메뉴 건너뛰기




Volumn 28, Issue 1, 2017, Pages 23-36

A modified particle swarm optimization algorithm to mixed-model two-sided assembly line balancing

Author keywords

Assembly line balancing; Mixed model two sided assembly lines; Particle swarm optimization

Indexed keywords

ASSEMBLY; ASSEMBLY MACHINES; EVOLUTIONARY ALGORITHMS; PARTICLE SWARM OPTIMIZATION (PSO);

EID: 85008500674     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-014-0959-7     Document Type: Article
Times cited : (137)

References (44)
  • 2
    • 84897357733 scopus 로고    scopus 로고
    • Branch-and-bound and PSO algorithms for no-wait job shop scheduling, Journal of Intelligent Manufacturing
    • AitZai, A., Benmedjdoub, B., & Boudhar, M. (2014). Branch-and-bound and PSO algorithms for no-wait job shop scheduling. Journal of Intelligent Manufacturing. doi:10.1007/s10845-014-0906-7.
    • (2014) & Boudhar, M
    • AitZai, A.1    Benmedjdoub, B.2
  • 3
    • 0020816054 scopus 로고
    • A method for assembly line balancing with more than one worker in each station
    • Akagi, F., Osaki, H., & Kikuchi, S. (1983). A method for assembly line balancing with more than one worker in each station. International Journal of Production Research, 21, 755–770.
    • (1983) International Journal of Production Research , vol.21 , pp. 755-770
    • Akagi, F.1    Osaki, H.2    Kikuchi, S.3
  • 4
    • 36849023499 scopus 로고    scopus 로고
    • Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
    • Andrés, C., Miralles, C., & Pastor, R. (2008). Balancing and scheduling tasks in assembly lines with sequence-dependent setup times. European Journal of Operational Research, 187(3), 1212–1223.
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 1212-1223
    • Andrés, C.1    Miralles, C.2    Pastor, R.3
  • 6
    • 84874540167 scopus 로고    scopus 로고
    • A taxonomy of line balancing problems and their solution approaches
    • Battaia, O., & Dolgui, A. (2013). A taxonomy of line balancing problems and their solution approaches. International Journal of Production Economics, 142, 259–277.
    • (2013) International Journal of Production Economics , vol.142 , pp. 259-277
    • Battaia, O.1    Dolgui, A.2
  • 7
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • Becker, C., & Scholl, A. (2006). A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research, 168(3), 694–715.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 8
    • 67349130287 scopus 로고    scopus 로고
    • Balancing assembly lines with variable parallel workplaces: Problem definition and effective solution procedure
    • Becker, C., & Scholl, A. (2009). Balancing assembly lines with variable parallel workplaces: Problem definition and effective solution procedure. European Journal of Operational Research, 199, 359–374.
    • (2009) European Journal of Operational Research , vol.199 , pp. 359-374
    • Becker, C.1    Scholl, A.2
  • 9
    • 84880257861 scopus 로고    scopus 로고
    • Particle swarm optimization algorithm for a vehicle routing problem with heterogeneous fleet, mixed backhauls, and time windows
    • Belmecheri, F., Prins, C., Yalaoui, F., & Amodeo, L. (2013). Particle swarm optimization algorithm for a vehicle routing problem with heterogeneous fleet, mixed backhauls, and time windows. Journal of Intelligent Manufacturing, 24(4), 775–789.
    • (2013) Journal of Intelligent Manufacturing , vol.24 , Issue.4 , pp. 775-789
    • Belmecheri, F.1    Prins, C.2    Yalaoui, F.3    Amodeo, L.4
  • 11
    • 0016027179 scopus 로고
    • Assembly line balancing with multiple statitons
    • Buxey, G. M. (1974). Assembly line balancing with multiple statitons. Management Science, 20, 1010–1021.
    • (1974) Management Science , vol.20 , pp. 1010-1021
    • Buxey, G.M.1
  • 12
    • 0024033958 scopus 로고
    • Line balancing with task learning effects
    • Chakravarty, A. K. (1988). Line balancing with task learning effects. IIE Transactions, 20, 186–193.
    • (1988) IIE Transactions , vol.20 , pp. 186-193
    • Chakravarty, A.K.1
  • 13
    • 84872421064 scopus 로고    scopus 로고
    • Performance evaluation of proposed differential evolution and particle swarm optimization algorithms for scheduling m-machine flow shops with lot streaming
    • Chakaravarthy, G. V., Marimuthu, S., & Sait, A. N. (2013). Performance evaluation of proposed differential evolution and particle swarm optimization algorithms for scheduling m-machine flow shops with lot streaming. Journal of Intelligent Manufacturing, 24(1), 175–191.
    • (2013) Journal of Intelligent Manufacturing , vol.24 , Issue.1 , pp. 175-191
    • Chakaravarthy, G.V.1    Marimuthu, S.2    Sait, A.N.3
  • 14
    • 82755197729 scopus 로고    scopus 로고
    • Multi-objective two-sided mixed-model assembly line balancing using particle swarm optimisation with negative knowledge
    • Chutima, P., & Chimklai, P. (2012). Multi-objective two-sided mixed-model assembly line balancing using particle swarm optimisation with negative knowledge. Computers and Industrial Engineering, 62, 39–55.
    • (2012) Computers and Industrial Engineering , vol.62 , pp. 39-55
    • Chutima, P.1    Chimklai, P.2
  • 15
    • 84893494470 scopus 로고    scopus 로고
    • A Pareto biogeography-based optimisation for multi-objective two-sided assembly line sequencing problems with a learning effect
    • Chutima, P., & Naruemitwong, W. (2014). A Pareto biogeography-based optimisation for multi-objective two-sided assembly line sequencing problems with a learning effect. Computers and Industrial Engineering, 69, 89–104.
    • (2014) Computers and Industrial Engineering , vol.69 , pp. 89-104
    • Chutima, P.1    Naruemitwong, W.2
  • 16
    • 0034863568 scopus 로고    scopus 로고
    • Eberhart, R. C., & Shi, Y. (2001). Particle swarm optimization: developments, applications and resources. In Proceedings of the 2001 Congress on Evolutionary Computation, 2001 (Vol. 1, pp. 81–86). IEEE
    • Eberhart, R. C., & Shi, Y. (2001). Particle swarm optimization: developments, applications and resources. In Proceedings of the 2001 Congress on Evolutionary Computation, 2001 (Vol. 1, pp. 81–86). IEEE.
  • 18
    • 0001474336 scopus 로고
    • An algorithm for the line balancing problem
    • Gutjahr, A. L., & Nemhauser, G. L. (1964). An algorithm for the line balancing problem. Management Science, 11(2), 308–315.
    • (1964) Management Science , vol.11 , Issue.2 , pp. 308-315
    • Gutjahr, A.L.1    Nemhauser, G.L.2
  • 19
    • 0029535737 scopus 로고    scopus 로고
    • Kennedy, J., & Eberhart, R. C. (1995). Particle swarm optimization. In Proceedings of the IEEE international joint conference on neural networks (pp. 1942–1948). IEEE Press
    • Kennedy, J., & Eberhart, R. C. (1995). Particle swarm optimization. In Proceedings of the IEEE international joint conference on neural networks (pp. 1942–1948). IEEE Press.
  • 22
    • 0033993174 scopus 로고    scopus 로고
    • Two-sided assembly line balancing: A genetic algorithm approach
    • Kim, Y. K., Kim, Y., & Kim, Y. J. (2000). Two-sided assembly line balancing: A genetic algorithm approach. Production Planning and Control, 11(1), 44–53.
    • (2000) Production Planning and Control , vol.11 , Issue.1 , pp. 44-53
    • Kim, Y.K.1    Kim, Y.2    Kim, Y.J.3
  • 23
    • 0035399914 scopus 로고    scopus 로고
    • Two-sided assembly line balancing to maximize work relatedness and slackness
    • Lee, T. O., Kim, Y., & Kim, Y. K. (2001). Two-sided assembly line balancing to maximize work relatedness and slackness. Computers and Industrial Engineering, 40, 273–292.
    • (2001) Computers and Industrial Engineering , vol.40 , pp. 273-292
    • Lee, T.O.1    Kim, Y.2    Kim, Y.K.3
  • 24
    • 18444389480 scopus 로고    scopus 로고
    • Improved particle swarm optimization combined with chaos
    • Liu, B., Wang, L., Jin, Y. H., Tang, F., & Huang, D. X. (2005). Improved particle swarm optimization combined with chaos. Chaos, Solitons & Fractals, 25(5), 1261–1271.
    • (2005) Chaos, Solitons & Fractals , vol.25 , Issue.5 , pp. 1261-1271
    • Liu, B.1    Wang, L.2    Jin, Y.H.3    Tang, F.4    Huang, D.X.5
  • 25
    • 84929523238 scopus 로고    scopus 로고
    • Hybrid particle swarm optimization and differential evolution algorithm for bi-level programming problem and its application to pricing and lot-sizing decisions, Journal of Intelligent Manufacturing
    • Ma, W., Wang, M., & Zhu, X. (2013). Hybrid particle swarm optimization and differential evolution algorithm for bi-level programming problem and its application to pricing and lot-sizing decisions. Journal of Intelligent Manufacturing. doi:10.1007/s10845-013-0803-5.
    • (2013) & Zhu, X
    • Ma, W.1    Wang, M.2
  • 26
    • 0015483845 scopus 로고
    • Production-line balances for mixed model lines
    • Macaskill, J. L. C. (1972). Production-line balances for mixed model lines. Management Science, 19, 423–434.
    • (1972) Management Science , vol.19 , pp. 423-434
    • Macaskill, J.L.C.1
  • 28
    • 0028531312 scopus 로고
    • The U-line line balancing problem
    • Miltenburg, J., & Wijngaard, J. (1994). The U-line line balancing problem. Management Science, 40, 1378–1388.
    • (1994) Management Science , vol.40 , pp. 1378-1388
    • Miltenburg, J.1    Wijngaard, J.2
  • 29
    • 50149086082 scopus 로고    scopus 로고
    • Solving shortest path problem using particle swarm optimization
    • Mohemmed, A. W., Sahoo, N. C., & Geok, T. K. (2008). Solving shortest path problem using particle swarm optimization. Applied Soft Computing, 8(4), 1643–1653.
    • (2008) Applied Soft Computing , vol.8 , Issue.4 , pp. 1643-1653
    • Mohemmed, A.W.1    Sahoo, N.C.2    Geok, T.K.3
  • 30
    • 0002569892 scopus 로고
    • A heuristic method of assembly line balancing for assumptions of constant or variable work element times
    • Moodie, C. L., & Young, H. H. (1965). A heuristic method of assembly line balancing for assumptions of constant or variable work element times. Journal of Industrial Engineering, 16, 23–29.
    • (1965) Journal of Industrial Engineering , vol.16 , pp. 23-29
    • Moodie, C.L.1    Young, H.H.2
  • 31
    • 67349117327 scopus 로고    scopus 로고
    • Balancing of mixed-model two-sided assembly lines
    • Özcan, U., & Toklu, B. (2009). Balancing of mixed-model two-sided assembly lines. Computers and Industrial Engineering, 57(1), 217–227.
    • (2009) Computers and Industrial Engineering , vol.57 , Issue.1 , pp. 217-227
    • Özcan, U.1    Toklu, B.2
  • 33
    • 84901472747 scopus 로고    scopus 로고
    • An AIS-based hybrid algorithm for static job shop scheduling problem
    • Qiu, X., & Lau, H. Y. K. (2014). An AIS-based hybrid algorithm for static job shop scheduling problem. Journal of Intelligent Manufacturing, 25(3), 489–503.
    • (2014) Journal of Intelligent Manufacturing , vol.25 , Issue.3 , pp. 489-503
    • Qiu, X.1    Lau, H.Y.K.2
  • 34
    • 3142768423 scopus 로고    scopus 로고
    • Self-organizing hierarchical particle swarm optimizer with time-varying acceleration coefficients
    • Ratnaweera, A., Halgamuge, S., & Watson, H. C. (2004). Self-organizing hierarchical particle swarm optimizer with time-varying acceleration coefficients. IEEE Transactions on Evolutionary Computation, 8(3), 240–255.
    • (2004) IEEE Transactions on Evolutionary Computation , vol.8 , Issue.3 , pp. 240-255
    • Ratnaweera, A.1    Halgamuge, S.2    Watson, H.C.3
  • 36
    • 43449085514 scopus 로고    scopus 로고
    • The sequence-dependent assembly line balancing problem
    • Scholl, A., Boysen, N., & Fliedner, M. (2008). The sequence-dependent assembly line balancing problem. OR Spectrum, 30(3), 579–609.
    • (2008) OR Spectrum , vol.30 , Issue.3 , pp. 579-609
    • Scholl, A.1    Boysen, N.2    Fliedner, M.3
  • 37
    • 0031700696 scopus 로고    scopus 로고
    • A modified particle swarm optimizer. In Proceedings of the IEEE Congress on Evolutionary Computation
    • Shi, Y., & Eberhart, R. C. (1998). A modified particle swarm optimizer. In Proceedings of the IEEE Congress on Evolutionary Computation, USA (pp. 69–73).
    • (1998) USA , pp. 69-73
    • Shi, Y.1    Eberhart, R.C.2
  • 38
    • 84896721435 scopus 로고    scopus 로고
    • Shi, Y., & Eberhart, R. C. (1999). Empirical study of particle swarm optimization. In Proceedings of the IEEE Congress on Evolutionary Computation (pp. 1945–1950). IEEE Press
    • Shi, Y., & Eberhart, R. C. (1999). Empirical study of particle swarm optimization. In Proceedings of the IEEE Congress on Evolutionary Computation (pp. 1945–1950). IEEE Press.
  • 39
    • 0021392913 scopus 로고
    • The effect of incompletion cost on line balancing with multiple manning of work stations
    • Shtub, A. (1984). The effect of incompletion cost on line balancing with multiple manning of work stations. International Journal of Production Research, 22, 235–245.
    • (1984) International Journal of Production Research , vol.22 , pp. 235-245
    • Shtub, A.1
  • 40
    • 59349112769 scopus 로고    scopus 로고
    • 2-ANTBAL: An ant colony optimisation algorithm for balancing two-sided assembly lines
    • Simaria, A. S., & Vilarinho, P. M. (2009). 2-ANTBAL: An ant colony optimisation algorithm for balancing two-sided assembly lines. Computers and Industrial Engineering, 56(2), 489–506.
    • (2009) Computers and Industrial Engineering , vol.56 , Issue.2 , pp. 489-506
    • Simaria, A.S.1    Vilarinho, P.M.2
  • 42
    • 0000566084 scopus 로고
    • Mixed model line balancing with smoothed station assignments
    • Thomopoulos, N. T. (1970). Mixed model line balancing with smoothed station assignments. Management Science, 16, 593–603.
    • (1970) Management Science , vol.16 , pp. 593-603
    • Thomopoulos, N.T.1
  • 43
    • 79956067683 scopus 로고    scopus 로고
    • Development of a fuzzy goal programming model for optimization of lead time and cost in an overlapped product development project using a Gaussian adaptive particle swarm optimization-based approach
    • Tyagi, S. K., Yang, K., Tyagi, A., & Dwivedi, S. N. (2011). Development of a fuzzy goal programming model for optimization of lead time and cost in an overlapped product development project using a Gaussian adaptive particle swarm optimization-based approach. Engineering Applications of Artificial Intelligence, 24(5), 866–879.
    • (2011) Engineering Applications of Artificial Intelligence , vol.24 , Issue.5 , pp. 866-879
    • Tyagi, S.K.1    Yang, K.2    Tyagi, A.3    Dwivedi, S.N.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.