메뉴 건너뛰기




Volumn 8, Issue 1, 2001, Pages 31-45

Using an adaptive genetic algorithm to improve construction finance decisions

Author keywords

Adaptive genetic algorithm; Cash flow

Indexed keywords


EID: 84993083596     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/eb021168     Document Type: Review
Times cited : (10)

References (32)
  • 8
    • 0032642926 scopus 로고    scopus 로고
    • Optimisation of resources allocation and levelling using genetic algorithms
    • Hegazy, T. (1999) Optimisation of resources allocation and levelling using genetic algorithms. Journal of Construction Engineering and Management, 125, 167–175
    • (1999) Journal of Construction Engineering and Management , vol.125 , pp. 167-175
    • Hegazy, T.1
  • 13
  • 14
    • 0033312040 scopus 로고    scopus 로고
    • GA-based multicriteria optimal model for construction scheduling
    • Leu, S. & Yang, C. (1999) GA-based multicriteria optimal model for construction scheduling. Journal of Construction Engineering and Management, 125, 420–427
    • (1999) Journal of Construction Engineering and Management , vol.125 , pp. 420-427
    • Leu, S.1    Yang, C.2
  • 15
    • 5244262334 scopus 로고    scopus 로고
    • Using improved algorithms to facilitate time-cost optimisation
    • Li, H. & Love, P. (1996) Using improved algorithms to facilitate time-cost optimisation. Journal of Construction Engineering and Management, 123, 233–237
    • (1996) Journal of Construction Engineering and Management , vol.123 , pp. 233-237
    • Li, H.1    Love, P.2
  • 16
    • 0000517713 scopus 로고    scopus 로고
    • Suitability of fuzzy reasoning methods
    • Li, Z.Q. (1999) Suitability of fuzzy reasoning methods. Fuzzy Sets and Systems, 108, 299–311
    • (1999) Fuzzy Sets and Systems , vol.108 , pp. 299-311
    • Li, Z.Q.1
  • 18
    • 0030567137 scopus 로고    scopus 로고
    • Improved genetic algorithm for the design of stiffened composite panels
    • Nagendra, S., Jestin, D., Haftka, R.T. & Waston, L.T. (1996) Improved genetic algorithm for the design of stiffened composite panels. Computers and Structure, 58, 543–555
    • (1996) Computers and Structure , vol.58 , pp. 543-555
    • Nagendra, S.1    Jestin, D.2    Haftka, R.T.3    Waston, L.T.4
  • 19
    • 0030618869 scopus 로고    scopus 로고
    • Operating rules for multi-reservoir systems
    • Oliveira, R. & Loucks, D.P. (1997) Operating rules for multi-reservoir systems. Water Resources Research, 33, 839–852
    • (1997) Water Resources Research , vol.33 , pp. 839-852
    • Oliveira, R.1    Loucks, D.P.2
  • 20
    • 0001930736 scopus 로고    scopus 로고
    • Adaptation in genetic algorithms
    • (eds S.K Pal & P.P. Wang) CRC Press, Boca Raton, FL
    • Patanik, L.M. & Mandavali, S. (1996) Adaptation in genetic algorithms. In: Genetic Algorithms for Pattern Recognition (eds S.K Pal & P.P. Wang), pp. 46–54. CRC Press, Boca Raton, FL
    • (1996) Genetic Algorithms for Pattern Recognition , pp. 46-54
    • Patanik, L.M.1    Mandavali, S.2
  • 22
    • 0032633457 scopus 로고    scopus 로고
    • Multi-heuristic approach for resource levelling problem in construction engineering: hybrid approach
    • Son, J. & Skibniewski, M.J. (1999) Multi-heuristic approach for resource levelling problem in construction engineering: hybrid approach. Journal of Construction Engineering and Management, 125, 23–31
    • (1999) Journal of Construction Engineering and Management , vol.125 , pp. 23-31
    • Son, J.1    Skibniewski, M.J.2
  • 26
    • 0015558134 scopus 로고
    • Outline of a new approach to the analysis of complex systems and decision processes
    • Zadeh, L.A. (1973) Outline of a new approach to the analysis of complex systems and decision processes. IEEE Transactions System, Alan and Cybernetics, 3, 28–44
    • (1973) IEEE Transactions System, Alan and Cybernetics , vol.3 , pp. 28-44
    • Zadeh, L.A.1
  • 28
    • 84993028507 scopus 로고    scopus 로고
    • Application of artificial neural network to forecast construction duration of buildings at the pre-design stage
    • Bhokha, S. & Ogunlana, S.O. (1999) Application of artificial neural network to forecast construction duration of buildings at the pre-design stage. Engineering Construction and Architectural Management, 6, 133–144
    • (1999) Engineering Construction and Architectural Management , vol.6 , pp. 133-144
    • Bhokha, S.1    Ogunlana, S.O.2
  • 30
    • 84992931720 scopus 로고    scopus 로고
    • Neural network model for multiobjective linear programming
    • in Chinese
    • Hu, T.S. (1998) Neural network model for multiobjective linear programming. ACTA Electronica Sinica, 26, 53–56 (in Chinese)
    • (1998) ACTA Electronica Sinica , vol.26 , pp. 53-56
    • Hu, T.S.1
  • 31
    • 84948486781 scopus 로고
    • Construction project control under resources constraints by fuzzy linear programming
    • Lam, K.C., So, A.T.P. & Wong, K.C. (1994) Construction project control under resources constraints by fuzzy linear programming. Building Research and Information, 22, 319–324
    • (1994) Building Research and Information , vol.22 , pp. 319-324
    • Lam, K.C.1    So, A.T.P.2    Wong, K.C.3
  • 32
    • 0030232836 scopus 로고    scopus 로고
    • Using discounted cash flow heuristics to improve project net present value
    • Pinder, J.P. & Marucheck, A.S. (1996) Using discounted cash flow heuristics to improve project net present value. Journal of Operation Management, 14, 229–240
    • (1996) Journal of Operation Management , vol.14 , pp. 229-240
    • Pinder, J.P.1    Marucheck, A.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.