-
1
-
-
0004099797
-
Using Method Models to Generate 4D Production Models
-
Civil and Environmental Engineering Department, Stanford University, CA, USA
-
Aalami, F. (1998) Using Method Models to Generate 4D Production Models. PhD Diss. Civil and Environmental Engineering Department, Stanford University, CA, USA
-
(1998)
PhD Diss
-
-
Aalami, F.1
-
2
-
-
58849093542
-
4D Workplanner - a prototype system for automated generation of construction spaces and analysis of time-space conflicts
-
14–17 August (eds R. Fruchter, F. Pena-Mora & W.M. Kim Roddis) ASCE, Stanford University, CA, USA
-
Akinci, B. & Fischer, M. (2000) 4D Workplanner - a prototype system for automated generation of construction spaces and analysis of time-space conflicts. In: Proceedings of the 8th International Conference on Computing in Civil and Building Engineering (ICCCBE-VIII), 14–17 August (eds R. Fruchter, F. Pena-Mora & W.M. Kim Roddis), pp. 740–747. ASCE, Stanford University, CA, USA
-
(2000)
Proceedings of the 8th International Conference on Computing in Civil and Building Engineering (ICCCBE-VIII)
, pp. 740-747
-
-
Akinci, B.1
Fischer, M.2
-
3
-
-
12244292489
-
Work Structuring
-
Lean Construction Institute, Ketchum, ID, USA.
-
Ballard, G. (1999) Work Structuring. White Paper-5 (unpublished). Lean Construction Institute, Ketchum, ID, USA. http://www.Ieanconstruction.org/
-
(1999)
White Paper-5 (unpublished)
-
-
Ballard, G.1
-
4
-
-
2342418087
-
Specialist contractors: a review of issues raised by their new role in building
-
Bennett, J. & Ferry, D. (1990) Specialist contractors: a review of issues raised by their new role in building. Construction Management and Economics, 8, 259–283
-
(1990)
Construction Management and Economics
, vol.8
, pp. 259-283
-
-
Bennett, J.1
Ferry, D.2
-
5
-
-
0026383750
-
Vendor analysis for best buy in construction
-
ASCE
-
Bernold, L.E. & Treseler, J.F. (1991) Vendor analysis for best buy in construction. Journal of Construction, Engineering and Management ASCE, 117, 645–658
-
(1991)
Journal of Construction, Engineering and Management
, vol.117
, pp. 645-658
-
-
Bernold, L.E.1
Treseler, J.F.2
-
6
-
-
0001927505
-
Measuring and managing technological knowledge
-
Fall
-
Bohn, R.E. (1994) Measuring and managing technological knowledge. Sloan Management Review, Fall, 61–73
-
(1994)
Sloan Management Review
, pp. 61-73
-
-
Bohn, R.E.1
-
7
-
-
0032667279
-
Workplan: constraint-based database for work package scheduling
-
ASCE
-
Choo, H.J., Tommelein, I.D., Ballard, G. & Zabelle, T.R. (1999) Workplan: constraint-based database for work package scheduling. Journal of Construction, Engineering and Management ASCE, 125, 151–160
-
(1999)
Journal of Construction, Engineering and Management
, vol.125
, pp. 151-160
-
-
Choo, H.J.1
Tommelein, I.D.2
Ballard, G.3
Zabelle, T.R.4
-
8
-
-
0004189853
-
-
Harvard Business School Press, Boston, MA, USA
-
Clark, K.B. & Fujimoto, T. (1991) Product Development Performance. Harvard Business School Press, Boston, MA, USA
-
(1991)
Product Development Performance
-
-
Clark, K.B.1
Fujimoto, T.2
-
9
-
-
0003862362
-
-
Productivity Press, Portland, OR, USA
-
Cooper, R. & Slagmulder, R. (1997) Target Costing and Value Engineering. Productivity Press, Portland, OR, USA
-
(1997)
Target Costing and Value Engineering
-
-
Cooper, R.1
Slagmulder, R.2
-
11
-
-
0348139687
-
Effective interfirm collaboration: how firms minimize transaction costs and maximize transaction value
-
Dyer, J.H. (1997) Effective interfirm collaboration: how firms minimize transaction costs and maximize transaction value. Strategic Management Journal, 18, 535–556
-
(1997)
Strategic Management Journal
, vol.18
, pp. 535-556
-
-
Dyer, J.H.1
-
12
-
-
0040885767
-
CasePlan: a Case-Based Planner and Scheduler for Construction using Product Modeling
-
Department, University of Mich-igan, Ann Arbor, MI, USA
-
Dzeng, R.J. (1995) CasePlan: a Case-Based Planner and Scheduler for Construction using Product Modeling. PhD Diss., Civil and Envir. Engrg. Department, University of Mich-igan, Ann Arbor, MI, USA
-
(1995)
PhD Diss., Civil and Envir. Engrg
-
-
Dzeng, R.J.1
-
13
-
-
0009115069
-
Boiler erection scheduling using product models and case-based reasoning
-
ASCE
-
Dzeng, R.J. & Tommelein, I.D. (1997) Boiler erection scheduling using product models and case-based reasoning. ASCE, Journal of Construction, Engineering and Management, 123, 338–347
-
(1997)
Journal of Construction, Engineering and Management
, vol.123
, pp. 338-347
-
-
Dzeng, R.J.1
Tommelein, I.D.2
-
14
-
-
84993094177
-
Mechanical sub working as prime speeds work on plant
-
April 14
-
Enr (1997) Mechanical sub working as prime speeds work on plant. Engineering News Record, April 14, 18
-
(1997)
Engineering News Record
, pp. 18
-
-
-
15
-
-
0000693991
-
Scheduling with computer-interpretable construction method models
-
ASCE
-
Fischer, M.A. & Aalami, F. (1996) Scheduling with computer-interpretable construction method models. Journal of Construction, Engineering and Management ASCE, 122, 337–347
-
(1996)
Journal of Construction, Engineering and Management
, vol.122
, pp. 337-347
-
-
Fischer, M.A.1
Aalami, F.2
-
16
-
-
0010720183
-
Representing and reasoning with design intent
-
Edinburgh, U.K
-
Ganeshan, R., Finger, S. & Garrett, J. (1991) Representing and reasoning with design intent. In: Proceedings of the First Intl. Conference on Artificial Intelligence in Design, pp. 737–755. Edinburgh, U.K
-
(1991)
Proceedings of the First Intl. Conference on Artificial Intelligence in Design
, pp. 737-755
-
-
Ganeshan, R.1
Finger, S.2
Garrett, J.3
-
18
-
-
0023440167
-
Expert system for construction planning
-
ASCE
-
Hendrickson, C., Zozaya-Gorostiza, C., Rehak, D., Baracco-Miller, E. & Lim, P. (1987) Expert system for construction planning. ASCE, J. Comp. Civ. Engrg, 1, 253–269
-
(1987)
J. Comp. Civ. Engrg
, vol.1
, pp. 253-269
-
-
Hendrickson, C.1
Zozaya-Gorostiza, C.2
Rehak, D.3
Baracco-Miller, E.4
Lim, P.5
-
20
-
-
0028454852
-
The contractor-subcontractor relationship: the subcontractor's view
-
Hinze, J. & Tracey, A. (1994) The contractor-subcontractor relationship: the subcontractor's view. Journal of Construction, Engineering and Management, 120, 274–287
-
(1994)
Journal of Construction, Engineering and Management
, vol.120
, pp. 274-287
-
-
Hinze, J.1
Tracey, A.2
-
21
-
-
3242706356
-
Design of Construction Operations
-
Lean Construction Institute, Ketchum, ID, USA.
-
Howell, G. & Ballard, G. (1999) Design of Construction Operations. White Paper-4 (unpublished). Lean Construction Institute, Ketchum, ID, USA. http://www.leanconstruc-tion.org/
-
(1999)
White Paper-4 (unpublished)
-
-
Howell, G.1
Ballard, G.2
-
22
-
-
84968082064
-
Shooting the rapids. Managing product development in turbulent environments
-
Iansiti, M. (1995) Shooting the rapids. Managing product development in turbulent environments. California Management Reviezv, 38, 37–58
-
(1995)
California Management Reviezv
, vol.38
, pp. 37-58
-
-
Iansiti, M.1
-
23
-
-
84992936595
-
-
Department of Civil and Envir. Engrg., Constr. Enrg. & Mgmt. Program, U.C. Berkeley, CA, USA. (unpublished)
-
Iskra, T., Collins, B., Yamodis, N. & Guggemos, A. (2000) Critchfield Mechanical, Inc. Project Report for CE267F: High-Tech Building and Industrial Construction. Department of Civil and Envir. Engrg., Constr. Enrg. & Mgmt. Program, U.C. Berkeley, CA, USA. (unpublished)
-
(2000)
Critchfield Mechanical, Inc. Project Report for CE267F: High-Tech Building and Industrial Construction
-
-
Iskra, T.1
Collins, B.2
Yamodis, N.3
Guggemos, A.4
-
24
-
-
0025413505
-
Intelligent planning of construction projects
-
ASCE
-
Kartam, N.A. & Levitt, R.E. (1990) Intelligent planning of construction projects. J. Comp. in Civil Engrg, ASCE, 4, 155–176
-
(1990)
J. Comp. in Civil Engrg
, vol.4
, pp. 155-176
-
-
Kartam, N.A.1
Levitt, R.E.2
-
25
-
-
84992978291
-
Concurrent engineering of facility, schedule and project organization for retrofit projects
-
(ed. S. Mohamed) CPR-97, School of Engrg., Griffith University, Queensland, Australia
-
Kim, J., Fischer, M., Nasrallah, W., Kunz, J. & Levitt, R. (1997) Concurrent engineering of facility, schedule and project organization for retrofit projects. In: Construction Process Re-engineering. (ed. S. Mohamed), pp. 647–658. CPR-97, School of Engrg., Griffith University, Queensland, Australia
-
(1997)
Construction Process Re-engineering
, pp. 647-658
-
-
Kim, J.1
Fischer, M.2
Nasrallah, W.3
Kunz, J.4
Levitt, R.5
-
26
-
-
0003656231
-
Application of the Neto Production Philosophy to Construction
-
CIFE, Stanford University, CA, USA
-
Koskela, L. (1992) Application of the Neto Production Philosophy to Construction. Technical Report no. 72, CIFE, Stanford University, CA, USA
-
(1992)
Technical Report no. 72
-
-
Koskela, L.1
-
27
-
-
0032624160
-
Constraint-based support for collaboration in design and construction
-
ASCE
-
Lottaz, C., Clement, D., Faltings, B. & Smith, I. (1999) Constraint-based support for collaboration in design and construction. ASCE, J. Comp. Civil Engrg, 13, 23–35
-
(1999)
J. Comp. Civil Engrg
, vol.13
, pp. 23-35
-
-
Lottaz, C.1
Clement, D.2
Faltings, B.3
Smith, I.4
-
29
-
-
84992992663
-
The knowledge-creating company
-
November-December
-
Nonaka, I. (1991) The knowledge-creating company. Harvard Business Review November-December, 96–104
-
(1991)
Harvard Business Review
, pp. 96-104
-
-
Nonaka, I.1
-
30
-
-
84951712884
-
-
National Institute of Science and Technology Policy, Science and Technology Agency, STA Fellow, PREST. University of Manchester, UK
-
Nonaka, I. & Ray, T. (1993) Knowledge Creation in Japanese Organizations: Building the Dimensions of Competitive Advantage. National Institute of Science and Technology Policy, Science and Technology Agency, STA Fellow, PREST. University of Manchester, UK
-
(1993)
Knowledge Creation in Japanese Organizations: Building the Dimensions of Competitive Advantage
-
-
Nonaka, I.1
Ray, T.2
-
31
-
-
0001849920
-
Communication and governance in the building process
-
Pietrofone, R. (1997) Communication and governance in the building process. Construction Management and Economics, 15, 71–82
-
(1997)
Construction Management and Economics
, vol.15
, pp. 71-82
-
-
Pietrofone, R.1
-
32
-
-
0031629966
-
The LAST DESIGNER'S database-CAD for sourcing, procurement, and planning
-
ASCE
-
Sadonio, M., Tommelein, I.D. & Zabelle, T.R. (1998) The LAST DESIGNER'S database-CAD for sourcing, procurement, and planning. In: Proceedings of the Computing Congress ′98, ASCE, pp. 364–375
-
(1998)
Proceedings of the Computing Congress ′98
, pp. 364-375
-
-
Sadonio, M.1
Tommelein, I.D.2
Zabelle, T.R.3
-
35
-
-
0026021591
-
Sightplan experiments: alternate strategies for site layout design
-
ASCE
-
Tommelein, I.D., Levitt, R.E., Hayes-Roth, B. & Confrey, T. (1991) Sightplan experiments: alternate strategies for site layout design. ASCE, J. Comp. In Civil Engrg, 5, 42–63
-
(1991)
J. Comp. In Civil Engrg
, vol.5
, pp. 42-63
-
-
Tommelein, I.D.1
Levitt, R.E.2
Hayes-Roth, B.3
Confrey, T.4
-
36
-
-
84993090334
-
-
Department, University of California Berkeley, CA, USA
-
Tommelein, I.D. & Ballard, G. (1997) Coordinating Specialists. Technical Report no. 97–8, Constr. Engrg. & Mgmt. Program. Civil and Envir. Engrg. Department, University of California Berkeley, CA, USA
-
(1997)
Coordinating Specialists. Technical Report no. 97–8, Constr. Engrg. & Mgmt. Program. Civil and Envir. Engrg
-
-
Tommelein, I.D.1
Ballard, G.2
-
37
-
-
0032645520
-
Parade game: impact of work flow variability on trade performance
-
ASCE
-
Tommelein, I.D., Riley, D. & Howell, G.A. (1999) Parade game: impact of work flow variability on trade performance. ASCE, Journal of Construction Engineering and Management, 125, 304–310
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.2
Howell, G.A.3
-
38
-
-
69949094691
-
Case study for work structuring: installation of metal door frames
-
Brighton, UK. Available at
-
Tsao, C.C.Y., Tommelein, I.D., Swanlund, E. & Howell, G.A. (2000) Case study for work structuring: installation of metal door frames. In: Proceedings of the 8th Annual Conference International Group for Lean Construction, IGLC-8, Brighton, UK. Available at http://www.ce.berkeley.edu/-tommelein/IGLC8-TsaoEtAl.pdf
-
(2000)
Proceedings of the 8th Annual Conference International Group for Lean Construction, IGLC-8
-
-
Tsao, C.C.Y.1
Tommelein, I.D.2
Swanlund, E.3
Howell, G.A.4
-
39
-
-
69949094691
-
Case study for work structuring: Installation of metal Door Frames
-
17–19 July, Brighton, UK
-
Tsao, C.C.Y., Tommelein, I.D., Swanlund, E. & Howell, G.A. (2000). Case study for work structuring: Installation of metal Door Frames. In: Proceedings of the Eigth Annual Conference of the International Group for Lean Construction. 17–19 July, Brighton, UK
-
(2000)
Proceedings of the Eigth Annual Conference of the International Group for Lean Construction
-
-
Tsao, C.C.Y.1
Tommelein, I.D.2
Swanlund, E.3
Howell, G.A.4
-
40
-
-
0002533915
-
The second Toyota paradox
-
Sloan Management Review, Spring
-
Ward, A., Liker, J.K., Cristiano, J.J. & Sobek II, D.K. (1995) The second Toyota paradox. How delaying decisions can make better cars faster. Sloan Management Review, Spring, 43–61
-
(1995)
How delaying decisions can make better cars faster
, pp. 43-61
-
-
Ward, A.1
Liker, J.K.2
Cristiano, J.J.3
Sobek, D.K.4
-
42
-
-
84993100407
-
-
Harper Collins, New York, NY
-
Womack, J.P., Jones, D.T. & Roos, D. (1990) The Machine that Changed the World. Harper Collins, New York, NY
-
(1990)
The Machine that Changed the World
-
-
Womack, J.P.1
Jones, D.T.2
Roos, D.3
|