3D-Based Crane Evaluation System for Mobile Crane Operation Selection on Modular-Based Heavy Construction Sites

Author keywords

Crane evaluation; Cycle time; Information technologies; Mobile crane operation; Modular construction; Productivy; Safety; Simulation; Three dimensional (3D) visualization

Indexed keywords

ACCIDENT PREVENTION; DESIGN; INFORMATION TECHNOLOGY; MODULAR CONSTRUCTION; PROJECT MANAGEMENT; SITE SELECTION; THREE DIMENSIONAL COMPUTER GRAPHICS; VISUALIZATION;

EID: 85020891498     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0001360     Document Type: Article
Times cited : (47)

References (45)
  • 2
    • 81855184582 scopus 로고    scopus 로고
    • Research in modeling and simulation for improving construction engineering operations
    • AbouRizk, S., Halpin, D., Mohamed, Y., and, Hermann, U. (2011). " Research in modeling and simulation for improving construction engineering operations." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000288, 843-852.
    • (2011) J. Constr. Eng. Manage. , pp. 843-852
    • AbouRizk, S.1    Halpin, D.2    Mohamed, Y.3    Hermann, U.4
  • 3
    • 84860126303 scopus 로고    scopus 로고
    • Near real-time motion planning and simulation of cranes in construction: Framework and system architecture
    • Albahnassi, H., and, Hammad, A. (2012). " Near real-time motion planning and simulation of cranes in construction: Framework and system architecture." J. Comput. Civil Eng., 10.1061/(ASCE)CP.1943-5487.0000123, 54-63.
    • (2012) J. Comput. Civil Eng. , pp. 54-63
    • Albahnassi, H.1    Hammad, A.2
  • 4
    • 33746350454 scopus 로고    scopus 로고
    • Integrating 3D visualization and simulation for tower crane operations on construction sites
    • Al-Hussein, M., Athar Niaz, M., Yu, H., and, Kim, H. (2006). " Integrating 3D visualization and simulation for tower crane operations on construction sites." Autom. Constr., 15 (5), 554-562. 10.1016/j.autcon.2005.07.007
    • (2006) Autom. Constr. , vol.15 , Issue.5 , pp. 554-562
    • Al-Hussein, M.1    Athar Niaz, M.2    Yu, H.3    Kim, H.4
  • 5
    • 18144425787 scopus 로고    scopus 로고
    • Collision free path planning of cooperative crane manipulators using genetic algorithm
    • Ali, M. S. A. D., Babu, N. R., and, Varghese, K. (2005). " Collision free path planning of cooperative crane manipulators using genetic algorithm." J. Comput. Civil Eng., 10.1061/(ASCE)0887-3801(2005)19:2(182), 182-193.
    • (2005) J. Comput. Civil Eng. , pp. 182-193
    • Ali, M.S.A.D.1    Babu, N.R.2    Varghese, K.3
  • 6
    • 33747344709 scopus 로고    scopus 로고
    • Crane-related fatalities in the construction industry
    • Beavers, J. E., Moore, J. R., Rinehart, R., and, Schriver, W. R. (2006). " Crane-related fatalities in the construction industry." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2006)132:9(901), 901-910.
    • (2006) J. Constr. Eng. Manage. , pp. 901-910
    • Beavers, J.E.1    Moore, J.R.2    Rinehart, R.3    Schriver, W.R.4
  • 7
    • 77955567716 scopus 로고    scopus 로고
    • A physics-based simulation approach for cooperative erection activities
    • Chi, H.-L., and, Kang, S.-C. (2010). " A physics-based simulation approach for cooperative erection activities." Autom. Constr., 19 (6), 750-761. 10.1016/j.autcon.2010.03.004
    • (2010) Autom. Constr. , vol.19 , Issue.6 , pp. 750-761
    • Chi, H.-L.1    Kang, S.-C.2
  • 8
    • 84857356898 scopus 로고    scopus 로고
    • Design of a preliminary error impact analysis model for spatial safety assessment of earthmoving operations
    • Chi, S., and, Caldas, C. H. (2012). " Design of a preliminary error impact analysis model for spatial safety assessment of earthmoving operations." Autom. Constr., 22, 212-222. 10.1016/j.autcon.2011.06.019
    • (2012) Autom. Constr. , vol.22 , pp. 212-222
    • Chi, S.1    Caldas, C.H.2
  • 10
    • 84882317757 scopus 로고    scopus 로고
    • Return on investment analysis of using building information modeling in construction
    • Giel, B. K., and, Issa, R. R. A. (2013). " Return on investment analysis of using building information modeling in construction." J. Comput. Civil Eng., 10.1061/(ASCE)CP.1943-5487.0000164, 511-521.
    • (2013) J. Comput. Civil Eng. , pp. 511-521
    • Giel, B.K.1    Issa, R.R.A.2
  • 11
    • 0033315084 scopus 로고    scopus 로고
    • Simphony: An environment for building special purpose construction simulation tools
    • IEEE, New York
    • Hajjar, D., and, AbouRizk, S. M. (1999). " Simphony: An environment for building special purpose construction simulation tools." Proc., 31st Conf. on Winter Simulation, IEEE, New York, 998-1006.
    • (1999) Proc. 31st Conf. on Winter Simulation , pp. 998-1006
    • Hajjar, D.1    AbouRizk, S.M.2
  • 13
    • 81355149682 scopus 로고    scopus 로고
    • Automated post-simulation visualization of modular building production assembly line
    • Han, S. H., Al-Hussein, M., Al-Jibouri, S., and, Yu, H. (2012). " Automated post-simulation visualization of modular building production assembly line." Autom. Constr., 21, 229-236. 10.1016/j.autcon.2011.06.007
    • (2012) Autom. Constr. , vol.21 , pp. 229-236
    • Han, S.H.1    Al-Hussein, M.2    Al-Jibouri, S.3    Yu, H.4
  • 14
    • 84952362291 scopus 로고    scopus 로고
    • 3D visualization-based motion planning of mobile crane operations in heavy industrial projects
    • Han, S. H., Lei, Z., Bouferguene, A., Al-Hussein, M., and, Hermann, U. (2014). " 3D visualization-based motion planning of mobile crane operations in heavy industrial projects." J. Comput. Civil Eng., 30 (1), 1-11.
    • (2014) J. Comput. Civil Eng. , vol.30 , Issue.1 , pp. 1-11
    • Han, S.H.1    Lei, Z.2    Bouferguene, A.3    Al-Hussein, M.4    Hermann, U.5
  • 15
    • 79957509563 scopus 로고    scopus 로고
    • Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming
    • Huang, C., Wong, C. K., and, Tam, C. M. (2011). " Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming." Autom. Constr., 20 (5), 571-580. 10.1016/j.autcon.2010.11.023
    • (2011) Autom. Constr. , vol.20 , Issue.5 , pp. 571-580
    • Huang, C.1    Wong, C.K.2    Tam, C.M.3
  • 16
    • 84969913334 scopus 로고    scopus 로고
    • Weather-delay simulation model based on vertical weather profile for high-rise building construction
    • Jung, M., Park, M., Lee, H. S., and, Kim, H. (2016). " Weather-delay simulation model based on vertical weather profile for high-rise building construction." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0001109, 04016007.
    • (2016) J. Constr. Eng. Manage. , pp. 04016007
    • Jung, M.1    Park, M.2    Lee, H.S.3    Kim, H.4
  • 17
    • 70350060196 scopus 로고    scopus 로고
    • Three-dimensional simulation and visualization of crane assisted construction erection processes
    • Kang, S., Chi, H., and, Miranda, E. (2009). " Three-dimensional simulation and visualization of crane assisted construction erection processes." J. Constr. Eng. Manage., 10.1061/(ASCE)0887-3801(2009)23:6(363), 363-371.
    • (2009) J. Constr. Eng. Manage. , pp. 363-371
    • Kang, S.1    Chi, H.2    Miranda, E.3
  • 18
    • 45749134660 scopus 로고    scopus 로고
    • Computational methods for coordinating multiple construction cranes
    • Kang, S., and, Miranda, E. (2008). " Computational methods for coordinating multiple construction cranes." J. Comput. Civil Eng., 10.1061/(ASCE)0887-3801(2008)22:4(252), 252-263.
    • (2008) J. Comput. Civil Eng. , pp. 252-263
    • Kang, S.1    Miranda, E.2
  • 20
    • 84871768758 scopus 로고    scopus 로고
    • A methodology for mobile crane lift path checking in heavy industrial projects
    • Lei, Z., Taghaddos, H., Hermann, U., and, Al-Hussein, M. (2013 a). " A methodology for mobile crane lift path checking in heavy industrial projects." Autom. Constr., 31, 41-53. 10.1016/j.autcon.2012.11.042
    • (2013) Autom. Constr. , vol.31 , pp. 41-53
    • Lei, Z.1    Taghaddos, H.2    Hermann, U.3    Al-Hussein, M.4
  • 21
    • 84884659280 scopus 로고    scopus 로고
    • Automated method for checking crane paths for heavy lifts in industrial projects
    • Lei, Z., Taghaddos, H., Olearczyk, J., Al-Hussein, M., and, Hermann, U. (2013 b). " Automated method for checking crane paths for heavy lifts in industrial projects." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000740, 04013011.
    • (2013) J. Constr. Eng. Manage. , pp. 04013011
    • Lei, Z.1    Taghaddos, H.2    Olearczyk, J.3    Al-Hussein, M.4    Hermann, U.5
  • 22
    • 84898999695 scopus 로고    scopus 로고
    • Lift path planning for a nonholonomic crawler crane
    • Lin, Y., Wu, D., Wang, X., Wang, X., and, Gao, S. (2014). " Lift path planning for a nonholonomic crawler crane." Autom. Constr., 44, 12-24. 10.1016/j.autcon.2014.03.007
    • (2014) Autom. Constr. , vol.44 , pp. 12-24
    • Lin, Y.1    Wu, D.2    Wang, X.3    Wang, X.4    Gao, S.5
  • 25
    • 23244432395 scopus 로고    scopus 로고
    • Framework for building intelligent simulation models of construction operations
    • Mohamed, Y., and, AbouRizk, S. M. (2005). " Framework for building intelligent simulation models of construction operations." J. Comput. Civil Eng., 10.1061/(ASCE)0887-3801(2005)19:3(277), 277-291.
    • (2005) J. Comput. Civil Eng. , pp. 277-291
    • Mohamed, Y.1    AbouRizk, S.M.2
  • 26
    • 0035672055 scopus 로고    scopus 로고
    • A review of crane safey in the construction industry
    • Neitzel, R. L., Seixas, N. S., and, Ren, K. K. (2001). " A review of crane safey in the construction industry." Appl. Occup. Environ. Hyg., 16 (12), 1106-1117. 10.1080/10473220127411
    • (2001) Appl. Occup. Environ. Hyg. , vol.16 , Issue.12 , pp. 1106-1117
    • Neitzel, R.L.1    Seixas, N.S.2    Ren, K.K.3
  • 28
    • 0036838279 scopus 로고    scopus 로고
    • Automated path planning for mobile crane lifts
    • Reddy, H. R., and, Varghese, K. (2002). " Automated path planning for mobile crane lifts." Comput. Aided Civil Infrastruct. Eng., 17 (6), 439-448. 10.1111/0885-9507.00005
    • (2002) Comput. Aided Civil Infrastruct. Eng. , vol.17 , Issue.6 , pp. 439-448
    • Reddy, H.R.1    Varghese, K.2
  • 29
    • 0020941725 scopus 로고
    • Single crane location optimization
    • Rodriguez-Ramos, W. E., and, Francis, R. L. (1983). " Single crane location optimization." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1983)109:4(387), 387-397.
    • (1983) J. Constr. Eng. Manage. , pp. 387-397
    • Rodriguez-Ramos, W.E.1    Francis, R.L.2
  • 30
    • 79952306376 scopus 로고    scopus 로고
    • Modeling weather-sensitive construction activity using simulation
    • Shahin, A., AbouRizk, S. M., and, Mohamed, Y. (2011). " Modeling weather-sensitive construction activity using simulation." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000258, 238-246.
    • (2011) J. Constr. Eng. Manage. , pp. 238-246
    • Shahin, A.1    AbouRizk, S.M.2    Mohamed, Y.3
  • 31
    • 84910627274 scopus 로고    scopus 로고
    • Tower crane cycle times: Case study of remote-control versus cab-control operation
    • Shapira, A., and, Elbaz, A. (2014). " Tower crane cycle times: Case study of remote-control versus cab-control operation." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000904, 5014010.
    • (2014) J. Constr. Eng. Manage. , pp. 5014010
    • Shapira, A.1    Elbaz, A.2
  • 32
    • 34547858200 scopus 로고    scopus 로고
    • Cranes for building construction projects
    • Shapira, A., Lucko, G., and, Schexnayder, C. J. (2007). " Cranes for building construction projects." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2007)133:9(690), 690-700.
    • (2007) J. Constr. Eng. Manage. , pp. 690-700
    • Shapira, A.1    Lucko, G.2    Schexnayder, C.J.3
  • 34
    • 16444376810 scopus 로고    scopus 로고
    • Automated path planning of cooperative crane lifts using heuristic search
    • Sivakumar, P. L., Varghese, K., and, Babu, N. R. (2003). " Automated path planning of cooperative crane lifts using heuristic search." J. Comput. Civil Eng., 10.1061/(ASCE)0887-3801(2003)17:3(197), 197-207.
    • (2003) J. Comput. Civil Eng. , pp. 197-207
    • Sivakumar, P.L.1    Varghese, K.2    Babu, N.R.3
  • 35
    • 0041427756 scopus 로고    scopus 로고
    • Path planning in construction sites: Performance evaluation of the Dijkstra, A∗, and GA search algorithms
    • Soltani, A. R., Tawfik, H., Goulermas, J. Y., and, Fernando, T. (2002). " Path planning in construction sites: Performance evaluation of the Dijkstra, A∗, and GA search algorithms." Adv. Eng. Inf., 16 (4), 291-303.
    • (2002) Adv. Eng. Inf. , vol.16 , Issue.4 , pp. 291-303
    • Soltani, A.R.1    Tawfik, H.2    Goulermas, J.Y.3    Fernando, T.4
  • 36
    • 33747342143 scopus 로고    scopus 로고
    • Virtual shop model for experimental planning of steel fabrication projects
    • Song, L., and, AbouRizk, S. M. (2006). " Virtual shop model for experimental planning of steel fabrication projects." J. Comput. Civil Eng., 10.1061/(ASCE)0887-3801(2006)20:5(308), 308-316.
    • (2006) J. Comput. Civil Eng. , pp. 308-316
    • Song, L.1    AbouRizk, S.M.2
  • 37
    • 84884647057 scopus 로고    scopus 로고
    • Simulation-based auction protocol for resource scheduling problems
    • Taghaddos, H., AbouRizk, S., Mohamed, Y., and, Hermann, U. (2012). " Simulation-based auction protocol for resource scheduling problems." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000399, 31-42.
    • (2012) J. Constr. Eng. Manage. , pp. 31-42
    • Taghaddos, H.1    AbouRizk, S.2    Mohamed, Y.3    Hermann, U.4
  • 38
    • 84894487522 scopus 로고    scopus 로고
    • Simulation-based multiagent approach for scheduling modular construction
    • Taghaddos, H., Hermann, U., AbouRizk, S., and, Mohamed, Y. (2014). " Simulation-based multiagent approach for scheduling modular construction." J. Comput. Civil Eng., 10.1061/(ASCE)CP.1943-5487.0000262, 263-274.
    • (2014) J. Comput. Civil Eng. , pp. 263-274
    • Taghaddos, H.1    Hermann, U.2    AbouRizk, S.3    Mohamed, Y.4
  • 39
    • 0036165741 scopus 로고    scopus 로고
    • Nonlinear models for predicting hoisting times of tower cranes
    • Tam, C. M., Leung, A. W. T., and, Liu, D. K. (2002 a). " Nonlinear models for predicting hoisting times of tower cranes." J. Comput. Civil Eng., 10.1061/(ASCE)0887-3801(2002)16:1(76), 76-81.
    • (2002) J. Comput. Civil Eng. , pp. 76-81
    • Tam, C.M.1    Leung, A.W.T.2    Liu, D.K.3
  • 40
    • 0035392349 scopus 로고    scopus 로고
    • Genetic algorithm for optimizing supply locations around tower crane
    • Tam, C. M., Tong, C. M., Thomas, K. L., and, Chan, W. K. W. (2001). " Genetic algorithm for optimizing supply locations around tower crane." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2001)127:4(315), 315-321.
    • (2001) J. Constr. Eng. Manage. , pp. 315-321
    • Tam, C.M.1    Tong, C.M.2    Thomas, K.L.3    Chan, W.K.W.4
  • 41
    • 63649124542 scopus 로고    scopus 로고
    • Transformation of a 4D product and process model to generate motion of mobile cranes
    • Tantisevi, K., and, Akinci, B. (2009). " Transformation of a 4D product and process model to generate motion of mobile cranes." Autom. Constr., 18 (4), 458-468. 10.1016/j.autcon.2008.10.008
    • (2009) Autom. Constr. , vol.18 , Issue.4 , pp. 458-468
    • Tantisevi, K.1    Akinci, B.2
  • 43
    • 70349320487 scopus 로고    scopus 로고
    • Flow production of pipe spool fabrication: Simulation to support implementation of lean technique
    • Wang, P., Mohamed, Y., AbouRizk, S. M., and, Rawa, A. R. T. (2009). " Flow production of pipe spool fabrication: Simulation to support implementation of lean technique." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000068, 1027-1038.
    • (2009) J. Constr. Eng. Manage. , pp. 1027-1038
    • Wang, P.1    Mohamed, Y.2    AbouRizk, S.M.3    Rawa, A.R.T.4
  • 44
    • 84891388696 scopus 로고    scopus 로고
    • Vision-based tower crane tracking for understanding construction activity
    • Yang, J., Vela, P., Teizer, J., and, Shi, Z. (2014). " Vision-based tower crane tracking for understanding construction activity." J. Comput. Civil Eng., 10.1061/(ASCE)CP.1943-5487.0000242, 103-112.
    • (2014) J. Comput. Civil Eng. , pp. 103-112
    • Yang, J.1    Vela, P.2    Teizer, J.3    Shi, Z.4
  • 45
    • 0033101167 scopus 로고    scopus 로고
    • Location optimization for a group of tower cranes
    • Zhang, P., et al. (1999). " Location optimization for a group of tower cranes." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1999)125:2(115), 115-122.
    • (1999) J. Constr. Eng. Manage. , pp. 115-122
    • Zhang, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.