Research in modeling and simulation for improving construction engineering operations
-
AbouRizk, S., Halpin, D., Mohamed, Y., and, Hermann, U. (2011). " Research in modeling and simulation for improving construction engineering operations." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000288, 843-852.
-
(2011)
J. Constr. Eng. Manage.
, pp. 843-852
-
-
AbouRizk, S.1
Halpin, D.2
Mohamed, Y.3
Hermann, U.4
-
3
-
-
84860126303
-
Near real-time motion planning and simulation of cranes in construction: Framework and system architecture
-
Albahnassi, H., and, Hammad, A. (2012). " Near real-time motion planning and simulation of cranes in construction: Framework and system architecture." J. Comput. Civil Eng., 10.1061/(ASCE)CP.1943-5487.0000123, 54-63.
-
(2012)
J. Comput. Civil Eng.
, pp. 54-63
-
-
Albahnassi, H.1
Hammad, A.2
-
4
-
-
33746350454
-
Integrating 3D visualization and simulation for tower crane operations on construction sites
-
Al-Hussein, M., Athar Niaz, M., Yu, H., and, Kim, H. (2006). " Integrating 3D visualization and simulation for tower crane operations on construction sites." Autom. Constr., 15 (5), 554-562. 10.1016/j.autcon.2005.07.007
-
(2006)
Autom. Constr.
, vol.15
, Issue.5
, pp. 554-562
-
-
Al-Hussein, M.1
Athar Niaz, M.2
Yu, H.3
Kim, H.4
-
5
-
-
18144425787
-
Collision free path planning of cooperative crane manipulators using genetic algorithm
-
Ali, M. S. A. D., Babu, N. R., and, Varghese, K. (2005). " Collision free path planning of cooperative crane manipulators using genetic algorithm." J. Comput. Civil Eng., 10.1061/(ASCE)0887-3801(2005)19:2(182), 182-193.
-
(2005)
J. Comput. Civil Eng.
, pp. 182-193
-
-
Ali, M.S.A.D.1
Babu, N.R.2
Varghese, K.3
-
6
-
-
33747344709
-
Crane-related fatalities in the construction industry
-
Beavers, J. E., Moore, J. R., Rinehart, R., and, Schriver, W. R. (2006). " Crane-related fatalities in the construction industry." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2006)132:9(901), 901-910.
-
(2006)
J. Constr. Eng. Manage.
, pp. 901-910
-
-
Beavers, J.E.1
Moore, J.R.2
Rinehart, R.3
Schriver, W.R.4
-
7
-
-
77955567716
-
A physics-based simulation approach for cooperative erection activities
-
Chi, H.-L., and, Kang, S.-C. (2010). " A physics-based simulation approach for cooperative erection activities." Autom. Constr., 19 (6), 750-761. 10.1016/j.autcon.2010.03.004
-
(2010)
Autom. Constr.
, vol.19
, Issue.6
, pp. 750-761
-
-
Chi, H.-L.1
Kang, S.-C.2
-
8
-
-
84857356898
-
Design of a preliminary error impact analysis model for spatial safety assessment of earthmoving operations
-
Chi, S., and, Caldas, C. H. (2012). " Design of a preliminary error impact analysis model for spatial safety assessment of earthmoving operations." Autom. Constr., 22, 212-222. 10.1016/j.autcon.2011.06.019
-
(2012)
Autom. Constr.
, vol.22
, pp. 212-222
-
-
Chi, S.1
Caldas, C.H.2
-
9
-
-
38649094993
-
-
John Wiley & Sons, Hoboken, NJ
-
Eastman, C., Teicholz, P., Rafael, S., and, Liston, K. (2011). A guide to building information modeling for owners, managers, designers, engineers, and contractors, John Wiley & Sons, Hoboken, NJ.
-
(2011)
A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors
-
-
Eastman, C.1
Teicholz, P.2
Rafael, S.3
Liston, K.4
-
10
-
-
84882317757
-
Return on investment analysis of using building information modeling in construction
-
Giel, B. K., and, Issa, R. R. A. (2013). " Return on investment analysis of using building information modeling in construction." J. Comput. Civil Eng., 10.1061/(ASCE)CP.1943-5487.0000164, 511-521.
-
(2013)
J. Comput. Civil Eng.
, pp. 511-521
-
-
Giel, B.K.1
Issa, R.R.A.2
-
11
-
-
0033315084
-
Simphony: An environment for building special purpose construction simulation tools
-
IEEE, New York
-
Hajjar, D., and, AbouRizk, S. M. (1999). " Simphony: An environment for building special purpose construction simulation tools." Proc., 31st Conf. on Winter Simulation, IEEE, New York, 998-1006.
-
(1999)
Proc. 31st Conf. on Winter Simulation
, pp. 998-1006
-
-
Hajjar, D.1
AbouRizk, S.M.2
-
12
-
-
0004172988
-
-
2nd Ed. Wiley, New York
-
Halpin, D., and, Riggs, L. (1992). Construction management, 2nd Ed., Wiley, New York.
-
(1992)
Construction Management
-
-
Halpin, D.1
Riggs, L.2
-
13
-
-
81355149682
-
Automated post-simulation visualization of modular building production assembly line
-
Han, S. H., Al-Hussein, M., Al-Jibouri, S., and, Yu, H. (2012). " Automated post-simulation visualization of modular building production assembly line." Autom. Constr., 21, 229-236. 10.1016/j.autcon.2011.06.007
-
(2012)
Autom. Constr.
, vol.21
, pp. 229-236
-
-
Han, S.H.1
Al-Hussein, M.2
Al-Jibouri, S.3
Yu, H.4
-
14
-
-
84952362291
-
3D visualization-based motion planning of mobile crane operations in heavy industrial projects
-
Han, S. H., Lei, Z., Bouferguene, A., Al-Hussein, M., and, Hermann, U. (2014). " 3D visualization-based motion planning of mobile crane operations in heavy industrial projects." J. Comput. Civil Eng., 30 (1), 1-11.
-
(2014)
J. Comput. Civil Eng.
, vol.30
, Issue.1
, pp. 1-11
-
-
Han, S.H.1
Lei, Z.2
Bouferguene, A.3
Al-Hussein, M.4
Hermann, U.5
-
15
-
-
79957509563
-
Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming
-
Huang, C., Wong, C. K., and, Tam, C. M. (2011). " Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming." Autom. Constr., 20 (5), 571-580. 10.1016/j.autcon.2010.11.023
-
(2011)
Autom. Constr.
, vol.20
, Issue.5
, pp. 571-580
-
-
Huang, C.1
Wong, C.K.2
Tam, C.M.3
-
16
-
-
84969913334
-
Weather-delay simulation model based on vertical weather profile for high-rise building construction
-
Jung, M., Park, M., Lee, H. S., and, Kim, H. (2016). " Weather-delay simulation model based on vertical weather profile for high-rise building construction." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0001109, 04016007.
-
(2016)
J. Constr. Eng. Manage.
, pp. 04016007
-
-
Jung, M.1
Park, M.2
Lee, H.S.3
Kim, H.4
-
17
-
-
70350060196
-
Three-dimensional simulation and visualization of crane assisted construction erection processes
-
Kang, S., Chi, H., and, Miranda, E. (2009). " Three-dimensional simulation and visualization of crane assisted construction erection processes." J. Constr. Eng. Manage., 10.1061/(ASCE)0887-3801(2009)23:6(363), 363-371.
-
(2009)
J. Constr. Eng. Manage.
, pp. 363-371
-
-
Kang, S.1
Chi, H.2
Miranda, E.3
-
18
-
-
45749134660
-
Computational methods for coordinating multiple construction cranes
-
Kang, S., and, Miranda, E. (2008). " Computational methods for coordinating multiple construction cranes." J. Comput. Civil Eng., 10.1061/(ASCE)0887-3801(2008)22:4(252), 252-263.
-
(2008)
J. Comput. Civil Eng.
, pp. 252-263
-
-
Kang, S.1
Miranda, E.2
-
19
-
-
85020871751
-
Upgrading the automated crane management system for industrial construction projects
-
Teesside Univ. Middlesbrough, U.K
-
Lei, Z., Han, S. H., Al-Hussein, M., AbouRizk, S. M., Hermann, U., and, Bouferguene, A. (2014). " Upgrading the automated crane management system for industrial construction projects." Proc., Int. Conf. on Construction Application of Virtual Reality, Teesside Univ., Middlesbrough, U.K.
-
(2014)
Proc. Int. Conf. on Construction Application of Virtual Reality
-
-
Lei, Z.1
Han, S.H.2
Al-Hussein, M.3
AbouRizk, S.M.4
Hermann, U.5
Bouferguene, A.6
-
20
-
-
84871768758
-
A methodology for mobile crane lift path checking in heavy industrial projects
-
Lei, Z., Taghaddos, H., Hermann, U., and, Al-Hussein, M. (2013 a). " A methodology for mobile crane lift path checking in heavy industrial projects." Autom. Constr., 31, 41-53. 10.1016/j.autcon.2012.11.042
-
(2013)
Autom. Constr.
, vol.31
, pp. 41-53
-
-
Lei, Z.1
Taghaddos, H.2
Hermann, U.3
Al-Hussein, M.4
-
21
-
-
84884659280
-
Automated method for checking crane paths for heavy lifts in industrial projects
-
Lei, Z., Taghaddos, H., Olearczyk, J., Al-Hussein, M., and, Hermann, U. (2013 b). " Automated method for checking crane paths for heavy lifts in industrial projects." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000740, 04013011.
-
(2013)
J. Constr. Eng. Manage.
, pp. 04013011
-
-
Lei, Z.1
Taghaddos, H.2
Olearczyk, J.3
Al-Hussein, M.4
Hermann, U.5
-
22
-
-
84898999695
-
Lift path planning for a nonholonomic crawler crane
-
Lin, Y., Wu, D., Wang, X., Wang, X., and, Gao, S. (2014). " Lift path planning for a nonholonomic crawler crane." Autom. Constr., 44, 12-24. 10.1016/j.autcon.2014.03.007
-
(2014)
Autom. Constr.
, vol.44
, pp. 12-24
-
-
Lin, Y.1
Wu, D.2
Wang, X.3
Wang, X.4
Gao, S.5
-
25
-
-
23244432395
-
Framework for building intelligent simulation models of construction operations
-
Mohamed, Y., and, AbouRizk, S. M. (2005). " Framework for building intelligent simulation models of construction operations." J. Comput. Civil Eng., 10.1061/(ASCE)0887-3801(2005)19:3(277), 277-291.
-
(2005)
J. Comput. Civil Eng.
, pp. 277-291
-
-
Mohamed, Y.1
AbouRizk, S.M.2
-
26
-
-
0035672055
-
A review of crane safey in the construction industry
-
Neitzel, R. L., Seixas, N. S., and, Ren, K. K. (2001). " A review of crane safey in the construction industry." Appl. Occup. Environ. Hyg., 16 (12), 1106-1117. 10.1080/10473220127411
-
(2001)
Appl. Occup. Environ. Hyg.
, vol.16
, Issue.12
, pp. 1106-1117
-
-
Neitzel, R.L.1
Seixas, N.S.2
Ren, K.K.3
-
27
-
-
84865233073
-
-
Ph.D. dissertation, Univ. of Alberta, Edmonton, AB, Canada
-
Olearczyk, J. (2010). " Crane lifting operation planning and lifted object spatial trajectory analysis." Ph.D. dissertation, Univ. of Alberta, Edmonton, AB, Canada.
-
(2010)
Crane Lifting Operation Planning and Lifted Object Spatial Trajectory Analysis
-
-
Olearczyk, J.1
-
28
-
-
0036838279
-
Automated path planning for mobile crane lifts
-
Reddy, H. R., and, Varghese, K. (2002). " Automated path planning for mobile crane lifts." Comput. Aided Civil Infrastruct. Eng., 17 (6), 439-448. 10.1111/0885-9507.00005
-
(2002)
Comput. Aided Civil Infrastruct. Eng.
, vol.17
, Issue.6
, pp. 439-448
-
-
Reddy, H.R.1
Varghese, K.2
-
30
-
-
79952306376
-
Modeling weather-sensitive construction activity using simulation
-
Shahin, A., AbouRizk, S. M., and, Mohamed, Y. (2011). " Modeling weather-sensitive construction activity using simulation." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000258, 238-246.
-
(2011)
J. Constr. Eng. Manage.
, pp. 238-246
-
-
Shahin, A.1
AbouRizk, S.M.2
Mohamed, Y.3
-
31
-
-
84910627274
-
Tower crane cycle times: Case study of remote-control versus cab-control operation
-
Shapira, A., and, Elbaz, A. (2014). " Tower crane cycle times: Case study of remote-control versus cab-control operation." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000904, 5014010.
-
(2014)
J. Constr. Eng. Manage.
, pp. 5014010
-
-
Shapira, A.1
Elbaz, A.2
-
32
-
-
34547858200
-
Cranes for building construction projects
-
Shapira, A., Lucko, G., and, Schexnayder, C. J. (2007). " Cranes for building construction projects." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2007)133:9(690), 690-700.
-
(2007)
J. Constr. Eng. Manage.
, pp. 690-700
-
-
Shapira, A.1
Lucko, G.2
Schexnayder, C.J.3
-
33
-
-
42549152384
-
Vision system for tower cranes
-
Shapira, A., Rosenfeld, Y., and, Mizrahi, I. (2008). " Vision system for tower cranes." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2008)134:5(320), 320-332.
-
(2008)
J. Constr. Eng. Manage.
, pp. 320-332
-
-
Shapira, A.1
Rosenfeld, Y.2
Mizrahi, I.3
-
34
-
-
16444376810
-
Automated path planning of cooperative crane lifts using heuristic search
-
Sivakumar, P. L., Varghese, K., and, Babu, N. R. (2003). " Automated path planning of cooperative crane lifts using heuristic search." J. Comput. Civil Eng., 10.1061/(ASCE)0887-3801(2003)17:3(197), 197-207.
-
(2003)
J. Comput. Civil Eng.
, pp. 197-207
-
-
Sivakumar, P.L.1
Varghese, K.2
Babu, N.R.3
-
35
-
-
0041427756
-
Path planning in construction sites: Performance evaluation of the Dijkstra, A∗, and GA search algorithms
-
Soltani, A. R., Tawfik, H., Goulermas, J. Y., and, Fernando, T. (2002). " Path planning in construction sites: Performance evaluation of the Dijkstra, A∗, and GA search algorithms." Adv. Eng. Inf., 16 (4), 291-303.
-
(2002)
Adv. Eng. Inf.
, vol.16
, Issue.4
, pp. 291-303
-
-
Soltani, A.R.1
Tawfik, H.2
Goulermas, J.Y.3
Fernando, T.4
-
36
-
-
33747342143
-
Virtual shop model for experimental planning of steel fabrication projects
-
Song, L., and, AbouRizk, S. M. (2006). " Virtual shop model for experimental planning of steel fabrication projects." J. Comput. Civil Eng., 10.1061/(ASCE)0887-3801(2006)20:5(308), 308-316.
-
(2006)
J. Comput. Civil Eng.
, pp. 308-316
-
-
Song, L.1
AbouRizk, S.M.2
-
37
-
-
84884647057
-
Simulation-based auction protocol for resource scheduling problems
-
Taghaddos, H., AbouRizk, S., Mohamed, Y., and, Hermann, U. (2012). " Simulation-based auction protocol for resource scheduling problems." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000399, 31-42.
-
(2012)
J. Constr. Eng. Manage.
, pp. 31-42
-
-
Taghaddos, H.1
AbouRizk, S.2
Mohamed, Y.3
Hermann, U.4
-
38
-
-
84894487522
-
Simulation-based multiagent approach for scheduling modular construction
-
Taghaddos, H., Hermann, U., AbouRizk, S., and, Mohamed, Y. (2014). " Simulation-based multiagent approach for scheduling modular construction." J. Comput. Civil Eng., 10.1061/(ASCE)CP.1943-5487.0000262, 263-274.
-
(2014)
J. Comput. Civil Eng.
, pp. 263-274
-
-
Taghaddos, H.1
Hermann, U.2
AbouRizk, S.3
Mohamed, Y.4
-
39
-
-
0036165741
-
Nonlinear models for predicting hoisting times of tower cranes
-
Tam, C. M., Leung, A. W. T., and, Liu, D. K. (2002 a). " Nonlinear models for predicting hoisting times of tower cranes." J. Comput. Civil Eng., 10.1061/(ASCE)0887-3801(2002)16:1(76), 76-81.
-
(2002)
J. Comput. Civil Eng.
, pp. 76-81
-
-
Tam, C.M.1
Leung, A.W.T.2
Liu, D.K.3
-
40
-
-
0035392349
-
Genetic algorithm for optimizing supply locations around tower crane
-
Tam, C. M., Tong, C. M., Thomas, K. L., and, Chan, W. K. W. (2001). " Genetic algorithm for optimizing supply locations around tower crane." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2001)127:4(315), 315-321.
-
(2001)
J. Constr. Eng. Manage.
, pp. 315-321
-
-
Tam, C.M.1
Tong, C.M.2
Thomas, K.L.3
Chan, W.K.W.4
-
41
-
-
63649124542
-
Transformation of a 4D product and process model to generate motion of mobile cranes
-
Tantisevi, K., and, Akinci, B. (2009). " Transformation of a 4D product and process model to generate motion of mobile cranes." Autom. Constr., 18 (4), 458-468. 10.1016/j.autcon.2008.10.008
-
(2009)
Autom. Constr.
, vol.18
, Issue.4
, pp. 458-468
-
-
Tantisevi, K.1
Akinci, B.2
-
43
-
-
70349320487
-
Flow production of pipe spool fabrication: Simulation to support implementation of lean technique
-
Wang, P., Mohamed, Y., AbouRizk, S. M., and, Rawa, A. R. T. (2009). " Flow production of pipe spool fabrication: Simulation to support implementation of lean technique." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000068, 1027-1038.
-
(2009)
J. Constr. Eng. Manage.
, pp. 1027-1038
-
-
Wang, P.1
Mohamed, Y.2
AbouRizk, S.M.3
Rawa, A.R.T.4
-
44
-
-
84891388696
-
Vision-based tower crane tracking for understanding construction activity
-
Yang, J., Vela, P., Teizer, J., and, Shi, Z. (2014). " Vision-based tower crane tracking for understanding construction activity." J. Comput. Civil Eng., 10.1061/(ASCE)CP.1943-5487.0000242, 103-112.
-
(2014)
J. Comput. Civil Eng.
, pp. 103-112
-
-
Yang, J.1
Vela, P.2
Teizer, J.3
Shi, Z.4
-
45
-
-
0033101167
-
Location optimization for a group of tower cranes
-
Zhang, P., et al. (1999). " Location optimization for a group of tower cranes." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1999)125:2(115), 115-122.
-
(1999)
J. Constr. Eng. Manage.
, pp. 115-122
-
-
Zhang, P.1
|