메뉴 건너뛰기




Volumn 143, Issue 8, 2017, Pages

Erratum: Optimizing crane selection and location for multistage construction using a four-dimensional set cover approach (Journal of Construction Engineering and Management DOI: 10.1061/(ASCE)CO.1943-7862.0001318);Optimizing Crane Selection and Location for Multistage Construction Using a Four-Dimensional Set Cover Approach

Author keywords

Crane selection and location planning; Multistage construction projects; Project planning and design; Set cover problem

Indexed keywords

LOCATION;

EID: 85018191465     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0001474     Document Type: Erratum
Times cited : (32)

References (20)
  • 1
    • 33746350454 scopus 로고    scopus 로고
    • Integrating 3D visualization and simulation for tower crane operations on construction sites
    • Al-Hussein, M., Athar Niaz, M., Yu, H., and, Kim, H. (2006). " Integrating 3D visualization and simulation for tower crane operations on construction sites." Autom. Constr., 15 (5), 554-562. 10.1016/j.autcon.2005.07.007
    • (2006) Autom. Constr. , vol.15 , Issue.5 , pp. 554-562
    • Al-Hussein, M.1    Athar Niaz, M.2    Yu, H.3    Kim, H.4
  • 2
    • 85018178371 scopus 로고    scopus 로고
    • Autodesk Revit [Computer software]. Autodesk, Inc. San Rafael, CA
    • Autodesk Revit [Computer software]. Autodesk, Inc., San Rafael, CA.
  • 4
    • 78649324741 scopus 로고
    • A model for the selection of the optimum crane for construction sites
    • Furusaka, S., and, Gray, C. (1984). " A model for the selection of the optimum crane for construction sites." Constr. Manage. Econ., 2 (2), 157-176. 10.1080/01446198400000015
    • (1984) Constr. Manage. Econ. , vol.2 , Issue.2 , pp. 157-176
    • Furusaka, S.1    Gray, C.2
  • 5
    • 0000096763 scopus 로고
    • A systematic approach to the selection of an appropriate crane for a construction site
    • Gray, C., and, Little, J. (1985). " A systematic approach to the selection of an appropriate crane for a construction site." Constr. Manage. Econ., 3 (2), 121-144. 10.1080/01446198500000010
    • (1985) Constr. Manage. Econ. , vol.3 , Issue.2 , pp. 121-144
    • Gray, C.1    Little, J.2
  • 6
    • 85018172908 scopus 로고    scopus 로고
    • Gurobi Optimizer version 6.5 [Computer software]. Gurobi Optimization, Inc. Houston
    • Gurobi Optimizer version 6.5 [Computer software]. Gurobi Optimization, Inc., Houston.
  • 7
    • 79957509563 scopus 로고    scopus 로고
    • Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming
    • Huang, C., Wong, C. K., and, Tam, C. M. (2011). " Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming." Autom. Constr., 20 (5), 571-580. 10.1016/j.autcon.2010.11.023
    • (2011) Autom. Constr. , vol.20 , Issue.5 , pp. 571-580
    • Huang, C.1    Wong, C.K.2    Tam, C.M.3
  • 8
    • 84867859668 scopus 로고    scopus 로고
    • Optimizing location of tower cranes on construction sites through GIS and BIM integration
    • Irizarry, J., and, Karan, E. P. (2012). " Optimizing location of tower cranes on construction sites through GIS and BIM integration." Electron. J. Inf. Technol. Constr., 17, 351-366. ELTNBK 0013-4759
    • (2012) Electron. J. Inf. Technol. Constr. , vol.17 , pp. 351-366
    • Irizarry, J.1    Karan, E.P.2
  • 9
    • 84901259328 scopus 로고    scopus 로고
    • Particle bee algorithm for tower crane layout with material quantity supply and demand optimization
    • Lien, L. C., and, Cheng, M. Y. (2014). " Particle bee algorithm for tower crane layout with material quantity supply and demand optimization." Autom. Constr., 45, 25-32. 10.1016/j.autcon.2014.05.002
    • (2014) Autom. Constr. , vol.45 , pp. 25-32
    • Lien, L.C.1    Cheng, M.Y.2
  • 10
    • 84949544141 scopus 로고    scopus 로고
    • Decision support for tower crane selection with building information models and genetic algorithms
    • Marzouk, M., and, Abubakr, A. (2016). " Decision support for tower crane selection with building information models and genetic algorithms." Autom. Constr., 61, 1-15. 10.1016/j.autcon.2015.09.008
    • (2016) Autom. Constr. , vol.61 , pp. 1-15
    • Marzouk, M.1    Abubakr, A.2
  • 11
    • 62549085613 scopus 로고    scopus 로고
    • Identification and analysis of factors affecting safety on construction sites with tower cranes
    • Shapira, A., and, Simcha, M. (2009). " Identification and analysis of factors affecting safety on construction sites with tower cranes." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2009)135:4(307), 307-318.
    • (2009) J. Constr. Eng. Manage. , pp. 307-318
    • Shapira, A.1    Simcha, M.2
  • 12
    • 84869460618 scopus 로고    scopus 로고
    • Integrative model for quantitative evaluation of safety on construction sites with tower cranes
    • Shapira, A., Simcha, M., and, Goldenberg, M. (2012). " Integrative model for quantitative evaluation of safety on construction sites with tower cranes." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000537, 1281-1293.
    • (2012) J. Constr. Eng. Manage. , pp. 1281-1293
    • Shapira, A.1    Simcha, M.2    Goldenberg, M.3
  • 13
    • 0037647504 scopus 로고    scopus 로고
    • GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction
    • Tam, C. M., and, Tong, T. K. L. (2003). " GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction." Constr. Manage. Econ., 21 (3), 257-266. 10.1080/0144619032000049665
    • (2003) Constr. Manage. Econ. , vol.21 , Issue.3 , pp. 257-266
    • Tam, C.M.1    Tong, T.K.L.2
  • 14
    • 0035392349 scopus 로고    scopus 로고
    • Genetic algorithm for optimizing supply locations around tower crane
    • Tam, C. M., Tong, T. K. L., and, Chan, W. K. W. (2001). " Genetic algorithm for optimizing supply locations around tower crane." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2001)127:4(315), 315-321.
    • (2001) J. Constr. Eng. Manage. , pp. 315-321
    • Tam, C.M.1    Tong, T.K.L.2    Chan, W.K.W.3
  • 15
    • 84944442108 scopus 로고    scopus 로고
    • A BIM-based approach for automated tower crane layout planning
    • Wang, J., et al. (2015). " A BIM-based approach for automated tower crane layout planning." Autom. Constr., 59, 168-178. 10.1016/j.autcon.2015.05.006
    • (2015) Autom. Constr. , vol.59 , pp. 168-178
    • Wang, J.1
  • 16
    • 0042106006 scopus 로고
    • Expert systems for crane selection
    • Warszawski, A. (1990). " Expert systems for crane selection." Constr. Manage. Econ., 8 (2), 179-190. 10.1080/01446199000000015
    • (1990) Constr. Manage. Econ. , vol.8 , Issue.2 , pp. 179-190
    • Warszawski, A.1
  • 17
    • 28044449162 scopus 로고    scopus 로고
    • Managing uncertainty in major equipment procurement in engineering projects
    • Yeo, K. T., and, Ning, J. H. (2006). " Managing uncertainty in major equipment procurement in engineering projects." Eur. J. Oper. Res., 171 (1), 123-134. CECED9 10.1016/j.ejor.2004.06.036
    • (2006) Eur. J. Oper. Res. , vol.171 , Issue.1 , pp. 123-134
    • Yeo, K.T.1    Ning, J.H.2
  • 19
    • 0030110489 scopus 로고    scopus 로고
    • A computer based model for optimizing the location of a single tower crane
    • Zhang, P., Harris, F., and, Olomolaiye, P. (1996). " A computer based model for optimizing the location of a single tower crane." Build. Res. Inf., 24 (2), 113-123. 10.1080/09613219608727511
    • (1996) Build. Res. Inf. , vol.24 , Issue.2 , pp. 113-123
    • Zhang, P.1    Harris, F.2    Olomolaiye, P.3
  • 20
    • 0033101167 scopus 로고    scopus 로고
    • Location optimization for a group of tower cranes
    • Zhang, P., Harris, F., Olomolaiye, P., and, Holt, G. (1999). " Location optimization for a group of tower cranes." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1999)125:2(115), 115-122.
    • (1999) J. Constr. Eng. Manage. , pp. 115-122
    • Zhang, P.1    Harris, F.2    Olomolaiye, P.3    Holt, G.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.