메뉴 건너뛰기




Volumn 55, Issue 23, 2017, Pages 7073-7095

Towards a conceptual framework for value stream mapping (VSM) implementation: an investigation of managerial factors

Author keywords

empirical study; lean implementation; lean manufacturing; value stream mapping; VSM

Indexed keywords

CORRELATION METHODS; LEAN PRODUCTION; MANAGERS; MANUFACTURE; SURVEYS;

EID: 85021844972     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2017.1347302     Document Type: Article
Times cited : (54)

References (68)
  • 1
    • 33846919290 scopus 로고    scopus 로고
    • Analyzing the Benefits of Lean Manufacturing and Value Stream Mapping via Simulation: A Process Sector Case Study
    • Abdulmalek, F. A., and J., Rajgopal. 2007. “Analyzing the Benefits of Lean Manufacturing and Value Stream Mapping via Simulation: A Process Sector Case Study.” International Journal of Production Economics 107 (1): 223–236.10.1016/j.ijpe.2006.09.009
    • (2007) International Journal of Production Economics , vol.107 , Issue.1 , pp. 223-236
    • Abdulmalek, F.A.1    Rajgopal, J.2
  • 3
    • 43849084667 scopus 로고    scopus 로고
    • A Research Agenda for Value Stream Mapping the Sales Process
    • Barber, Clifford S., and B. C., Tietje. 2008. “A Research Agenda for Value Stream Mapping the Sales Process.” Journal of Personal Selling & Sales Management 28 (2): 155–165.10.2753/PSS0885-3134280204
    • (2008) Journal of Personal Selling & Sales Management , vol.28 , Issue.2 , pp. 155-165
    • Barber, C.S.1    Tietje, B.C.2
  • 4
    • 84906321795 scopus 로고    scopus 로고
    • The Impact of Lean Methods and Tools on the Operational Performance of Manufacturing Organisations
    • Belekoukias, I., J. A., Garza-Reyes, and V., Kumar. 2014. “The Impact of Lean Methods and Tools on the Operational Performance of Manufacturing Organisations.” International Journal of Production Research 52 (18): 5346–5366.10.1080/00207543.2014.903348
    • (2014) International Journal of Production Research , vol.52 , Issue.18 , pp. 5346-5366
    • Belekoukias, I.1    Garza-Reyes, J.A.2    Kumar, V.3
  • 8
    • 84930989107 scopus 로고    scopus 로고
    • An Analysis of Managerial Factors Affecting the Implementation and Use of Overall Equipment Effectiveness
    • Binti Aminuddin, N. A., J. A., Garza-Reyes, V., Kumar, and J., Antony. 2016. “An Analysis of Managerial Factors Affecting the Implementation and Use of Overall Equipment Effectiveness.” International Journal of Production Research 54 (15): 4430–4447.
    • (2016) International Journal of Production Research , vol.54 , Issue.15 , pp. 4430-4447
    • Binti Aminuddin, N.A.1    Garza-Reyes, J.A.2    Kumar, V.3    Antony, J.4
  • 9
    • 85018422879 scopus 로고    scopus 로고
    • Research on the Lean Process Reengineering Based on Value Stream Mapping for Chinese Enterprises
    • Bo, M., and M., Dong. 2012. “Research on the Lean Process Reengineering Based on Value Stream Mapping for Chinese Enterprises.” Management Science and Engineering 6 (2): 103–106.
    • (2012) Management Science and Engineering , vol.6 , Issue.2 , pp. 103-106
    • Bo, M.1    Dong, M.2
  • 10
    • 33746814817 scopus 로고    scopus 로고
    • A New Value Stream Mapping Approach for Complex Production Systems
    • Braglia, M., G., Carmignani, and F., Zammori. 2006. “A New Value Stream Mapping Approach for Complex Production Systems.” International Journal of Production Research 44 (18–19): 3929–3952.10.1080/00207540600690545
    • (2006) International Journal of Production Research , vol.44 , Issue.18-19 , pp. 3929-3952
    • Braglia, M.1    Carmignani, G.2    Zammori, F.3
  • 15
    • 74549218802 scopus 로고    scopus 로고
    • From Value Stream Mapping toward a Lean/Sigma Continuous Improvement Process: An Industrial Case Study
    • Chen, J. C., Y., Li, and B. D., Shady. 2010. “From Value Stream Mapping toward a Lean/Sigma Continuous Improvement Process: An Industrial Case Study.” International Journal of Production Research 48 (4): 1069–1086.10.1080/00207540802484911
    • (2010) International Journal of Production Research , vol.48 , Issue.4 , pp. 1069-1086
    • Chen, J.C.1    Li, Y.2    Shady, B.D.3
  • 16
    • 82955207650 scopus 로고    scopus 로고
    • Improvement of Manufacturing Operations at a Pharmaceutical Company
    • Chowdary, B. V., and D., George. 2011. “Improvement of Manufacturing Operations at a Pharmaceutical Company.” Journal of Manufacturing Technology Management 23 (1): 56–75.10.1108/17410381211196285
    • (2011) Journal of Manufacturing Technology Management , vol.23 , Issue.1 , pp. 56-75
    • Chowdary, B.V.1    George, D.2
  • 17
    • 79956150546 scopus 로고    scopus 로고
    • Improving the Quality of Emergency Department Care by Removing Waste Using Lean Value Stream Mapping
    • Cookson, D., C., Read, and M., Cooke. 2011. “Improving the Quality of Emergency Department Care by Removing Waste Using Lean Value Stream Mapping.” The International Journal of Clinical Leadership 17 (1): 25–30.
    • (2011) The International Journal of Clinical Leadership , vol.17 , Issue.1 , pp. 25-30
    • Cookson, D.1    Read, C.2    Cooke, M.3
  • 19
    • 84903155926 scopus 로고    scopus 로고
    • Value Stream Mapping: A Study about the Problems and Challenges Found in the Literature from the past 15 Years about Application of Lean Tools
    • Forno, A., F., Pereira, F., Forcellini, and L., Kipper. 2014. “Value Stream Mapping: A Study about the Problems and Challenges Found in the Literature from the past 15 Years about Application of Lean Tools.” The International Journal of Advanced Manufacturing Technology 72 (5–8): 779–790.10.1007/s00170-014-5712-z
    • (2014) The International Journal of Advanced Manufacturing Technology , vol.72 , Issue.5-8 , pp. 779-790
    • Forno, A.1    Pereira, F.2    Forcellini, F.3    Kipper, L.4
  • 20
    • 51249083484 scopus 로고    scopus 로고
    • An Initiative to Implement Lean Manufacturing Using Value Stream Mapping in a Small Company
    • Grewal, C., 2008. “An Initiative to Implement Lean Manufacturing Using Value Stream Mapping in a Small Company.” International Journal of Manufacturing Technology and Management 15 (3/4): 404–417.10.1504/IJMTM.2008.020176
    • (2008) International Journal of Manufacturing Technology and Management , vol.15 , Issue.3-4 , pp. 404-417
    • Grewal, C.1
  • 21
    • 84947022311 scopus 로고    scopus 로고
    • A New Value Stream Mapping Approach for Healthcare Environments
    • Henrique, D., A., Rentes, M., Godinho Filho, and K., Esposto. 2016. “A New Value Stream Mapping Approach for Healthcare Environments.” Production Planning & Control 27 (1): 24–48.10.1080/09537287.2015.1051159
    • (2016) Production Planning & Control , vol.27 , Issue.1 , pp. 24-48
    • Henrique, D.1    Rentes, A.2    Godinho Filho, M.3    Esposto, K.4
  • 23
    • 33747517619 scopus 로고    scopus 로고
    • The Promise of Virtual Teams: Identifying Key Factors in Effectiveness and Failure
    • Horwitz, F. M., D., Bravington, and U., Silvis. 2006. “The Promise of Virtual Teams: Identifying Key Factors in Effectiveness and Failure.” Journal of European Industrial Training 30 (6): 472–494.10.1108/03090590610688843
    • (2006) Journal of European Industrial Training , vol.30 , Issue.6 , pp. 472-494
    • Horwitz, F.M.1    Bravington, D.2    Silvis, U.3
  • 26
    • 84904674544 scopus 로고    scopus 로고
    • Applying Value Stream Mapping Technique for Production Improvement in a Manufacturing Company: A Case Study
    • Jeyaraj, K., C., Muralidharan, R., Mahalingam, and S., Deshmukh. 2013. “Applying Value Stream Mapping Technique for Production Improvement in a Manufacturing Company: A Case Study.” Journal of the Institution of Engineers (India): Series C 94 (1): 43–52.10.1007/s40032-012-0053-x
    • (2013) Journal of the Institution of Engineers (India): Series C , vol.94 , Issue.1 , pp. 43-52
    • Jeyaraj, K.1    Muralidharan, C.2    Mahalingam, R.3    Deshmukh, S.4
  • 27
    • 84859054613 scopus 로고    scopus 로고
    • A Conceptual Framework for Critical Success Factors of Lean Six Sigma
    • Jeyaraman, K., and L. K., Kee Teo. 2010. “A Conceptual Framework for Critical Success Factors of Lean Six Sigma.” International Journal of Lean Six Sigma 1 (3): 191–215.10.1108/20401461011075008
    • (2010) International Journal of Lean Six Sigma , vol.1 , Issue.3 , pp. 191-215
    • Jeyaraman, K.1    Kee Teo, L.K.2
  • 28
    • 84873422488 scopus 로고    scopus 로고
    • A Methodology for Effective Implementation of Lean Strategies and Its Performance Evaluation in Manufacturing Organizations
    • Karim, A., and K., Arif-Uz-Zaman. 2013. “A Methodology for Effective Implementation of Lean Strategies and Its Performance Evaluation in Manufacturing Organizations.” Business Process Management Journal 19 (1): 169–196.10.1108/14637151311294912
    • (2013) Business Process Management Journal , vol.19 , Issue.1 , pp. 169-196
    • Karim, A.1    Arif-Uz-Zaman, K.2
  • 31
    • 84906318853 scopus 로고    scopus 로고
    • Prioritisation of Operations Improvement Projects in the European Manufacturing Industry
    • Kirkham, L., J. A., Garza-Reyes, V., Kumar, and J., Antony. 2014. “Prioritisation of Operations Improvement Projects in the European Manufacturing Industry.” International Journal of Production Research 52 (18): 5323–5345.10.1080/00207543.2014.903345
    • (2014) International Journal of Production Research , vol.52 , Issue.18 , pp. 5323-5345
    • Kirkham, L.1    Garza-Reyes, J.A.2    Kumar, V.3    Antony, J.4
  • 32
    • 84908156073 scopus 로고    scopus 로고
    • Status of Quality Management Practices in Manufacturing SMEs: A Comparative Study between Australia and the UK
    • Kumar, M., K. K., Khurshid, and D., Waddell. 2014. “Status of Quality Management Practices in Manufacturing SMEs: A Comparative Study between Australia and the UK.” International Journal of Production Research 52 (21): 6482–6495.10.1080/00207543.2014.948574
    • (2014) International Journal of Production Research , vol.52 , Issue.21 , pp. 6482-6495
    • Kumar, M.1    Khurshid, K.K.2    Waddell, D.3
  • 35
    • 84922961900 scopus 로고    scopus 로고
    • Implementing Lean Standard Work to Solve a Low Work-in-process Buffer Problem in a Highly Automated Manufacturing Environment
    • Lu, J. C., and T., Yang. 2015. “Implementing Lean Standard Work to Solve a Low Work-in-process Buffer Problem in a Highly Automated Manufacturing Environment.” International Journal of Production Research 53 (8): 2285–2305.10.1080/00207543.2014.937009
    • (2015) International Journal of Production Research , vol.53 , Issue.8 , pp. 2285-2305
    • Lu, J.C.1    Yang, T.2
  • 40
    • 62349090779 scopus 로고    scopus 로고
    • The Virtual Geographies of Social Networks: A Comparative Analysis of Facebook, LinkedIn and ASmallWorld
    • Papacharissi, Z., 2009. “The Virtual Geographies of Social Networks: A Comparative Analysis of Facebook, LinkedIn and ASmallWorld.” New Media & Society 11 (1–2): 199–220.10.1177/1461444808099577
    • (2009) New Media & Society , vol.11 , Issue.1-2 , pp. 199-220
    • Papacharissi, Z.1
  • 41
    • 84896783621 scopus 로고    scopus 로고
    • Production Efficiency Improvement in Batch Production System Using Value Stream Mapping and Simulation: A Case Study of the Roasted and Ground Coffee Industry
    • Parthanadee, P., and J., Buddhakulsomsiri. 2014. “Production Efficiency Improvement in Batch Production System Using Value Stream Mapping and Simulation: A Case Study of the Roasted and Ground Coffee Industry.” Production Planning & Control 25 (5): 425–446.10.1080/09537287.2012.702866
    • (2014) Production Planning & Control , vol.25 , Issue.5 , pp. 425-446
    • Parthanadee, P.1    Buddhakulsomsiri, J.2
  • 43
    • 34547808744 scopus 로고    scopus 로고
    • Measuring the Impact of Lean Tools on the Cost–Time Investment of a Product Using Cost–Time Profiles
    • Rivera, L., and F. F., Chen. 2007. “Measuring the Impact of Lean Tools on the Cost–Time Investment of a Product Using Cost–Time Profiles.” Robotics & Computer-Integrated Manufacturing 23 (6): 684–689.10.1016/j.rcim.2007.02.013
    • (2007) Robotics & Computer-Integrated Manufacturing , vol.23 , Issue.6 , pp. 684-689
    • Rivera, L.1    Chen, F.F.2
  • 44
    • 84868709021 scopus 로고    scopus 로고
    • 3rd ed, Chichester: John Wiley
    • Robson, C., 2011. Real World Research. 3rd ed. Chichester: John Wiley.
    • (2011) Real World Research
    • Robson, C.1
  • 46
    • 0004277453 scopus 로고    scopus 로고
    • Cambridge, MA: Lean Enterprise Institute, and
    • Rother, M., and J., Shook. 1998. Learning to See. Cambridge, MA: Lean Enterprise Institute.
    • (1998) Learning to See
    • Rother, M.1    Shook, J.2
  • 48
    • 84949650958 scopus 로고    scopus 로고
    • A VSM Improvement-based Approach for Lean Operations in an Indian Manufacturing SME
    • Saboo, A., J. A., Reyes, A., Er, and V., Kumar. 2014. “A VSM Improvement-based Approach for Lean Operations in an Indian Manufacturing SME.” International Journal of Lean Enterprise Research 1 (1): 41–58.10.1504/IJLER.2014.062281
    • (2014) International Journal of Lean Enterprise Research , vol.1 , Issue.1 , pp. 41-58
    • Saboo, A.1    Reyes, J.A.2    Er, A.3    Kumar, V.4
  • 50
    • 61449233284 scopus 로고    scopus 로고
    • Extent of the Use of Lean Concepts Proposed for a Value Stream Mapping Application
    • Serrano Lasa, I., R., Castro, and C., Laburu. 2009. “Extent of the Use of Lean Concepts Proposed for a Value Stream Mapping Application.” Production Planning & Control 20 (1): 82–98.10.1080/09537280802685322
    • (2009) Production Planning & Control , vol.20 , Issue.1 , pp. 82-98
    • Serrano Lasa, I.1    Castro, R.2    Laburu, C.3
  • 51
    • 43049145528 scopus 로고    scopus 로고
    • Application of Value Stream Mapping (VSM) for Minimization of Wastes in the Processing Side of Supply Chain of Cottonseed Oil Industry in Indian Context
    • Seth, D., N., Seth, and D., Goel. 2008. “Application of Value Stream Mapping (VSM) for Minimization of Wastes in the Processing Side of Supply Chain of Cottonseed Oil Industry in Indian Context.” Journal of Manufacturing Technology Management 19 (4): 529–550.10.1108/17410380810869950
    • (2008) Journal of Manufacturing Technology Management , vol.19 , Issue.4 , pp. 529-550
    • Seth, D.1    Seth, N.2    Goel, D.3
  • 55
    • 70350291357 scopus 로고    scopus 로고
    • Value Stream Mapping as a Versatile Tool for Lean Implementation: An Indian Case Study of a Manufacturing Firm
    • Singh, B., and S. K., Sharma. 2009. “Value Stream Mapping as a Versatile Tool for Lean Implementation: An Indian Case Study of a Manufacturing Firm.” Measuring Business Excellence 13 (3): 58–68.10.1108/13683040910984338
    • (2009) Measuring Business Excellence , vol.13 , Issue.3 , pp. 58-68
    • Singh, B.1    Sharma, S.K.2
  • 56
    • 79953038987 scopus 로고    scopus 로고
    • Value Stream Mapping: Literature Review and Implications for Indian Industry
    • Singh, B., S. K., Garg, and S. K., Sharma. 2011. “Value Stream Mapping: Literature Review and Implications for Indian Industry.” The International Journal of Advanced Manufacturing Technology 53 (5–8): 799–809.10.1007/s00170-010-2860-7
    • (2011) The International Journal of Advanced Manufacturing Technology , vol.53 , Issue.5-8 , pp. 799-809
    • Singh, B.1    Garg, S.K.2    Sharma, S.K.3
  • 57
    • 77957878011 scopus 로고    scopus 로고
    • Supplier Integration Strategy for Lean Manufacturing Adoption in Electronic-enabled Supply Chains
    • So, S., and H., Sun. 2010. “Supplier Integration Strategy for Lean Manufacturing Adoption in Electronic-enabled Supply Chains.” Supply Chain Management: An International Journal 15 (6): 474–487.10.1108/13598541011080455
    • (2010) Supply Chain Management: An International Journal , vol.15 , Issue.6 , pp. 474-487
    • So, S.1    Sun, H.2
  • 58
    • 84992388237 scopus 로고    scopus 로고
    • Minimization of Service Disturbance: VSM Based Case Study in Telecommunication Industry
    • Stadnicka, D., and R. M. C., Ratnayake. 2016. “Minimization of Service Disturbance: VSM Based Case Study in Telecommunication Industry.” IFAC PapersOnLine 49 (12): 255–260.10.1016/j.ifacol.2016.07.609
    • (2016) IFAC PapersOnLine , vol.49 , Issue.12 , pp. 255-260
    • Stadnicka, D.1    Ratnayake, R.M.C.2
  • 59
    • 84855526373 scopus 로고    scopus 로고
    • Applying Value Stream Mapping Techniques to Eliminate Non-value-added Waste for the Procurement of Endovascular Stents
    • Teichgräber, U. K., and M., de Bucourt. 2012. “Applying Value Stream Mapping Techniques to Eliminate Non-value-added Waste for the Procurement of Endovascular Stents.” European Journal of Radiology 81 (1): e47–e52.10.1016/j.ejrad.2010.12.045
    • (2012) European Journal of Radiology , vol.81 , Issue.1 , pp. e47-e52
    • Teichgräber, U.K.1    de Bucourt, M.2
  • 61
    • 57849138318 scopus 로고    scopus 로고
    • Applying Lean Six Sigma in a Small Engineering Company–A Model for Change
    • Thomas, A., R., Barton, and C., Chuke-Okafor. 2009. “Applying Lean Six Sigma in a Small Engineering Company–A Model for Change.” Journal of Manufacturing Technology Management 20 (1): 113–129.
    • (2009) Journal of Manufacturing Technology Management , vol.20 , Issue.1 , pp. 113-129
    • Thomas, A.1    Barton, R.2    Chuke-Okafor, C.3
  • 62
    • 84920548610 scopus 로고    scopus 로고
    • Value Stream Mapping to Reduce the Lead-time of a Product Development Process
    • Tyagi, S., A., Choudhary, X., Cai, and K., Yang. 2015. “Value Stream Mapping to Reduce the Lead-time of a Product Development Process.” International Journal of Production Economics 160: 202–212.10.1016/j.ijpe.2014.11.002
    • (2015) International Journal of Production Economics , vol.160 , pp. 202-212
    • Tyagi, S.1    Choudhary, A.2    Cai, X.3    Yang, K.4
  • 63
    • 84924376860 scopus 로고    scopus 로고
    • Lean Manufacturing Implementation Using Value Stream Mapping as a Tool
    • Vamsi Krishna Jasti, N., and A., Sharma. 2014. “Lean Manufacturing Implementation Using Value Stream Mapping as a Tool.” International Journal of Lean Six Sigma 5 (1): 89–116.10.1108/IJLSS-04-2012-0002
    • (2014) International Journal of Lean Six Sigma , vol.5 , Issue.1 , pp. 89-116
    • Vamsi Krishna Jasti, N.1    Sharma, A.2
  • 64
    • 84989258238 scopus 로고    scopus 로고
    • Application of Value Stream Mapping for Reduction of Cycle Time in a Machining Process
    • Venkataraman, K., B. V., Ramnath, V. M., Kumar, and C., Elanchezhian. 2014. “Application of Value Stream Mapping for Reduction of Cycle Time in a Machining Process.” Procedia Materials Science 6: 1187–1196.10.1016/j.mspro.2014.07.192
    • (2014) Procedia Materials Science , vol.6 , pp. 1187-1196
    • Venkataraman, K.1    Ramnath, B.V.2    Kumar, V.M.3    Elanchezhian, C.4
  • 65
    • 84961202159 scopus 로고    scopus 로고
    • Lean Road Transportation–A Systematic Method for the Improvement of Road Transport Operations
    • Villarreal, B., J. A., Garza-Reyes, and V., Kumar. 2016. “Lean Road Transportation–A Systematic Method for the Improvement of Road Transport Operations.” Production Planning & Control 27 (11): 865–877.10.1080/09537287.2016.1152405
    • (2016) Production Planning & Control , vol.27 , Issue.11 , pp. 865-877
    • Villarreal, B.1    Garza-Reyes, J.A.2    Kumar, V.3
  • 67
    • 33845599402 scopus 로고    scopus 로고
    • Value Stream Mapping
    • Womack, J. P., 2006. “Value Stream Mapping.” Manufacturing Engineering 136 (5): 145–156.
    • (2006) Manufacturing Engineering , vol.136 , Issue.5 , pp. 145-156
    • Womack, J.P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.