메뉴 건너뛰기




Volumn 24, Issue 4, 2017, Pages 668-695

BIM-enabled sustainability assessment of material supply decisions

Author keywords

BIM; Curtain wall; Life cycle assessment; Project constraints; Supply chain management; Topsis

Indexed keywords

ARCHITECTURAL DESIGN; BUILDING MATERIALS; COMMERCE; CONSTRUCTION; ECODESIGN; ECONOMIC AND SOCIAL EFFECTS; ENVIRONMENTAL IMPACT; LIFE CYCLE; SUPPLY CHAIN MANAGEMENT; SUSTAINABLE DEVELOPMENT;

EID: 85024118559     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/ECAM-12-2015-0193     Document Type: Article
Times cited : (65)

References (65)
  • 2
    • 84869188734 scopus 로고    scopus 로고
    • Development of sustainable assessment criteria for building materials selection
    • Akadiri, P.O. and Olomolaiye, P.O. (2012), "Development of sustainable assessment criteria for building materials selection", Engineering, Construction and Architectural Management, Vol. 19 No. 6, pp. 666-687.
    • (2012) Engineering, Construction and Architectural Management , vol.19 , Issue.6 , pp. 666-687
    • Akadiri, P.O.1    Olomolaiye, P.O.2
  • 3
    • 84870810378 scopus 로고    scopus 로고
    • Multi-criteria evaluation model for the selection of sustainable materials for building projects
    • Akadiri, P.O., Olomolaiye, P.O. and Chinyio, E.A. (2013), "Multi-criteria evaluation model for the selection of sustainable materials for building projects", Automation in Construction, Vol. 30, pp. 113-125, doi: 10.1016/j.autcon.2012.10.004.
    • (2013) Automation in Construction , vol.30 , pp. 113-125
    • Akadiri, P.O.1    Olomolaiye, P.O.2    Chinyio, E.A.3
  • 4
    • 84887838095 scopus 로고    scopus 로고
    • Economic and environmental assessment of deconstruction strategies using building information modeling
    • Akbarnezhad, A., Ong, K.C.G. and Chandra, L.R. (2014), "Economic and environmental assessment of deconstruction strategies using building information modeling", Automation in Construction, Vol. 37, pp. 131-144, doi: 10.1016/j.autcon.2013.10.017.
    • (2014) Automation in Construction , vol.37 , pp. 131-144
    • Akbarnezhad, A.1    Ong, K.C.G.2    Chandra, L.R.3
  • 6
    • 64549107546 scopus 로고    scopus 로고
    • Assessing the recycling potential of glass fibre reinforced plastic waste in concrete and cement composites
    • Asokan, P., Osmani, M. and Price, A.D.F. (2009), "Assessing the recycling potential of glass fibre reinforced plastic waste in concrete and cement composites", Journal of Cleaner Production, Vol. 17 No. 9, pp. 821-829.
    • (2009) Journal of Cleaner Production , vol.17 , Issue.9 , pp. 821-829
    • Asokan, P.1    Osmani, M.2    Price, A.D.F.3
  • 8
    • 0038250770 scopus 로고    scopus 로고
    • Strategies for enhancing agility of make-to-order manufacturing systems
    • Babu, A.S. (1999), "Strategies for enhancing agility of make-to-order manufacturing systems", International Journal of Agile Management Systems, Vol. 1 No. 1, pp. 23-29.
    • (1999) International Journal of Agile Management Systems , vol.1 , Issue.1 , pp. 23-29
    • Babu, A.S.1
  • 9
    • 80052094480 scopus 로고    scopus 로고
    • Decision-making tools for evaluating the impact of materials selection on the carbon footprint of buildings
    • Bank, L.C., Thompson, B.P. and Mccarthy, M. (2011), "Decision-making tools for evaluating the impact of materials selection on the carbon footprint of buildings", Carbon Management, Vol. 2 No. 4, pp. 431-441.
    • (2011) Carbon Management , vol.2 , Issue.4 , pp. 431-441
    • Bank, L.C.1    Thompson, B.P.2    Mccarthy, M.3
  • 10
    • 84931432049 scopus 로고    scopus 로고
    • BM in the operations stage: Bottlenecks and implications for owners
    • Bosch, A., Volker, L. and Koutamanis, A. (2015), "BM in the operations stage: bottlenecks and implications for owners", Buit Environment Project and Asset Management, Vol. 5 No. 3, pp. 331-343.
    • (2015) Buit Environment Project and Asset Management , vol.5 , Issue.3 , pp. 331-343
    • Bosch, A.1    Volker, L.2    Koutamanis, A.3
  • 11
    • 32944455684 scopus 로고    scopus 로고
    • Survey of sustainable building design practices in North America, Europe and Asia
    • Bunz, K.R., Henze, G.P. and Tiller, D.K. (2006), "Survey of sustainable building design practices in North America, Europe and Asia", Architectural Engineering, Vol. 12 No. 1, pp. 33-62.
    • (2006) Architectural Engineering , vol.12 , Issue.1 , pp. 33-62
    • Bunz, K.R.1    Henze, G.P.2    Tiller, D.K.3
  • 13
    • 76549129795 scopus 로고    scopus 로고
    • Sustainable performance criteria for construction method selection in concrete buildings
    • Chen, Y., Okudan, G.E. and Riley, D.R. (2010), "Sustainable performance criteria for construction method selection in concrete buildings", Automation in Construction, Vol. 19 No. 2, pp. 235-244.
    • (2010) Automation in Construction , vol.19 , Issue.2 , pp. 235-244
    • Chen, Y.1    Okudan, G.E.2    Riley, D.R.3
  • 14
    • 0033634601 scopus 로고    scopus 로고
    • The agile supply chain - Competing in volatile markets
    • Christopher, M. (2000), "The agile supply chain - competing in volatile markets", Industrial Marketing Management, Vol. 29 No. 1, pp. 37-44.
    • (2000) Industrial Marketing Management , vol.29 , Issue.1 , pp. 37-44
    • Christopher, M.1
  • 15
    • 35348838940 scopus 로고    scopus 로고
    • Document No. EPA/600/R-06/060, US Environmental Protection Agency, Washington, DC
    • Curran, M.A. (2006), "Life cycle assessment: principles and practice", Document No. EPA/600/R-06/060, US Environmental Protection Agency, Washington, DC.
    • (2006) Life Cycle Assessment: Principles and Practice
    • Curran, M.A.1
  • 17
    • 0032804033 scopus 로고    scopus 로고
    • Comparing contributors to time and cost performance in building projects
    • Dissanayaka, S.M. and Kumaraswamy, M.M. (1999), "Comparing contributors to time and cost performance in building projects", Building and Environment, Vol. 34 No. 1, pp. 31-42.
    • (1999) Building and Environment , vol.34 , Issue.1 , pp. 31-42
    • Dissanayaka, S.M.1    Kumaraswamy, M.M.2
  • 20
    • 84960808160 scopus 로고    scopus 로고
    • Optimal building envelope design based on simulated performance: History, current status and new potentials
    • Huang, Y. and Niu, J.L. (2016), "Optimal building envelope design based on simulated performance: history, current status and new potentials", Energy and Buildings, Vol. 117, pp. 387-398, doi: 10.1016/j.enbuild.2015.09.025.
    • (2016) Energy and Buildings , vol.117 , pp. 387-398
    • Huang, Y.1    Niu, J.L.2
  • 22
    • 84872313658 scopus 로고    scopus 로고
    • Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
    • Irizarry, J., Karan, E.P. and Jalaei, F. (2013), "Integrating BIM and GIS to improve the visual monitoring of construction supply chain management", Automation in Construction, Vol. 31, pp. 241-254, doi: 10.1016/j.autcon.2012.12.005.
    • (2013) Automation in Construction , vol.31 , pp. 241-254
    • Irizarry, J.1    Karan, E.P.2    Jalaei, F.3
  • 24
    • 11344287501 scopus 로고    scopus 로고
    • Sustainable building solutions: A review of lessons from the natural world
    • John, G., Clements-Croome, D. and Jeronimidis, G. (2005), "Sustainable building solutions: a review of lessons from the natural world", Building and Environment, Vol. 40 No. 3, pp. 319-328.
    • (2005) Building and Environment , vol.40 , Issue.3 , pp. 319-328
    • John, G.1    Clements-Croome, D.2    Jeronimidis, G.3
  • 30
    • 0034744971 scopus 로고    scopus 로고
    • Developing a decision support system for building project procurement
    • Kumaraswamy, M.M. and Dissanayaka, S.M. (2001), "Developing a decision support system for building project procurement", Building and Environment, Vol. 36 No. 3, pp. 337-349.
    • (2001) Building and Environment , vol.36 , Issue.3 , pp. 337-349
    • Kumaraswamy, M.M.1    Dissanayaka, S.M.2
  • 31
    • 0030103901 scopus 로고    scopus 로고
    • A computerised construction project management evaluation system
    • Kumaraswamy, M.M. and Thorpe, A. (1996), "A computerised construction project management evaluation system", Advances in Engineering Software, Vol. 25 Nos 2/3, pp. 197-206.
    • (1996) Advances in Engineering Software , vol.25 , Issue.2-3 , pp. 197-206
    • Kumaraswamy, M.M.1    Thorpe, A.2
  • 33
    • 43849111873 scopus 로고    scopus 로고
    • A simulation model for studying the implementation of performance-based fire safety design in buildings
    • Lo, S.M., Zhao, C.M., Liu, M. and Coping, A. (2008), "A simulation model for studying the implementation of performance-based fire safety design in buildings", Automation in Construction, Vol. 17 No. 7, pp. 852-863.
    • (2008) Automation in Construction , vol.17 , Issue.7 , pp. 852-863
    • Lo, S.M.1    Zhao, C.M.2    Liu, M.3    Coping, A.4
  • 34
    • 84949255987 scopus 로고    scopus 로고
    • A generalized TOPSIS method for group decision making with heterogeneous information in a dynamic environment
    • Lourenzutti, R. and Krohling, R.A. (2016), "A generalized TOPSIS method for group decision making with heterogeneous information in a dynamic environment", Information Sciences, Vol. 330, pp. 1-18, doi: 10.1016/j.ins.2015.10.005.
    • (2016) Information Sciences , vol.330 , pp. 1-18
    • Lourenzutti, R.1    Krohling, R.A.2
  • 35
    • 84947216836 scopus 로고    scopus 로고
    • Criteria used for selecting envelope wall systems in Chilean residential projects
    • Martabid, J. and Mourgues, C. (2015), "Criteria used for selecting envelope wall systems in Chilean residential projects", Journal of Construction Engineering and Management, Vol. 141 No. 12, doi: 10.1061/(ASCE)CO.1943-7862.0001025.
    • (2015) Journal of Construction Engineering and Management , vol.141 , Issue.12
    • Martabid, J.1    Mourgues, C.2
  • 36
    • 0034694501 scopus 로고    scopus 로고
    • Lean, agile or leagile? Matching your supply chain to the marketplace
    • Mason-Jones, R., Naylor, B. and Towill, DR. (2000), "Lean, agile or leagile? Matching your supply chain to the marketplace", International Journal of Production Research, Vol. 38 No. 17, pp. 4061-4070.
    • (2000) International Journal of Production Research , vol.38 , Issue.17 , pp. 4061-4070
    • Mason-Jones, R.1    Naylor, B.2    Towill, D.R.3
  • 37
    • 84901463020 scopus 로고    scopus 로고
    • New developments in curtain wall and glazing systems
    • Memari, A. (Ed.) American Society of Civil Engineers, Reston, VA
    • Memari, A. (2013), "New developments in curtain wall and glazing systems", in Memari, A. (Ed.), Curtain Wall Systems, American Society of Civil Engineers, Reston, VA, pp. 194-209.
    • (2013) Curtain Wall Systems , pp. 194-209
    • Memari, A.1
  • 38
    • 84929630975 scopus 로고    scopus 로고
    • Dynamic control of construction supply chain to improve labor performance
    • Moon, S., Zekavat, P.R. and Bernold, L.E. (2015), "Dynamic control of construction supply chain to improve labor performance", Journal of Construction Engineering and Management, Vol. 141 No. 6, doi: 10.1061/(ASCE)CO.1943-7862.0000970.
    • (2015) Journal of Construction Engineering and Management , vol.141 , Issue.6
    • Moon, S.1    Zekavat, P.R.2    Bernold, L.E.3
  • 40
    • 0041325311 scopus 로고    scopus 로고
    • A procedure for multi-criteria selection of building assemblies
    • Nassar, K. (2003), "A procedure for multi-criteria selection of building assemblies", Automation in Construction, Vol. 12 No. 5, pp. 543-560.
    • (2003) Automation in Construction , vol.12 , Issue.5 , pp. 543-560
    • Nassar, K.1
  • 41
    • 84930677691 scopus 로고    scopus 로고
    • Effect of wall construction materials over indoor air quality in humid and hot climate
    • Nematchoua, M.K., Tchinda, R., Orosa, J.A. and Andreasi, W.A. (2015), "Effect of wall construction materials over indoor air quality in humid and hot climate", Journal of Building Engineering, Vol. 3, pp. 16-23, doi: 10.1016/j.jobe.2015.05.002.
    • (2015) Journal of Building Engineering , vol.3 , pp. 16-23
    • Nematchoua, M.K.1    Tchinda, R.2    Orosa, J.A.3    Andreasi, W.A.4
  • 42
    • 84905115668 scopus 로고    scopus 로고
    • An assessment for leakage reduction methods of reservoir embankments through estimation of CO2 emissions during the construction process
    • Noh, S., Son, Y., Bong, T. and Park, J. (2014), "An assessment for leakage reduction methods of reservoir embankments through estimation of CO2 emissions during the construction process", Journal of Cleaner Production, Vol. 79, pp. 116-123, doi: 10.1016/j.jclepro.2014.05.020.
    • (2014) Journal of Cleaner Production , vol.79 , pp. 116-123
    • Noh, S.1    Son, Y.2    Bong, T.3    Park, J.4
  • 44
    • 0037810496 scopus 로고    scopus 로고
    • Strategic positioning of the order penetration point
    • Olhager, J. (2003), "Strategic positioning of the order penetration point", International Journal of Production Economics, Vol. 85 No. 3, pp. 319-329.
    • (2003) International Journal of Production Economics , vol.85 , Issue.3 , pp. 319-329
    • Olhager, J.1
  • 45
    • 78650858064 scopus 로고    scopus 로고
    • Sustainability assessment of flooring systems in the city of Tehran: An AHP-based life cycle analysis
    • Reza, B., Sadiq, R. and Hewage, K. (2011), "Sustainability assessment of flooring systems in the city of Tehran: an AHP-based life cycle analysis", Construction and Building Materials, Vol. 25 No. 4, pp. 2053-2066.
    • (2011) Construction and Building Materials , vol.25 , Issue.4 , pp. 2053-2066
    • Reza, B.1    Sadiq, R.2    Hewage, K.3
  • 46
    • 84897086557 scopus 로고    scopus 로고
    • Design for maintenance accessibility using BIM tools
    • Rui, L. and Raja, R.A.I. (2014), "Design for maintenance accessibility using BIM tools", Facilities, Vol. 32 Nos 3/4, pp. 153-159.
    • (2014) Facilities , vol.32 , Issue.3-4 , pp. 153-159
    • Rui, L.1    Raja, R.A.I.2
  • 48
    • 79959429655 scopus 로고    scopus 로고
    • Optimizing material procurement and storage on construction sites
    • Said, H. and El-Rayes, K. (2011), "Optimizing material procurement and storage on construction sites", Journal of Construction Engineering and Management, Vol. 137 No. 6, pp. 421-431.
    • (2011) Journal of Construction Engineering and Management , vol.137 , Issue.6 , pp. 421-431
    • Said, H.1    El-Rayes, K.2
  • 50
    • 79953178184 scopus 로고    scopus 로고
    • The hidden cost of transportation of construction materials: An overview
    • Shakantu, W., Tookey, J. and Bowen, P. (2003), "The hidden cost of transportation of construction materials: an overview", Journal of Engineering, Design and Technology, Vol. 1 No. 1, pp. 103-118.
    • (2003) Journal of Engineering, Design and Technology , vol.1 , Issue.1 , pp. 103-118
    • Shakantu, W.1    Tookey, J.2    Bowen, P.3
  • 56
    • 84878618501 scopus 로고    scopus 로고
    • Transportation responsiveness and efficiency within the building supply chain
    • Vidalakis, C. and Sommerville, J. (2013), "Transportation responsiveness and efficiency within the building supply chain", Building Research and Information, Vol. 41 No. 4, pp. 469-481.
    • (2013) Building Research and Information , vol.41 , Issue.4 , pp. 469-481
    • Vidalakis, C.1    Sommerville, J.2
  • 58
    • 84879665132 scopus 로고    scopus 로고
    • Demand uncertainty in construction supply chains: A discrete event simulation study
    • Vidalakis, C, Tookey, J.E. and Sommerville, J. (2013), "Demand uncertainty in construction supply chains: a discrete event simulation study", Journal of the Operational Research Society, Vol. 64 No. 8, pp. 1194-1204.
    • (2013) Journal of the Operational Research Society , vol.64 , Issue.8 , pp. 1194-1204
    • Vidalakis, C.1    Tookey, J.E.2    Sommerville, J.3
  • 60
    • 84944442108 scopus 로고    scopus 로고
    • A BM-based approach for automated tower crane layout planning
    • Wang, J., Zhang, X.D., Shou, W.C., Wang, X.Y., Xu, B., Kim, M.J. and Wu, P. (2015), "A BM-based approach for automated tower crane layout planning", Automation in Construction, Vol. 59, pp. 168-178, doi: 10.1016/j.autcon.2015.05.006.
    • (2015) Automation in Construction , vol.59 , pp. 168-178
    • Wang, J.1    Zhang, X.D.2    Shou, W.C.3    Wang, X.Y.4    Xu, B.5    Kim, M.J.6    Wu, P.7
  • 61
    • 84918808638 scopus 로고    scopus 로고
    • Integrating BIM and augmented reality for interactive architectural visualization
    • Wang, J.C., Wang, X.Y., Shou, W.C. and Xu, B. (2014), "Integrating BIM and augmented reality for interactive architectural visualization", Construction Innovation, Vol. 14 No. 4, pp. 453-476.
    • (2014) Construction Innovation , vol.14 , Issue.4 , pp. 453-476
    • Wang, J.C.1    Wang, X.Y.2    Shou, W.C.3    Xu, B.4
  • 62
    • 34548400272 scopus 로고    scopus 로고
    • Application of the analytic hierarchy process (AHP) in multi-criteria analysis of the selection of intelligent building systems
    • Wong, J.K.W. and Li, H. (2008), "Application of the analytic hierarchy process (AHP) in multi-criteria analysis of the selection of intelligent building systems", Building and Environment, Vol. 43 No. 1, pp. 108-125.
    • (2008) Building and Environment , vol.43 , Issue.1 , pp. 108-125
    • Wong, J.K.W.1    Li, H.2
  • 63
    • 71649104491 scopus 로고    scopus 로고
    • Greenhouse gas emissions in building construction: A case study of one peking in Hong Kong
    • Yan, H., Shen, Q.P., Fan, L.C.H., Wang, Y.W. and Zhang, L. (2010), "Greenhouse gas emissions in building construction: a case study of one Peking in Hong Kong", Building and Environment, Vol. 45 No. 4, pp. 949-955.
    • (2010) Building and Environment , vol.45 , Issue.4 , pp. 949-955
    • Yan, H.1    Shen, Q.P.2    Fan, L.C.H.3    Wang, Y.W.4    Zhang, L.5
  • 64
    • 57249086473 scopus 로고    scopus 로고
    • Multi-objective optimization of material selection for sustainable products: Artificial neural networks and genetic algorithm approach
    • Zhou, C.C., Yin, G.F. and Hu, X.B. (2009), "Multi-objective optimization of material selection for sustainable products: artificial neural networks and genetic algorithm approach", Materials & Design, Vol. 30 No. 4, pp. 1209-1215.
    • (2009) Materials & Design , vol.30 , Issue.4 , pp. 1209-1215
    • Zhou, C.C.1    Yin, G.F.2    Hu, X.B.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.