Portland
    • [Shin-85*] Shingo, S.: A Revolution in Manufacturing. The SMED System. Productivity Press, Portland (1985)
    • (1985) The SMED System
    • Shingo, S.1
  • 130
    • 0024139789 scopus 로고
    • Allocating buffer storages in a pull system
    • So-88*
    • [So-88*] So, K.C., Pinault, S.C.: Allocating buffer storages in a pull system. Int. J. Prod. Res. 26(12), 1959-1980 (1988)
    • (1988) Int. J. Prod. Res. , vol.26 , Issue.12 , pp. 1959-1980
    • So, K.C.1    Pinault, S.C.2
  • 131
    • 0025682903 scopus 로고
    • The impact of buffering strategies on the performance of production line systems
    • So-90*
    • [So-90*] So, K.C.: The impact of buffering strategies on the performance of production line systems. Int. J. Prod. Res. 28(12), 2293-2307 (1990)
    • (1990) Int. J. Prod. Res. , vol.28 , Issue.12 , pp. 2293-2307
    • So, K.C.1
  • 132
    • 0032044737 scopus 로고    scopus 로고
    • Kanban implementation between a heavy manufacturing department and foundry suppliers
    • Spen-98*
    • [Spen-98*] Spencer, M.S., Larsen, D.: Kanban implementation between a heavy manufacturing department and foundry suppliers. Prod. Plan. Control 9(3), 311-316 (1998)
    • (1998) Prod. Plan. Control , vol.9 , Issue.3 , pp. 311-316
    • Spencer, M.S.1    Larsen, D.2
  • 133
    • 0017557653 scopus 로고
    • Toyota production system and Kanban system - materialization of just-in-time and respect-for-human system
    • Sugi-77*
    • [Sugi-77*] Sugimori, Y., Kusunoki, K., Cho, F., Uchikawa, S.: Toyota production system and Kanban system - materialization of just-in-time and respect-for-human system. Int. J. Prod. Res. 15(6), 553-564 (1977)
    • (1977) Int. J. Prod. Res. , vol.15 , Issue.6 , pp. 553-564
    • Sugimori, Y.1    Kusunoki, K.2    Cho, F.3    Uchikawa, S.4
  • 134
    • 0025488637 scopus 로고
    • Modelling kanban-based demand-pull systems: A survey and critique
    • Uzso-90*
    • [Uzso-90*] Uzsoy, R., Martin-Vega, L.A.: Modelling kanban-based demand-pull systems: a survey and critique. Manuf. Rev. 3(3), 155-160 (1990)
    • (1990) Manuf. Rev. , vol.3 , Issue.3 , pp. 155-160
    • Uzsoy, R.1    Martin-Vega, L.A.2
  • 138
    • 0002082384 scopus 로고
    • Integrating kanban type pull systems and MRP type push systems: Insights from a Markovian model
    • Dele-92*
    • [Dele-92*] Deleersnyder, J.-L., et al.: Integrating kanban type pull systems and MRP type push systems: insights from a Markovian model. IIE Trans. 24(3), 43-56 (1992)
    • (1992) IIE Trans. , vol.24 , Issue.3 , pp. 43-56
    • Deleersnyder, J.-L.1
  • 140
    • 0031095866 scopus 로고    scopus 로고
    • A comparison of production-line control mechanisms
    • Bonv-97*
    • [Bonv-97*] Bonvik, A.M., Couch, C.E., Gershwin, B.S.: A comparison of production-line control mechanisms. Int. J. Prod. Res. 35, 789-804 (1997)
    • (1997) Int. J. Prod. Res. , vol.35 , pp. 789-804
    • Bonvik, A.M.1    Couch, C.E.2    Gershwin, B.S.3
  • 142
    • 85026686434 scopus 로고    scopus 로고
    • Hein-86, Fortschrittszahlen als Instrument zur Fertigungsplanung und -steuerung bei der Daimler-Benz AG, Presentation during the ACTIS seminar “Flexible Fertigungsorganisation durch DF€U und Fortschrittszahlen”
    • [Hein-86] Heinemeyer, W.: Fortschrittszahlen als Instrument zur Fertigungsplanung und -steuerung bei der Daimler-Benz AG, Presentation during the ACTIS seminar “Flexible Fertigungsorganisation durch DF€U und Fortschrittszahlen”
    • Heinemeyer, W.1
  • 143
    • 0042023284 scopus 로고
    • Produktionsplanung und -steuerung mit Fortschrittszahlen für interdependente Fertigungs- und Montageprozesse
    • Hein-88
    • [Hein-88] Heinemeyer, W.: Produktionsplanung und -steuerung mit Fortschrittszahlen für interdependente Fertigungs- und Montageprozesse. RKW-Handbuch der Logistik, 14th delivery XII, pp. 1-46. (1988)
    • (1988) RKW-Handbuch der Logistik, 14th delivery , vol.12 , pp. 1-46
    • Heinemeyer, W.1
  • 144
    • 85026693062 scopus 로고
    • Die Fortschrittszahlen als logistisches Konzept in der Automobilindustrie
    • Hein-94, Corsten, H. (ed.), Gabler, Wiesbaden
    • [Hein-94] Heinemeyer, W.: Die Fortschrittszahlen als logistisches Konzept in der Automobilindustrie. In: Corsten, H. (ed.) Handbuch Produktionsmanagement. Strategie, Führung, Technologie, Schnittstellen, pp. 221-236. Gabler, Wiesbaden (1994)
    • (1994) Handbuch Produktionsmanagement. Strategie, Führung, Technologie, Schnittstellen , pp. 221-236
    • Heinemeyer, W.1
  • 145
    • 85026705815 scopus 로고
    • Erfahrungen mit einem EDV-gestützten Fortschrittszahlensystem für Automobilzulieferer
    • Meye-83
    • [Meye-83] Meyer, B.E., Schefenacker, R.: Erfahrungen mit einem EDV-gestützten Fortschrittszahlensystem für Automobilzulieferer. ZWF 78, 170-172 (1983)
    • (1983) ZWF , vol.78 , pp. 170-172
    • Meyer, B.E.1    Schefenacker, R.2
  • 147
    • 0000879068 scopus 로고
    • Optimal policies for a multi-echelon inventory problem
    • Clar-60*
    • [Clar-60*] Clark, A.J., Scarf, H.: Optimal policies for a multi-echelon inventory problem. Manag. Sci. 6, 475-490 (1960)
    • (1960) Manag. Sci. , vol.6 , pp. 475-490
    • Clark, A.J.1    Scarf, H.2
  • 148
    • 0029375356 scopus 로고
    • Literature review of material flow control mechanisms
    • Grav-95*
    • [Grav-95*] Graves, R.J., Konopka, J.M., Milne, R.J.: Literature review of material flow control mechanisms. Prod. Plan. Control 6(5), 395-403 (1995)
    • (1995) Prod. Plan. Control , vol.6 , Issue.5 , pp. 395-403
    • Graves, R.J.1    Konopka, J.M.2    Milne, R.J.3
  • 149
    • 0001181033 scopus 로고
    • General principles of inventory control
    • Kimb-88*
    • [Kimb-88*] Kimball, J.E.: General principles of inventory control. Int. J. Manuf. Oper. Manag. 1(1), 119-130 (1988)
    • (1988) Int. J. Manuf. Oper. Manag. , vol.1 , Issue.1 , pp. 119-130
    • Kimball, J.E.1
  • 150
    • 84987012950 scopus 로고
    • A general approach for coordinating production in multiple-cell manufacturing systems
    • Buza-92*
    • [Buza-92*] Buzacott, J.A., Shantikumar, J.G.: A general approach for coordinating production in multiple-cell manufacturing systems. Prod. Oper. Manag. 1(1), 34-52 (1992)
    • (1992) Prod. Oper. Manag. , vol.1 , Issue.1 , pp. 34-52
    • Buzacott, J.A.1    Shantikumar, J.G.2
  • 151
    • 0031078124 scopus 로고    scopus 로고
    • Order review and release strategies in a job shop environment
    • Berg-97*
    • [Berg-97*] Bergamaschi, D., et al.: Order review and release strategies in a job shop environment. A review and a classification. Int. J. Prod. Res. 35(2), 399-420 (1997)
    • (1997) A review and a classification. Int. J. Prod. Res. , vol.35 , Issue.2 , pp. 399-420
    • Bergamaschi, D.1
  • 152
    • 0036819876 scopus 로고    scopus 로고
    • The workload control concept: Theory and practical extensions of load oriented order release
    • Brei-02b*
    • [Brei-02b*] Breithaupt, J.-W., Land, M., Nyhuis, P.: The workload control concept: theory and practical extensions of load oriented order release. Prod. Plan. Control 12(7), 625-638 (2002)
    • (2002) Prod. Plan. Control , vol.12 , Issue.7 , pp. 625-638
    • Breithaupt, J.-W.1    Land, M.2    Nyhuis, P.3
  • 153
    • 0023964289 scopus 로고
    • Closed-loop job release control for VLSI circuit manufacturing
    • Glas-88*
    • [Glas-88*] Glassey, C.R., Resende, M.G.C.: Closed-loop job release control for VLSI circuit manufacturing. IEEE Trans. Semicond. Manuf. 1(1), 36-46 (1988)
    • (1988) IEEE Trans. Semicond. Manuf. , vol.1 , Issue.1 , pp. 36-46
    • Glassey, C.R.1    Resende, M.G.C.2
  • 158
    • 0002274219 scopus 로고
    • Input/Output control. A real handle on lead time
    • Wigh-70*
    • [Wigh-70*] Wight, O.: Input/Output control. A real handle on lead time. Prod. Invent. Manag. 11, 9-31 (1970)
    • (1970) Prod. Invent. Manag. , vol.11 , pp. 9-31
    • Wight, O.1
  • 163
    • 0012245221 scopus 로고
    • The effect of input control in a simple scheduling model
    • Bake-84*
    • [Bake-84*] Baker, K.R.: The effect of input control in a simple scheduling model. J. Oper. Manag. 4(2), 99-112 (1984)
    • (1984) J. Oper. Manag. , vol.4 , Issue.2 , pp. 99-112
    • Baker, K.R.1
  • 164
    • 0036820210 scopus 로고    scopus 로고
    • The effectiveness of input control based on aggregate versus bottleneck work loads
    • Enns-02*
    • [Enns-02*] Enns, S.T., Costa, M.P.: The effectiveness of input control based on aggregate versus bottleneck work loads. Prod. Plan. Control 12(7), 614-624 (2002)
    • (2002) Prod. Plan. Control , vol.12 , Issue.7 , pp. 614-624
    • Enns, S.T.1    Costa, M.P.2
  • 165
    • 0036507644 scopus 로고    scopus 로고
    • A simulation study comparing performance of CONWIP and bottleneck-based release rules
    • Gill-02*
    • [Gill-02*] Gilland, W.G.: A simulation study comparing performance of CONWIP and bottleneck-based release rules. Prod. Plan. Control 13(2), 211-219 (2002)
    • (2002) Prod. Plan. Control , vol.13 , Issue.2 , pp. 211-219
    • Gilland, W.G.1
  • 166
    • 0029375356 scopus 로고
    • Literature review of material flow control mechanisms
    • Grav-95*
    • [Grav-95*] Graves, R.J., Konopka, J.M., Milne, R.J.: Literature review of material flow control mechanisms. Prod. Plan. Control 6(5), 395-403 (1995)
    • (1995) Prod. Plan. Control , vol.6 , Issue.5 , pp. 395-403
    • Graves, R.J.1    Konopka, J.M.2    Milne, R.J.3
  • 169
    • 85026720254 scopus 로고    scopus 로고
    • Dimensionierung und Bewertung von Fertigungsinseln mit logistischen Kennlinien
    • Lödd-01b
    • [Lödd-01b] Lödding, H., Hernández, R., Wiendahl, H.-P.: Dimensionierung und Bewertung von Fertigungsinseln mit logistischen Kennlinien. Io Manage. 70(1-2), 25-32 (2001)
    • (2001) Io Manage. , vol.70 , Issue.1-2 , pp. 25-32
    • Lödding, H.1    Hernández, R.2    Wiendahl, H.-P.3
  • 170
    • 0024700372 scopus 로고
    • Order review/release: Research issues and perspectives
    • Meln-89*
    • [Meln-89*] Melnyk, S.A., Ragatz, G.L.: Order review/release: research issues and perspectives. Int. J. Prod. Res. 27(7), 1081-1096 (1989)
    • (1989) Int. J. Prod. Res. , vol.27 , Issue.7 , pp. 1081-1096
    • Melnyk, S.A.1    Ragatz, G.L.2
  • 171
    • 0000809619 scopus 로고
    • Load smoothing by the planning and order review/release systems
    • Meln-91*
    • [Meln-91*] Melnyk, S., Ragatz, G., Fredendall, L.: Load smoothing by the planning and order review/release systems. A simulation experiment. J. Oper. Manag. 10(4), 512-523 (1991)
    • (1991) A simulation experiment. J. Oper. Manag. , vol.10 , Issue.4 , pp. 512-523
    • Melnyk, S.1    Ragatz, G.2    Fredendall, L.3
  • 173
    • 84985757538 scopus 로고
    • An evaluation of order release mechanisms in a jobshop environment
    • Raga-88*
    • [Raga-88*] Ragatz, G.L., Mabert, V.A.: An evaluation of order release mechanisms in a jobshop environment. Decis. Sci. 19, 167-189 (1988)
    • (1988) Decis. Sci. , vol.19 , pp. 167-189
    • Ragatz, G.L.1    Mabert, V.A.2
  • 174
    • 0026836253 scopus 로고
    • A comparison of order release strategies in production control systems
    • Rode-92*
    • [Rode-92*] Roderick, L.M., Phillips, D.T., Hogg, G.L.: A comparison of order release strategies in production control systems. Int. J. Prod. Res. 30(3), 611-626 (1992)
    • (1992) Int. J. Prod. Res. , vol.30 , Issue.3 , pp. 611-626
    • Roderick, L.M.1    Phillips, D.T.2    Hogg, G.L.3
  • 175
    • 85026708354 scopus 로고    scopus 로고
    • Manufacturing System Operating Curves
    • Schn-09*, Nyhuis, P., Wiendahl, H.-P., Springer, Berlin
    • [Schn-09*] Schneider, M.: Manufacturing System Operating Curves. In: Nyhuis, P., Wiendahl, H.-P.: Fundamentals of Production Logistics, Springer, Berlin, 2002, pp. 112-117
    • (2002) Fundamentals of Production Logistics , pp. 112-117
    • Schneider, M.1
  • 177
    • 0000170779 scopus 로고
    • A hierarchical control architecture for constant work-in-process (CONWIP) production systems
    • Spea-89*
    • [Spea-89*] Spearman, M.L., Hopp, W.J., Woodruff, D.L.: A hierarchical control architecture for constant work-in-process (CONWIP) production systems. J. Mfg. Oper. Mgt 2 (3), 147-171 (1989)
    • (1989) J. Mfg. Oper. Mgt , vol.2 , Issue.3 , pp. 147-171
    • Spearman, M.L.1    Hopp, W.J.2    Woodruff, D.L.3
  • 178
    • 0025430443 scopus 로고
    • CONWIP: A pull alternative to kanban
    • Spea-90*
    • [Spea-90*] Spearman, M.L., Woodruff, D.L., Hopp, W.J.: CONWIP: a pull alternative to kanban. Int. J. Prod. Res. 28(5), 879-894 (1990)
    • (1990) Int. J. Prod. Res. , vol.28 , Issue.5 , pp. 879-894
    • Spearman, M.L.1    Woodruff, D.L.2    Hopp, W.J.3
  • 179
    • 0026859945 scopus 로고
    • Push and pull productions systems: Issues and comparisons
    • Spea-92*
    • [Spea-92*] Spearman, M.L., Zazanis, M.A.: Push and pull productions systems: issues and comparisons. Oper. Res. 40(3), 521-532 (1992)
    • (1992) Oper. Res. , vol.40 , Issue.3 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2
  • 180
    • 0024055865 scopus 로고
    • Scheduling semiconductor wafer fabrication
    • Wein-88*
    • [Wein-88*] Wein, L.M.: Scheduling semiconductor wafer fabrication. IEEE Trans. Semicond. Manuf. 1(3), 115-130 (1988)
    • (1988) IEEE Trans. Semicond. Manuf. , vol.1 , Issue.3 , pp. 115-130
    • Wein, L.M.1
  • 181
    • 0028410211 scopus 로고
    • Generic Kanban systems for dynamic environments
    • Chan-94*
    • [Chan-94*] Chang, T.M., Yih, Y.: Generic Kanban systems for dynamic environments. Int. J. Prod. Res. 32(4), 889-902 (1994)
    • (1994) Int. J. Prod. Res. , vol.32 , Issue.4 , pp. 889-902
    • Chang, T.M.1    Yih, Y.2
  • 182
    • 85026684712 scopus 로고    scopus 로고
    • Capacity Bottlenecks: Illusions and false gods
    • Crab-02*
    • [Crab-02*] Crabtree, D.: Capacity Bottlenecks: illusions and false gods. Control Mag. 28(6), 24-26 (2002)
    • (2002) Control Mag. , vol.28 , Issue.6 , pp. 24-26
    • Crabtree, D.1
  • 183
    • 0036820210 scopus 로고    scopus 로고
    • The effectiveness of input control based on aggregate versus bottleneck work loads
    • Enns-02*
    • [Enns-02*] Enns, S.T., Costa, M.P.: The effectiveness of input control based on aggregate versus bottleneck work loads. Prod. Plan. Control 12(7), 614-624 (2002)
    • (2002) Prod. Plan. Control , vol.12 , Issue.7 , pp. 614-624
    • Enns, S.T.1    Costa, M.P.2
  • 185
    • 0023964289 scopus 로고
    • Closed-loop job release control for VLSI circuit manufacturing
    • Glas-88*
    • [Glas-88*] Glassey, C.R., Resende, M.G.C.: Closed-loop job release control for VLSI circuit manufacturing. IEEE Trans. Semicond. Manuf. 1(1), 36-46 (1988)
    • (1988) IEEE Trans. Semicond. Manuf. , vol.1 , Issue.1 , pp. 36-46
    • Glassey, C.R.1    Resende, M.G.C.2
  • 186
    • 0036507644 scopus 로고    scopus 로고
    • A simulation study comparing performance of CONWIP and bottleneck-based release rules
    • Gill-02*
    • [Gill-02*] Gilland, W.G.: A simulation study comparing performance of CONWIP and bottleneck-based release rules. Prod. Plan. Control 13(2), 211-219 (2002)
    • (2002) Prod. Plan. Control , vol.13 , Issue.2 , pp. 211-219
    • Gilland, W.G.1
  • 187
    • 0000955366 scopus 로고
    • An order release mechanism for a flexible flow system
    • Ling-95*
    • [Ling-95*] Lingayat, S., Mittenthal, J., O’Keefe, R.M.: An order release mechanism for a flexible flow system. Int. J. Prod. Res. 33(5), 1241-1256 (1995)
    • (1995) Int. J. Prod. Res. , vol.33 , Issue.5 , pp. 1241-1256
    • Lingayat, S.1    Mittenthal, J.2    O’Keefe, R.M.3
  • 189
    • 0026836253 scopus 로고
    • A comparison of order release strategies in production control systems
    • Rode-92*
    • [Rode-92*] Roderick, L.M., Phillips, D.T., Hogg, G.L.: A comparison of order release strategies in production control systems. Int. J. Prod. Res. 30(3), 611-626 (1992)
    • (1992) Int. J. Prod. Res. , vol.30 , Issue.3 , pp. 611-626
    • Roderick, L.M.1    Phillips, D.T.2    Hogg, G.L.3
  • 190
    • 0025699540 scopus 로고
    • Drum-Buffer-Rope shop floor control
    • Schr-90*
    • [Schr-90*] Schragenheim, E., Ronen, B.: Drum-Buffer-Rope shop floor control. Prod. Invent. Manag. J. 31(3), 18-22 (1990)
    • (1990) Prod. Invent. Manag. J. , vol.31 , Issue.3 , pp. 18-22
    • Schragenheim, E.1    Ronen, B.2
  • 191
    • 0029260367 scopus 로고
    • Master Production Scheduling Development in a theory of constraints environment
    • Spen-95*
    • [Spen-95*] Spencer, M.S., Cox, J.F.: Master Production Scheduling Development in a theory of constraints environment. Prod. Invent. Manag. J. 36(1), 80-14 (1995)
    • (1995) Prod. Invent. Manag. J. , vol.36 , Issue.1 , pp. 80-114
    • Spencer, M.S.1    Cox, J.F.2
  • 192
    • 0024055865 scopus 로고
    • Scheduling semiconductor wafer fabrication
    • Wein-88*
    • [Wein-88*] Wein, L.M.: Scheduling semiconductor wafer fabrication. IEEE Trans. Semicond. Manuf. 1(3), 115-130 (1988)
    • (1988) IEEE Trans. Semicond. Manuf. , vol.1 , Issue.3 , pp. 115-130
    • Wein, L.M.1
  • 194
    • 0004085136 scopus 로고
    • Production Control and Information Systems for Component-Manufacturing Shops
    • Bert-81*, Elsevier, Amsterdam
    • [Bert-81*] Bertrand, J.W.M., Wortmann, J.C.: Production Control and Information Systems for Component-Manufacturing Shops. Studies in Production and Engineering Economics, vol. 1. Elsevier, Amsterdam (1981)
    • (1981) Studies in Production and Engineering Economics , vol.1
    • Bertrand, J.W.M.1    Wortmann, J.C.2
  • 195
    • 0028410211 scopus 로고
    • Generic Kanban systems for dynamic environments
    • Chan-94*
    • [Chan-94*] Chang, T.M., Yih, Y.: Generic Kanban systems for dynamic environments. Int. J. Prod. Res. 32(4), 889-902 (1994)
    • (1994) Int. J. Prod. Res. , vol.32 , Issue.4 , pp. 889-902
    • Chang, T.M.1    Yih, Y.2
  • 196
    • 0036819537 scopus 로고    scopus 로고
    • An experimental investigation on workload limiting methods with ORR policies in a job shop environment
    • Cigo-02*
    • [Cigo-02*] Cigolini, R., Portioli-Staudacher, A.: An experimental investigation on workload limiting methods with ORR policies in a job shop environment. Prod. Plan. Control 12(7), 602-612 (2002)
    • (2002) Prod. Plan. Control , vol.12 , Issue.7 , pp. 602-612
    • Cigolini, R.1    Portioli-Staudacher, A.2
  • 197
    • 0026239339 scopus 로고
    • Job release: Part of a hierarchical system to manage manufacturing lead times in make-to-order companies
    • Hend-91*
    • [Hend-91*] Hendry, L.C., Kingsman, B.G.: Job release: part of a hierarchical system to manage manufacturing lead times in make-to-order companies. J. Op. Res. Soc. 42(10), 871-883 (1991)
    • (1991) J. Op. Res. Soc. , vol.42 , Issue.10 , pp. 871-883
    • Hendry, L.C.1    Kingsman, B.G.2
  • 199
    • 0024664777 scopus 로고
    • A structural methodology for managing manufacturing lead times in make-to-order companies
    • King-89*
    • [King-89*] Kingsman, B.G., Tatsiopoulos, I.P., Hendry, L.C.: A structural methodology for managing manufacturing lead times in make-to-order companies. Eur. J. Oper. Res. 40, 196-209 (1989)
    • (1989) Eur. J. Oper. Res. , vol.40 , pp. 196-209
    • Kingsman, B.G.1    Tatsiopoulos, I.P.2    Hendry, L.C.3
  • 200
    • 0036819875 scopus 로고    scopus 로고
    • The relative contributions of input and output control on the performance of a workload control system in make-to-order companies
    • King-02*
    • [King-02*] Kingsman, B., Hendry, L.: The relative contributions of input and output control on the performance of a workload control system in make-to-order companies. Prod. Plan. Control 12(7), 579-590 (2002)
    • (2002) Prod. Plan. Control , vol.12 , Issue.7 , pp. 579-590
    • Kingsman, B.1    Hendry, L.2
  • 201
    • 0030401650 scopus 로고    scopus 로고
    • Workload control concepts in job shops. A critical assessment
    • Land-96*
    • [Land-96*] Land, M., Gaalman, G.: Workload control concepts in job shops. A critical assessment. Int. J. Prod. Res. 46-47, 535-548 (1996)
    • (1996) Int. J. Prod. Res. , vol.46-47 , pp. 535-548
    • Land, M.1    Gaalman, G.2
  • 203
    • 0002154577 scopus 로고
    • Simplified production management software for the small manufacturing firm
    • Tats-93*
    • [Tats-93*] Tatsiopoulos, I.P.: Simplified production management software for the small manufacturing firm. Prod. Plan. Control 4(1), 17-26 (1993)
    • (1993) Prod. Plan. Control , vol.4 , Issue.1 , pp. 17-26
    • Tatsiopoulos, I.P.1
  • 206
    • 0023979312 scopus 로고
    • Theory and practice of load-oriented manufacturing control
    • Bech-88*
    • [Bech-88*] Bechte, W.: Theory and practice of load-oriented manufacturing control. Int. J. Prod. Res. 26(3), 375-395 (1988)
    • (1988) Int. J. Prod. Res. , vol.26 , Issue.3 , pp. 375-395
    • Bechte, W.1
  • 207
    • 0004085136 scopus 로고
    • Production Control and Information Systems for Component-Manufacturing Shops
    • Bert-81*, Elsevier, Amsterdam
    • [Bert-81*] Bertrand, J.W.M., Wortmann, J.C.: Production Control and Information Systems for Component-Manufacturing Shops. Studies in Production and Engineering Economics, vol. 1. Elsevier, Amsterdam (1981)
    • (1981) Studies in Production and Engineering Economics , vol.1
    • Bertrand, J.W.M.1    Wortmann, J.C.2
  • 208
    • 0036819876 scopus 로고    scopus 로고
    • The workload control concept: Theory and practical extensions of load oriented order release
    • Brei-02b*
    • [Brei-02b*] Breithaupt, J.-W., Land, M., Nyhuis, P.: The workload control concept: theory and practical extensions of load oriented order release. Prod. Plan. Control 12(7), 625-638 (2002)
    • (2002) Prod. Plan. Control , vol.12 , Issue.7 , pp. 625-638
    • Breithaupt, J.-W.1    Land, M.2    Nyhuis, P.3
  • 209
    • 0036819537 scopus 로고    scopus 로고
    • An experimental investigation on workload limiting methods with ORR policies in a job shop environment
    • Cigo-02*
    • [Cigo-02*] Cigolini, R., Portioli-Staudacher, A.: An experimental investigation on workload limiting methods with ORR policies in a job shop environment. Prod. Plan. Control 12(7), 602-612 (2002)
    • (2002) Prod. Plan. Control , vol.12 , Issue.7 , pp. 602-612
    • Cigolini, R.1    Portioli-Staudacher, A.2
  • 210
    • 85026706422 scopus 로고
    • Erfahrungen mit dem System KPSF zur Belastungsorieniterten Fertigungssteuerung in einem Maschinenbaubetrieb mittlerer Größe
    • Holz-91, Wiendahl, H.-P. (ed.), Carl Hanser Verlag, Munich/Vienna
    • [Holz-91] Holzhüter, E., Friedrichs, E.: Erfahrungen mit dem System KPSF zur Belastungsorieniterten Fertigungssteuerung in einem Maschinenbaubetrieb mittlerer Größe. In: Wiendahl, H.-P. (ed.) Anwendung der Belastungsorientierten Fertigungssteuerung, pp. 139-152. Carl Hanser Verlag, Munich/Vienna (1991)
    • (1991) Anwendung der Belastungsorientierten Fertigungssteuerung , pp. 139-152
    • Holzhüter, E.1    Friedrichs, E.2
  • 211
    • 85026696893 scopus 로고
    • Belastungsorientierte Auftragsfreigabe der Hilti AG
    • Knec-91, Wiendahl, H.-P. (ed.), Carl Hanser Verlag, Munich/Vienna
    • [Knec-91] Knecht, R.: Belastungsorientierte Auftragsfreigabe der Hilti AG. In: Wiendahl, H.-P. (ed.) Anwendung der Belastungsorientierten Fertigungssteuerung, pp. 179-193. Carl Hanser Verlag, Munich/Vienna (1991)
    • (1991) Anwendung der Belastungsorientierten Fertigungssteuerung , pp. 179-193
    • Knecht, R.1
  • 212
    • 0012239656 scopus 로고
    • A widely acclaimed method of load-oriented job release and its conceptual deficiencies
    • Knol-91*, Fandel, G., Zäpfel, G. (eds.), Springer, Berlin
    • [Knol-91*] Knolmayer, G.: A widely acclaimed method of load-oriented job release and its conceptual deficiencies. In: Fandel, G., Zäpfel, G. (eds.) Modern Production Concepts, pp. 219-236. Springer, Berlin (1991)
    • (1991) Modern Production Concepts , pp. 219-236
    • Knolmayer, G.1
  • 213
    • 0030401650 scopus 로고    scopus 로고
    • Workload control concepts in job shops. A critical assessment
    • Land-96*
    • [Land-96*] Land, M., Gaalman, G.: Workload control concepts in job shops. A critical assessment. Int. J. Prod. Res. 46-47, 535-548 (1996)
    • (1996) Int. J. Prod. Res. , vol.46-47 , pp. 535-548
    • Land, M.1    Gaalman, G.2
  • 215
    • 0029732560 scopus 로고    scopus 로고
    • An enhanced loading model for the probabilistic workload control under workload imbalance
    • Pero-96*
    • [Pero-96*] Perona, M., Portioli, A.: An enhanced loading model for the probabilistic workload control under workload imbalance. Prod. Plan. Control 7(8), 68-78 (1996)
    • (1996) Prod. Plan. Control , vol.7 , Issue.8 , pp. 68-78
    • Perona, M.1    Portioli, A.2
  • 216
    • 85026684277 scopus 로고
    • Erfahrungen bei der Implementierung der Belastungsorientierten Auftragsfreigabe
    • Sohn-91, Wiendahl, H.-P. (ed.), Carl Hanser Verlag, Munich/Vienna
    • [Sohn-91] Sohn, H.: Erfahrungen bei der Implementierung der Belastungsorientierten Auftragsfreigabe. In: Wiendahl, H.-P. (ed.) Anwendung der Belastungsorientierten Fertigungssteuerung, pp. 267-274. Carl Hanser Verlag, Munich/Vienna (1991)
    • (1991) Anwendung der Belastungsorientierten Fertigungssteuerung , pp. 267-274
    • Sohn, H.1
  • 217
    • 85026708698 scopus 로고
    • Die Belastungsorientierte Fertigungssteuerung für mechanische Fertigungen in der BMW AG
    • Stor-91, Wiendahl, H.P. (ed.), Carl Hanser Verlag, Munich/Vienna
    • [Stor-91] Storfinger, R.: Die Belastungsorientierte Fertigungssteuerung für mechanische Fertigungen in der BMW AG. In: Wiendahl, H.P. (ed.) Anwendung der Belastungsorientierten Auftragsfreigabe. Carl Hanser Verlag, Munich/Vienna (1991)
    • (1991) Anwendung der Belastungsorientierten Auftragsfreigabe
    • Storfinger, R.1
  • 221
    • 0016319331 scopus 로고
    • A loading and balancing methodology for job-shop control
    • Iras-74*
    • [Iras-74*] Irastorza, J., Deane, R.: A loading and balancing methodology for job-shop control. AIIE T. 6, 302-307 (1974)
    • (1974) AIIE T. , vol.6 , pp. 302-307
    • Irastorza, J.1    Deane, R.2
  • 224
    • 85026720254 scopus 로고    scopus 로고
    • Dimensionierung und Bewertung von Fertigungsinseln mit logistischen Kennlinien
    • Lödd-01b
    • [Lödd-01b] Lödding, H., Hernández, R., Wiendahl, H.-P.: Dimensionierung und Bewertung von Fertigungsinseln mit logistischen Kennlinien. Io Manage. 70(1-2), 25-32 (2001)
    • (2001) Io Manage. , vol.70 , Issue.1-2 , pp. 25-32
    • Lödding, H.1    Hernández, R.2    Wiendahl, H.-P.3
  • 225
    • 0038619619 scopus 로고    scopus 로고
    • The performance of a new material control and replenishment system: A simulation and comparative study
    • Luh-00*, 7-9 June
    • [Luh-00*] Luh, P. B., Zhou, X., Tomastik, R.N.: The performance of a new material control and replenishment system: a simulation and comparative study. In: Proceedings of Quick Response Manufacturing 2000, pp. 805-826. 7-9 June 2000
    • (2000) Proceedings of Quick Response Manufacturing 2000 , pp. 805-826
    • Luh, P.B.1    Zhou, X.2    Tomastik, R.N.3
  • 226
    • 61349198385 scopus 로고    scopus 로고
    • How to plan and implement POLCA: A material control system for high-variety or custom-engineered products
    • Suri-03*, University of Wisconsin-Madison
    • [Suri-03*] Suri, R., Krishnamurthy, A.: How to plan and implement POLCA: a material control system for high-variety or custom-engineered products. Technical Report. Center for Quick Response Manufacturing, University of Wisconsin-Madison, pp. 1-17. (2003)
    • (2003) Technical Report. Center for Quick Response Manufacturing , pp. 1-17
    • Suri, R.1    Krishnamurthy, A.2
  • 227
    • 0003749677 scopus 로고    scopus 로고
    • Quick Response Manufacturing
    • Suri-98*, Productivity Press, Portland
    • [Suri-98*] Suri, R.: Quick Response Manufacturing. A Companywide Approach to Reducing Lead Times. Productivity Press, Portland (1998)
    • (1998) A Companywide Approach to Reducing Lead Times
    • Suri, R.1
  • 229
    • 84896759212 scopus 로고
    • Bestandsgeregelte Durchfluß-Steuerung (BGD)
    • Busc-87
    • [Busc-87] Busch, U.: Bestandsgeregelte Durchfluß-Steuerung (BGD). CIM Management 1, 18-23 (1987)
    • (1987) CIM Management , vol.1 , pp. 18-23
    • Busch, U.1
  • 238
    • 0034423981 scopus 로고    scopus 로고
    • Manufacturing operations and strategic flexibility survey and cases
    • Beac-00*
    • [Beac-00*] Beach, R., et al.: Manufacturing operations and strategic flexibility survey and cases. Int. J. Oper. Prod. Man. 20(1), 7-30 (2000)
    • (2000) Int. J. Oper. Prod. Man. , vol.20 , Issue.1 , pp. 7-30
    • Beach, R.1
  • 241
    • 0032094829 scopus 로고
    • Manufacturing flexibility: A literature review
    • deTo-90*
    • [deTo-90*] de Toni, A., Tonchia, S.: Manufacturing flexibility: a literature review. Int. J. Prod. Res. 36(6), 1587-1617 (1990)
    • (1990) Int. J. Prod. Res. , vol.36 , Issue.6 , pp. 1587-1617
    • de Toni, A.1    Tonchia, S.2
  • 243
    • 34248539177 scopus 로고
    • Flexibility in manufacturing: A survey
    • Seth-90*
    • [Seth-90*] Sethi, A.K., Sethi, S.P.: Flexibility in manufacturing: a survey. Int. J. Flex. Manuf. Syst. 2(4), 289-328 (1990)
    • (1990) Int. J. Flex. Manuf. Syst. , vol.2 , Issue.4 , pp. 289-328
    • Sethi, A.K.1    Sethi, S.P.2
  • 244
    • 0003749677 scopus 로고    scopus 로고
    • Quick Response Manufacturing
    • Suri-98*, Productivity Press, Portland
    • [Suri-98*] Suri, R.: Quick Response Manufacturing. A Companywide Approach to Reducing Lead Times. Productivity Press, Portland (1998)
    • (1998) A Companywide Approach to Reducing Lead Times
    • Suri, R.1
  • 246
    • 0004663130 scopus 로고    scopus 로고
    • Rückstandsorientierte Produktionsregelung von Fertigungsbereichen
    • Brei-01, VDI Progress Reports, Series 2, Düsseldorf
    • [Brei-01] Breithaupt, J.-W.: Rückstandsorientierte Produktionsregelung von Fertigungsbereichen. Grundlagen und Anwendung. VDI Progress Reports, Series 2, No. 571, Düsseldorf (2001)
    • (2001) Grundlagen und Anwendung , Issue.571
    • Breithaupt, J.-W.1
  • 247
    • 85026685005 scopus 로고    scopus 로고
    • Maximierung der Termintreue durch Produktionsregelung
    • Brei-02
    • [Brei-02] Breithaupt, J.-W., Panten, M.: Maximierung der Termintreue durch Produktionsregelung. Ind. Manage. 18(2), 25-28 (2002)
    • (2002) Ind. Manage. , vol.18 , Issue.2 , pp. 25-28
    • Breithaupt, J.-W.1    Panten, M.2
  • 248
    • 85026714485 scopus 로고    scopus 로고
    • Pete-96, VDI Progress Reports, Series 20, Düsseldorf
    • [Pete-96] Petermann, D.: Modellbasierte Produktionsregelung. VDI Progress Reports, Series 20, No. 193, Düsseldorf (1996)
    • (1996) Modellbasierte Produktionsregelung , Issue.193
    • Petermann, D.1
  • 253
    • 0031095866 scopus 로고    scopus 로고
    • A comparison of production-line control mechanisms
    • Bonv-97*
    • [Bonv-97*] Bonvik, A.M., Couch, C.E., Gershwin, B.S.: A comparison of production-line control mechanisms. Int. J. Prod. Res. 35(3), 789-804 (1997)
    • (1997) Int. J. Prod. Res. , vol.35 , Issue.3 , pp. 789-804
    • Bonvik, A.M.1    Couch, C.E.2    Gershwin, B.S.3
  • 254
    • 29644438335 scopus 로고    scopus 로고
    • Stand und Potenzial produktionsnaher Datenverarbeitung
    • Beck-02
    • [Beck-02] Beckert, B., Hudetz, W.: Stand und Potenzial produktionsnaher Datenverarbeitung. PPS-Management 7(2), 35-39 (2002)
    • (2002) PPS-Management , vol.7 , Issue.2 , pp. 35-39
    • Beckert, B.1    Hudetz, W.2
  • 255
    • 0028410211 scopus 로고
    • Generic Kanban systems for dynamic environments
    • Chan-94*
    • [Chan-94*] Chang, T.M., Yih, Y.: Generic Kanban systems for dynamic environments. Int. J. Prod. Res. 32(4), 889-902 (1994)
    • (1994) Int. J. Prod. Res. , vol.32 , Issue.4 , pp. 889-902
    • Chang, T.M.1    Yih, Y.2
  • 256
    • 85026715715 scopus 로고    scopus 로고
    • Ausprägungen der Produktionsplanung und -steuerung
    • Ever-99, Eversheim, W., Schuh, G. (eds.), Springer, Berlin
    • [Ever-99] Eversheim, W. et al.: Ausprägungen der Produktionsplanung und -steuerung. In: Eversheim, W., Schuh, G. (eds.): Produktion und Management, vol. 4, pp. 14-60-14-83. Springer, Berlin (1999)
    • (1999) Produktion und Management , vol.4 , pp. 14-60-14-83
    • Eversheim, W.1
  • 261
    • 85026715802 scopus 로고    scopus 로고
    • Die klassischen Stolpersteine der PPS und der Lösungsansatz 3-Sigma-PPS
    • Wien-03b, Baumgarten, H., Wiendahl, H.-P., Zentes, J. (eds.), Strategien, Konzepte, Praxisbeispiele, Beitrag 7/03/01/02
    • [Wien-03b] Wiendahl, H.-P., Begemann, C., Nickel, R.: Die klassischen Stolpersteine der PPS und der Lösungsansatz 3-Sigma-PPS. In: Baumgarten, H., Wiendahl, H.-P., Zentes, J. (eds.) Springer Experten System Logistik-Management. Strategien, Konzepte, Praxisbeispiele, vol. 2, part 7, Beitrag 7/03/01/02, pp. 1-28
    • Springer Experten System Logistik-Management , vol.2 , pp. 1-28
    • Wiendahl, H.-P.1    Begemann, C.2    Nickel, R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.