메뉴 건너뛰기




Volumn 28, Issue 6, 2015, Pages 664-678

A credibility-constrained programming for reliable forward-reverse logistics network design under uncertainty and facility disruptions

Author keywords

credibility constrained programming; facility disruptions; integrated forward reverse logistics; network design; reliability

Indexed keywords

COMPUTER PROGRAMMING; RELIABILITY; UNCERTAINTY ANALYSIS;

EID: 84988241474     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/0951192X.2014.900863     Document Type: Article
Times cited : (49)

References (58)
  • 1
    • 79551650944 scopus 로고    scopus 로고
    • Quantitative models for inventory and production planning in closed-loop supply Chains
    • Akçali{dotless}, E., and S. Çetinkaya. 2011. "Quantitative Models for Inventory and Production Planning in Closed-Loop Supply Chains." International Journal of Production Research 49: 2373-2407. doi:10.1080/00207541003692021.
    • (2011) International Journal of Production Research , vol.49 , pp. 2373-2407
    • Akçali, E.1    Çetinkaya, S.2
  • 2
    • 84886724036 scopus 로고    scopus 로고
    • Strategies for protecting supply Chain networks against facility and transportation disruptions: An improved benders decomposition approach
    • Azad, N., G. K. D. Saharidis, H. Davoudpour, H. Malekly, and S. A. Yektamaram. 2013. "Strategies for Protecting Supply Chain Networks Against Facility and Transportation Disruptions: An Improved Benders Decomposition Approach." Annals of Operations Research 210: 125-163. doi:10.1007/s10479-012-1146-x.
    • (2013) Annals of Operations Research , vol.210 , pp. 125-163
    • Azad, N.1    Saharidis, G.K.D.2    Davoudpour, H.3    Malekly, H.4    Yektamaram, S.A.5
  • 3
    • 34247543614 scopus 로고    scopus 로고
    • Facility reliability issues in network p-median problems: Strategic centralization and Co-location effects
    • Berman, O., D. Krass, and M. Menezes. 2007. "Facility Reliability Issues in Network p-Median Problems: Strategic Centralization and Co-location Effects." Operations Research 55: 332-350. doi:10.1287/opre.1060.0348.
    • (2007) Operations Research , vol.55 , pp. 332-350
    • Berman, O.1    Krass, D.2    Menezes, M.3
  • 5
    • 34547673287 scopus 로고    scopus 로고
    • The importance of decoupling recurrent and disruption risks in a supply Chain
    • Chopra, S., G. Reinhardt, and U. Mohan. 2007. "The Importance of Decoupling Recurrent and Disruption Risks in a Supply Chain." Naval Research Logistics 54: 544-555. doi:10.1002/nav.20228.
    • (2007) Naval Research Logistics , vol.54 , pp. 544-555
    • Chopra, S.1    Reinhardt, G.2    Mohan, U.3
  • 6
    • 9344261775 scopus 로고    scopus 로고
    • Managing risk to avoid supply Chain breakdown
    • Chopra, S., and M. S. Sodhi. 2004. "Managing Risk to Avoid Supply Chain Breakdown." MIT Sloan Management Review 46: 53-61.
    • (2004) MIT Sloan Management Review , vol.46 , pp. 53-61
    • Chopra, S.1    Sodhi, M.S.2
  • 7
    • 80051943591 scopus 로고    scopus 로고
    • Quake disrupts key supply Chains
    • March 12
    • Clark, D., and Y. Takahashi. 2011. "Quake Disrupts Key Supply Chains." The Wall Street Journal Asia, March 12. http://article.wn.com/view/2011/03/12/Quake-Disrupts-Key-Supply-Chains/
    • (2011) The Wall Street Journal Asia
    • Clark, D.1    Takahashi, Y.2
  • 8
    • 77955879952 scopus 로고    scopus 로고
    • Reliable facility location design under the risk of disruptions
    • Cui, T., Y. Ouyang, and Z. J. M. Shen. 2010. "Reliable Facility Location Design under the Risk of Disruptions." Operations Research 58: 998-1011. doi:10.1287/opre.1090.0801.
    • (2010) Operations Research , vol.58 , pp. 998-1011
    • Cui, T.1    Ouyang, Y.2    Shen, Z.J.M.3
  • 9
    • 56749105185 scopus 로고    scopus 로고
    • Stochastic multi-objective production-distribution network design using simulation based optimization
    • Ding, H., L. Benyoucef, and X. Xie. 2009. "Stochastic Multi-Objective Production-Distribution Network Design Using Simulation Based Optimization." International Journal of Production Research 47: 479-505. doi:10.1080/00207540802426540.
    • (2009) International Journal of Production Research , vol.47 , pp. 479-505
    • Ding, H.1    Benyoucef, L.2    Xie, X.3
  • 10
  • 11
    • 0023363351 scopus 로고
    • Heuristic solution methods for two location problems with unreliable facilities
    • Drezner, Z. 1987. "Heuristic Solution Methods for Two Location Problems with Unreliable Facilities." The Journal of the Operational Research Society 38: 509-514.
    • (1987) The Journal of the Operational Research Society , vol.38 , pp. 509-514
    • Drezner, Z.1
  • 12
    • 77956931319 scopus 로고    scopus 로고
    • A closed-loop supply Chain network design problem with integrated forward and reverse channel decisions
    • Easwaran, G., and H. Üster. 2010. "A Closed-Loop Supply Chain Network Design Problem with Integrated Forward and Reverse Channel Decisions." IIE Transactions 42: 779-792. doi:10.1080/0740817X.2010.504689.
    • (2010) IIE Transactions , vol.42 , pp. 779-792
    • Easwaran, G.1    Üster, H.2
  • 13
    • 77949486920 scopus 로고    scopus 로고
    • A stochastic model for forward-reverse logistics network design under risk
    • El-Sayed, M., N. Afia, and A. El-Kharbotly. 2010. "A Stochastic Model for Forward-Reverse Logistics Network Design under Risk." Computers & Industrial Engineering 58: 423-431. doi:10.1016/j.cie.2008.09.040.
    • (2010) Computers & Industrial Engineering , vol.58 , pp. 423-431
    • El-Sayed, M.1    Afia, N.2    El-Kharbotly, A.3
  • 14
    • 84884834587 scopus 로고    scopus 로고
    • An interactive possibilistic programming approach for a multi-objective closed-loop supply Chain network under uncertainty
    • Fallah-Tafti, A., R. Sahraeian, R. Tavakkoli-Moghaddam, and M. Moeinipour. 2014. "An Interactive Possibilistic Programming approach for a Multi-Objective Closed-Loop Supply Chain Network under Uncertainty." International Journal of Systems Science 45 (3): 283-299. doi:10.1080/00207721.2012.720296.
    • (2014) International Journal of Systems Science , vol.45 , Issue.3 , pp. 283-299
    • Fallah-Tafti, A.1    Sahraeian, R.2    Tavakkoli-Moghaddam, R.3    Moeinipour, M.4
  • 16
    • 0034394639 scopus 로고    scopus 로고
    • A characterisation of logistics networks for product recovery
    • Fleischmann, M., H. R. Krikke, R. Dekker, and S. D. P. Flapper. 2000. "A Characterisation of Logistics Networks for Product Recovery." Omega 28: 653-666. doi:10.1016/S0305-0483 (00)00022-0.
    • (2000) Omega , vol.28 , pp. 653-666
    • Fleischmann, M.1    Krikke, H.R.2    Dekker, R.3    Flapper, S.D.P.4
  • 17
    • 84865021292 scopus 로고    scopus 로고
    • Robust closed-loop supply Chain network design for perishable goods in agile manufacturing under uncertainty
    • Hasani, A., S. H. Zegordi, and E. Nikbakhsh. 2012. "Robust Closed-Loop Supply Chain Network Design for Perishable Goods in Agile Manufacturing under Uncertainty." International Journal of Production Research 50: 4649-4669. doi:10.1080/00207543.2011.625051.
    • (2012) International Journal of Production Research , vol.50 , pp. 4649-4669
    • Hasani, A.1    Zegordi, S.H.2    Nikbakhsh, E.3
  • 18
    • 0024702296 scopus 로고
    • Evaluating the impact of operating environments on MRP system nervousness
    • Ho, C. 1989. "Evaluating the Impact of Operating Environments on MRP System Nervousness." International Journal of Production Research 27: 1115-1135. doi:10.1080/00207548908942611.
    • (1989) International Journal of Production Research , vol.27 , pp. 1115-1135
    • Ho, C.1
  • 20
    • 19844381688 scopus 로고    scopus 로고
    • Managing disruption risks in supply Chains
    • Kleindorfer, P., and G. Saad. 2005. "Managing Disruption Risks in Supply Chains." Production and Operations Management 14: 53-68. doi:10.1111/j.1937-5956.2005.tb00009.x.
    • (2005) Production and Operations Management , vol.14 , pp. 53-68
    • Kleindorfer, P.1    Saad, G.2
  • 21
    • 70449527794 scopus 로고    scopus 로고
    • The design of robust value-creating supply Chain networks: A critical review
    • Klibi, W., A. Martel, and A. Guitouni. 2010. "The Design of Robust Value-Creating Supply Chain Networks: A Critical Review." European Journal of Operational Research 203: 283-293. doi:10.1016/j.ejor.2009.06.011.
    • (2010) European Journal of Operational Research , vol.203 , pp. 283-293
    • Klibi, W.1    Martel, A.2    Guitouni, A.3
  • 22
    • 0242364705 scopus 로고    scopus 로고
    • Concurrent product and closed-loop supply Chain design with an application to refrigerators
    • Krikke, H., J. Bloemhof-Ruwaard, and L. N. Van Wassenhove. 2003. "Concurrent Product and Closed-Loop Supply Chain Design with an Application to Refrigerators." International Journal of Production Research 41: 3689-3719. doi:10.1080/0020754031000120087.
    • (2003) International Journal of Production Research , vol.41 , pp. 3689-3719
    • Krikke, H.1    Bloemhof-Ruwaard, J.2    Van Wassenhove, L.N.3
  • 23
    • 0026898945 scopus 로고
    • A new approach to some possibilistic linear programming problems
    • Lai, Y. J., and C. L. Hwang. 1992. "A New Approach to some Possibilistic Linear Programming Problems." Fuzzy Sets and Systems 49: 121-133. doi:10.1016/0165-0114(92)90318-X.
    • (1992) Fuzzy Sets and Systems , vol.49 , pp. 121-133
    • Lai, Y.J.1    Hwang, C.L.2
  • 24
    • 38649091076 scopus 로고    scopus 로고
    • A heuristic approach to logistics network design for end-of-lease computer products recovery
    • Lee, D., and M. Dong. 2008. "A Heuristic Approach to Logistics Network Design for End-of-Lease Computer Products Recovery." Transportation Research Part E: Logistics and Transportation Review 44: 455-474. doi:10.1016/j. tre.2006.11.003.
    • (2008) Transportation Research Part E: Logistics and Transportation Review , vol.44 , pp. 455-474
    • Lee, D.1    Dong, M.2
  • 25
  • 27
    • 77549084109 scopus 로고    scopus 로고
    • A continuum approximation approach to reliable facility location design under correlated probabilistic disruptions
    • Li, X., and Y. Ouyang. 2010. "A Continuum Approximation Approach to Reliable Facility Location Design under Correlated Probabilistic Disruptions." Transportation Research Part B: Methodological 44: 535-548. doi:10.1016/j.trb.2009.09.004.
    • (2010) Transportation Research Part B: Methodological , vol.44 , pp. 535-548
    • Li, X.1    Ouyang, Y.2
  • 28
    • 75149122009 scopus 로고    scopus 로고
    • A facility reliability problem: Formulation, properties and algorithm
    • Lim, M., M. S. Daskin, A. Bassamboo, and S. Chopra. 2010. "A Facility Reliability Problem: Formulation, Properties and Algorithm." Naval Research Logistics 57: 58-70.
    • (2010) Naval Research Logistics , vol.57 , pp. 58-70
    • Lim, M.1    Daskin, M.S.2    Bassamboo, A.3    Chopra, S.4
  • 30
    • 60549117308 scopus 로고    scopus 로고
    • Integrated multistage logistics network design by using hybrid evolutionary algorithm
    • Lin, L., M. Gen, and X. Wang. 2009. "Integrated Multistage Logistics Network Design by using Hybrid Evolutionary Algorithm." Computers & Industrial Engineering 56: 854-873. doi:10.1016/j.cie.2008.09.037.
    • (2009) Computers & Industrial Engineering , vol.56 , pp. 854-873
    • Lin, L.1    Gen, M.2    Wang, X.3
  • 31
    • 33746978678 scopus 로고    scopus 로고
    • A generic stochastic model for supply-and-return network design
    • Listeş, O. 2007. "A Generic Stochastic Model for Supply-and-Return Network Design." Computers and Operations Research 34: 417-442. doi:10.1016/j.cor.2005.03.007.
    • (2007) Computers and Operations Research , vol.34 , pp. 417-442
    • Listeş, O.1
  • 32
    • 3943071055 scopus 로고    scopus 로고
    • A stochastic approach to a case study for product recovery network design
    • Listeş, O., and R. Dekker. 2005. "A Stochastic Approach to a Case Study for Product Recovery Network Design." European Journal of Operational Research 160: 268-287. doi:10.1016/j.ejor.2001.12.001.
    • (2005) European Journal of Operational Research , vol.160 , pp. 268-287
    • Listeş, O.1    Dekker, R.2
  • 34
    • 0036685786 scopus 로고    scopus 로고
    • Expected value of fuzzy variable and fuzzy expected value models
    • Liu, B., and Y. K. Liu. 2002. "Expected Value of Fuzzy Variable and Fuzzy Expected Value Models." IEEE Transactions on Fuzzy Systems 10: 445-450. doi:10.1109/TFUZZ.2002.800692.
    • (2002) IEEE Transactions on Fuzzy Systems , vol.10 , pp. 445-450
    • Liu, B.1    Liu, Y.K.2
  • 35
    • 51849149134 scopus 로고    scopus 로고
    • A multi-period reverse logistics optimisation model for end-of-life vehicles recovery based on EU directive
    • Mansour, S., and M. Zarei. 2008. "A Multi-Period Reverse Logistics Optimisation Model for End-of-Life Vehicles Recovery Based on EU Directive." International Journal of Computer Integrated Manufacturing 21: 764-777. doi:10.1080/09511920701685325.
    • (2008) International Journal of Computer Integrated Manufacturing , vol.21 , pp. 764-777
    • Mansour, S.1    Zarei, M.2
  • 37
    • 44049085394 scopus 로고    scopus 로고
    • Fuzzy data envelopment analysis with credibility constraints
    • edited by J. Lei, Haikou, August 24-27, IEEE Computer Society
    • Meng, M. Q., and Y. K. Liu. 2007. "Fuzzy Data Envelopment Analysis with Credibility Constraints." In Proceedings of Fourth International Conference on Fuzzy Systems and Knowledge Discovery, edited by J. Lei, Vol. 1, Haikou, August 24-27, 149-153. IEEE Computer Society.
    • (2007) Proceedings of Fourth International Conference on Fuzzy Systems and Knowledge Discovery , vol.1 , pp. 149-153
    • Meng, M.Q.1    Liu, Y.K.2
  • 38
    • 27344448554 scopus 로고    scopus 로고
    • MRP with flexible constraints: A fuzzy mathematical programming approach
    • Mula, J., R. Poler, and J. P. Garcia. 2006. "MRP with Flexible Constraints: A Fuzzy Mathematical Programming Approach." Fuzzy Sets and Systems 157: 74-97. doi:10.1016/j.fss.2005.05.045.
    • (2006) Fuzzy Sets and Systems , vol.157 , pp. 74-97
    • Mula, J.1    Poler, R.2    Garcia, J.P.3
  • 40
    • 77955419848 scopus 로고    scopus 로고
    • A stochastic optimization model for integrated Forward/Reverse logistics network design
    • Pishvaee, M. S., F. Jolai, and J. Razmi. 2009. "A Stochastic Optimization Model for Integrated Forward/Reverse Logistics Network Design." Journal of Manufacturing Systems 28: 107-114. doi:10.1016/j.jmsy.2010.05.001.
    • (2009) Journal of Manufacturing Systems , vol.28 , pp. 107-114
    • Pishvaee, M.S.1    Jolai, F.2    Razmi, J.3
  • 41
    • 77956182227 scopus 로고    scopus 로고
    • A robust optimization approach to closed-loop supply Chain network design under uncertainty
    • Pishvaee, M. S., M. Rabbani, and S. A. Torabi. 2011. "A Robust Optimization Approach to Closed-Loop Supply Chain Network Design under Uncertainty." Applied Mathematical Modelling 35: 637-649. doi:10.1016/j. apm.2010.07.013.
    • (2011) Applied Mathematical Modelling , vol.35 , pp. 637-649
    • Pishvaee, M.S.1    Rabbani, M.2    Torabi, S.A.3
  • 42
    • 84864579681 scopus 로고    scopus 로고
    • Robust possibilistic programming for socially responsible supply Chain network design: A new approach
    • Pishvaee, M. S., J. Razmi, and S. A. Torabi. 2012. "Robust Possibilistic Programming for Socially Responsible Supply Chain Network Design: A New Approach." Fuzzy Sets and Systems 206: 1-20. doi:10.1016/j.fss.2012.04.010.
    • (2012) Fuzzy Sets and Systems , vol.206 , pp. 1-20
    • Pishvaee, M.S.1    Razmi, J.2    Torabi, S.A.3
  • 43
    • 77955681026 scopus 로고    scopus 로고
    • A possibilistic programming approach for closed-loop supply Chain network design under uncertainty
    • Pishvaee, M. S., and S. A. Torabi. 2010. "A Possibilistic Programming approach for Closed-Loop Supply Chain Network Design under Uncertainty." Fuzzy Sets and Systems 161: 2668-2683. doi:10.1016/j.fss.2010.04.010.
    • (2010) Fuzzy Sets and Systems , vol.161 , pp. 2668-2683
    • Pishvaee, M.S.1    Torabi, S.A.2
  • 44
    • 84855814683 scopus 로고    scopus 로고
    • Credibility-based fuzzy mathematical programming model for green logistics design under uncertainty
    • Pishvaee, M. S., S. A. Torabi, and J. Razmi. 2012. "Credibility-Based Fuzzy Mathematical Programming Model for Green Logistics Design under Uncertainty." Computers & Industrial Engineering 62: 624-632. doi:10.1016/j.cie.2011.11.028.
    • (2012) Computers & Industrial Engineering , vol.62 , pp. 624-632
    • Pishvaee, M.S.1    Torabi, S.A.2    Razmi, J.3
  • 45
    • 58149240901 scopus 로고    scopus 로고
    • A hybrid decision tree model based on credibility theory
    • Qi, C. 2007. "A Hybrid Decision Tree Model Based on Credibility Theory." Fuzzy Information and Engineering 40: 930-939. doi:10.1007/978-3-540-71441-5-101.
    • (2007) Fuzzy Information and Engineering , vol.40 , pp. 930-939
    • Qi, C.1
  • 46
    • 77952509551 scopus 로고    scopus 로고
    • The effect of supply disruptions on supply Chain design decisions
    • Qi, L., Z.-J.M. Shen, and L. V. Snyder. 2010. "The Effect of Supply Disruptions on Supply Chain Design Decisions." Transportation Science 44: 274-289. doi:10.1287/trsc.1100.0320.
    • (2010) Transportation Science , vol.44 , pp. 274-289
    • Qi, L.1    Shen, Z.-J.M.2    Snyder, L.V.3
  • 47
    • 33846028582 scopus 로고    scopus 로고
    • An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty
    • Salema, M. I. G., A. P. Barbosa-Povoa, and A. Q. Novais. 2007. "An Optimization Model for the Design of a Capacitated Multi-Product Reverse Logistics Network with Uncertainty." European Journal of Operational Research 179: 1063-1077. doi:10.1016/j.ejor.2005.05.032.
    • (2007) European Journal of Operational Research , vol.179 , pp. 1063-1077
    • Salema, M.I.G.1    Barbosa-Povoa, A.P.2    Novais, A.Q.3
  • 48
    • 25144463125 scopus 로고    scopus 로고
    • Reliability models for facility location: The expected failure cost case
    • Snyder, L.V., and M. Daskin. 2005. "Reliability Models for Facility Location: The Expected Failure Cost Case." Transportation Science 39: 400-416. doi:10.1287/trsc.1040.0107.
    • (2005) Transportation Science , vol.39 , pp. 400-416
    • Snyder, L.V.1    Daskin, M.2
  • 49
    • 56349140172 scopus 로고    scopus 로고
    • Planning for disruptions in supply Chain networks
    • edited by H. Greenberg, Baltimore, MD: INFORMS
    • Snyder, L. V., M. Scaparra, M. Daskin, and R. Church. 2006. "Planning for Disruptions in Supply Chain Networks." In TutORials in Operations Research, edited by H. Greenberg, 234-257. Baltimore, MD: INFORMS.
    • (2006) TutORials in Operations Research , pp. 234-257
    • Snyder, L.V.1    Scaparra, M.2    Daskin, M.3    Church, R.4
  • 50
    • 85132615183 scopus 로고    scopus 로고
    • Robust strategies for mitigating supply Chain disruptions
    • Tang, C. S. 2006. "Robust Strategies for Mitigating Supply Chain Disruptions." International Journal of Logistics: Research and Applications 9 (1): 33-45. doi:10.1080/13675560500405584.
    • (2006) International Journal of Logistics: Research and Applications , vol.9 , Issue.1 , pp. 33-45
    • Tang, C.S.1
  • 51
    • 33646342992 scopus 로고    scopus 로고
    • On the value of mitigation and contingency strategies for managing supply Chain disruption risks
    • Tomlin, B. 2006. "On the Value of Mitigation and Contingency Strategies for Managing Supply Chain Disruption Risks." Management Science 52 (5): 639-657. doi:10.1287/mnsc.1060.0515.
    • (2006) Management Science , vol.52 , Issue.5 , pp. 639-657
    • Tomlin, B.1
  • 52
    • 35649000310 scopus 로고    scopus 로고
    • An interactive possibilistic programming approach for multiple objective supply Chain master planning
    • Torabi, S. A., and E. Hassini. 2008. "An Interactive Possibilistic Programming Approach for Multiple Objective Supply Chain Master Planning." Fuzzy Sets and Systems 159: 193-214. doi:10.1016/j.fss.2007.08.010.
    • (2008) Fuzzy Sets and Systems , vol.159 , pp. 193-214
    • Torabi, S.A.1    Hassini, E.2
  • 53
    • 84868669874 scopus 로고    scopus 로고
    • Fuzzy possibilistic modeling for closed loop recycling collection networks
    • Vahdani, B., J. Razmi, and R. Tavakkoli-Moghaddam. 2012. "Fuzzy Possibilistic Modeling for Closed Loop Recycling Collection Networks." Environmental Modeling and Assessment 17: 623-637. doi:10.1007/s10666-012-9313-7.
    • (2012) Environmental Modeling and Assessment , vol.17 , pp. 623-637
    • Vahdani, B.1    Razmi, J.2    Tavakkoli-Moghaddam, R.3
  • 54
    • 84872487401 scopus 로고    scopus 로고
    • Reliable design of a logistics network under uncertainty: A fuzzy possibilistic-queuing model
    • Vahdani, B., R. Tavakkoli-Moghaddam, and F. Jolai. 2013. "Reliable Design of a Logistics Network Under Uncertainty: A Fuzzy Possibilistic-Queuing Model." Applied Mathematical Modelling 37: 3254-3268. doi:10.1016/j.apm.2012.07.021.
    • (2013) Applied Mathematical Modelling , vol.37 , pp. 3254-3268
    • Vahdani, B.1    Tavakkoli-Moghaddam, R.2    Jolai, F.3
  • 55
    • 84878320783 scopus 로고    scopus 로고
    • Reliable design of a closed loop supply Chain network under uncertainty: An interval fuzzy possibilistic chance constrained model
    • Vahdani, B., R. Tavakkoli-Moghaddam, F. Jolai, and A. Baboli. 2013. "Reliable Design of a Closed Loop Supply Chain Network under Uncertainty: An Interval Fuzzy Possibilistic Chance Constrained Model." Engineering Optimization 45: 745-765. doi:10.1080/0305215X.2012.704029.
    • (2013) Engineering Optimization , vol.45 , pp. 745-765
    • Vahdani, B.1    Tavakkoli-Moghaddam, R.2    Jolai, F.3    Baboli, A.4
  • 57
    • 79953003182 scopus 로고    scopus 로고
    • Linear robust models for international logistics and inventory problems under uncertainty
    • Wu, Y. 2011. "Linear Robust Models for International Logistics and Inventory Problems under Uncertainty." International Journal of Computer Integrated Manufacturing 24: 352-364. doi:10.1080/0951192X.2011.554875.
    • (2011) International Journal of Computer Integrated Manufacturing , vol.24 , pp. 352-364
    • Wu, Y.1
  • 58
    • 84856540671 scopus 로고    scopus 로고
    • Integer fuzzy credibility constrained programming for power system management
    • Zhang, Y. M., G. H. Huang, Q. G. Lin, and H. W. Lu. 2012. "Integer Fuzzy Credibility Constrained Programming for Power System Management." Energy 38: 398-405. doi:10.1016/j.energy.2011.11.035.
    • (2012) Energy , vol.38 , pp. 398-405
    • Zhang, Y.M.1    Huang, G.H.2    Lin, Q.G.3    Lu, H.W.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.