Integrating 3D visualization and simulation for tower crane operations on construction sites
-
Al-Hussein, M., Athar Niaz, M., Yu, H., and, Kim, H. (2006). " Integrating 3D visualization and simulation for tower crane operations on construction sites." Autom. Constr., 15 (5), 554-562. 10.1016/j.autcon.2005.07.007
-
(2006)
Autom. Constr.
, vol.15
, Issue.5
, pp. 554-562
-
-
Al-Hussein, M.1
Athar Niaz, M.2
Yu, H.3
Kim, H.4
-
2
-
-
85018178371
-
-
Autodesk Revit [Computer software]. Autodesk, Inc. San Rafael, CA
-
Autodesk Revit [Computer software]. Autodesk, Inc., San Rafael, CA.
-
-
-
-
4
-
-
78649324741
-
A model for the selection of the optimum crane for construction sites
-
Furusaka, S., and, Gray, C. (1984). " A model for the selection of the optimum crane for construction sites." Constr. Manage. Econ., 2 (2), 157-176. 10.1080/01446198400000015
-
(1984)
Constr. Manage. Econ.
, vol.2
, Issue.2
, pp. 157-176
-
-
Furusaka, S.1
Gray, C.2
-
5
-
-
0000096763
-
A systematic approach to the selection of an appropriate crane for a construction site
-
Gray, C., and, Little, J. (1985). " A systematic approach to the selection of an appropriate crane for a construction site." Constr. Manage. Econ., 3 (2), 121-144. 10.1080/01446198500000010
-
(1985)
Constr. Manage. Econ.
, vol.3
, Issue.2
, pp. 121-144
-
-
Gray, C.1
Little, J.2
-
6
-
-
85018172908
-
-
Gurobi Optimizer version 6.5 [Computer software]. Gurobi Optimization, Inc. Houston
-
Gurobi Optimizer version 6.5 [Computer software]. Gurobi Optimization, Inc., Houston.
-
-
-
-
7
-
-
79957509563
-
Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming
-
Huang, C., Wong, C. K., and, Tam, C. M. (2011). " Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming." Autom. Constr., 20 (5), 571-580. 10.1016/j.autcon.2010.11.023
-
(2011)
Autom. Constr.
, vol.20
, Issue.5
, pp. 571-580
-
-
Huang, C.1
Wong, C.K.2
Tam, C.M.3
-
8
-
-
84867859668
-
Optimizing location of tower cranes on construction sites through GIS and BIM integration
-
Irizarry, J., and, Karan, E. P. (2012). " Optimizing location of tower cranes on construction sites through GIS and BIM integration." Electron. J. Inf. Technol. Constr., 17, 351-366. ELTNBK 0013-4759
-
(2012)
Electron. J. Inf. Technol. Constr.
, vol.17
, pp. 351-366
-
-
Irizarry, J.1
Karan, E.P.2
-
9
-
-
84901259328
-
Particle bee algorithm for tower crane layout with material quantity supply and demand optimization
-
Lien, L. C., and, Cheng, M. Y. (2014). " Particle bee algorithm for tower crane layout with material quantity supply and demand optimization." Autom. Constr., 45, 25-32. 10.1016/j.autcon.2014.05.002
-
(2014)
Autom. Constr.
, vol.45
, pp. 25-32
-
-
Lien, L.C.1
Cheng, M.Y.2
-
10
-
-
84949544141
-
Decision support for tower crane selection with building information models and genetic algorithms
-
Marzouk, M., and, Abubakr, A. (2016). " Decision support for tower crane selection with building information models and genetic algorithms." Autom. Constr., 61, 1-15. 10.1016/j.autcon.2015.09.008
-
(2016)
Autom. Constr.
, vol.61
, pp. 1-15
-
-
Marzouk, M.1
Abubakr, A.2
-
11
-
-
62549085613
-
Identification and analysis of factors affecting safety on construction sites with tower cranes
-
Shapira, A., and, Simcha, M. (2009). " Identification and analysis of factors affecting safety on construction sites with tower cranes." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2009)135:4(307), 307-318.
-
(2009)
J. Constr. Eng. Manage.
, pp. 307-318
-
-
Shapira, A.1
Simcha, M.2
-
12
-
-
84869460618
-
Integrative model for quantitative evaluation of safety on construction sites with tower cranes
-
Shapira, A., Simcha, M., and, Goldenberg, M. (2012). " Integrative model for quantitative evaluation of safety on construction sites with tower cranes." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000537, 1281-1293.
-
(2012)
J. Constr. Eng. Manage.
, pp. 1281-1293
-
-
Shapira, A.1
Simcha, M.2
Goldenberg, M.3
-
13
-
-
0037647504
-
GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction
-
Tam, C. M., and, Tong, T. K. L. (2003). " GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction." Constr. Manage. Econ., 21 (3), 257-266. 10.1080/0144619032000049665
-
(2003)
Constr. Manage. Econ.
, vol.21
, Issue.3
, pp. 257-266
-
-
Tam, C.M.1
Tong, T.K.L.2
-
14
-
-
0035392349
-
Genetic algorithm for optimizing supply locations around tower crane
-
Tam, C. M., Tong, T. K. L., and, Chan, W. K. W. (2001). " Genetic algorithm for optimizing supply locations around tower crane." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2001)127:4(315), 315-321.
-
(2001)
J. Constr. Eng. Manage.
, pp. 315-321
-
-
Tam, C.M.1
Tong, T.K.L.2
Chan, W.K.W.3
-
15
-
-
84944442108
-
A BIM-based approach for automated tower crane layout planning
-
Wang, J., et al. (2015). " A BIM-based approach for automated tower crane layout planning." Autom. Constr., 59, 168-178. 10.1016/j.autcon.2015.05.006
-
(2015)
Autom. Constr.
, vol.59
, pp. 168-178
-
-
Wang, J.1
-
16
-
-
0042106006
-
Expert systems for crane selection
-
Warszawski, A. (1990). " Expert systems for crane selection." Constr. Manage. Econ., 8 (2), 179-190. 10.1080/01446199000000015
-
(1990)
Constr. Manage. Econ.
, vol.8
, Issue.2
, pp. 179-190
-
-
Warszawski, A.1
-
17
-
-
28044449162
-
Managing uncertainty in major equipment procurement in engineering projects
-
Yeo, K. T., and, Ning, J. H. (2006). " Managing uncertainty in major equipment procurement in engineering projects." Eur. J. Oper. Res., 171 (1), 123-134. CECED9 10.1016/j.ejor.2004.06.036
-
(2006)
Eur. J. Oper. Res.
, vol.171
, Issue.1
, pp. 123-134
-
-
Yeo, K.T.1
Ning, J.H.2
-
18
-
-
84994257517
-
Integrating crane information models in BIM for checking the compliance of lifting plan requirements
-
Vilnius, Lithuania
-
Yeoh, J. K. W., Wong, J. H., and, Peng, L. (2016). " Integrating crane information models in BIM for checking the compliance of lifting plan requirements." 33rd Int. Symp. of Automation and Robotics in Construction, Vilnius Gediminas Technical Univ., Vilnius, Lithuania, 974-982.
-
(2016)
33rd Int. Symp. of Automation and Robotics in Construction, Vilnius Gediminas Technical Univ
, pp. 974-982
-
-
Yeoh, J.K.W.1
Wong, J.H.2
Peng, L.3
-
19
-
-
0030110489
-
A computer based model for optimizing the location of a single tower crane
-
Zhang, P., Harris, F., and, Olomolaiye, P. (1996). " A computer based model for optimizing the location of a single tower crane." Build. Res. Inf., 24 (2), 113-123. 10.1080/09613219608727511
-
(1996)
Build. Res. Inf.
, vol.24
, Issue.2
, pp. 113-123
-
-
Zhang, P.1
Harris, F.2
Olomolaiye, P.3
-
20
-
-
0033101167
-
Location optimization for a group of tower cranes
-
Zhang, P., Harris, F., Olomolaiye, P., and, Holt, G. (1999). " Location optimization for a group of tower cranes." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1999)125:2(115), 115-122.
-
(1999)
J. Constr. Eng. Manage.
, pp. 115-122
-
-
Zhang, P.1
Harris, F.2
Olomolaiye, P.3
Holt, G.4
|