메뉴 건너뛰기




Volumn 45, Issue 6, 2013, Pages 745-765

Reliable design of a closed loop supply chain network under uncertainty: An interval fuzzy possibilistic chance-constrained model

Author keywords

chance constrained programming; closed loop supply chain; fuzzy possibilistic; interval programming; network design; reliability

Indexed keywords

CHANCE-CONSTRAINED PROGRAMMING; CLOSED-LOOP SUPPLY CHAIN; INTERVAL PROGRAMMING; NETWORK DESIGN; POSSIBILISTIC;

EID: 84878320783     PISSN: 0305215X     EISSN: 10290273     Source Type: Journal    
DOI: 10.1080/0305215X.2012.704029     Document Type: Article
Times cited : (85)

References (43)
  • 1
    • 0025494344 scopus 로고
    • Optimization/simulation modeling for waste management capacity planning
    • Baetz, B.W., 1990. Optimization/simulation modeling for waste management capacity planning. Journal of Urban and Planning and Development, 116, 59-79.
    • (1990) Journal of Urban and Planning and Development , vol.116 , pp. 59-79
    • Baetz, B.W.1
  • 2
    • 3142647690 scopus 로고    scopus 로고
    • Supply chain network configuration for product recovery
    • Beamon, B.M., & Fernandes, C., 2004. Supply chain network configuration for product recovery. Production Planning and Control, 15 (1), 270-281.
    • (2004) Production Planning and Control , vol.15 , Issue.1 , pp. 270-281
    • Beamon, B.M.1    Fernandes, C.2
  • 3
    • 55549106432 scopus 로고    scopus 로고
    • Chance-constrained programming models for refinery short-term crude oil scheduling problem
    • Cao, C.W., Gu, X.S., & Xin, Z., 2009. Chance-constrained programming models for refinery short-term crude oil scheduling problem. Applied Mathematical Modelling, 33, 1696-707.
    • (2009) Applied Mathematical Modelling , vol.33 , pp. 1696-1707
    • Cao, C.W.1    Gu, X.S.2    Xin, Z.3
  • 4
    • 79960304591 scopus 로고    scopus 로고
    • Empowering systems analysis for solid waste management: Challenges, trends and perspectives
    • Chang, N.B., Pires, A., & Martinho, G., 2011. Empowering systems analysis for solid waste management: challenges, trends and perspectives. Critical Reviews in Environmental Science and Technology, 41 (14), 1449-1530.
    • (2011) Critical Reviews in Environmental Science and Technology , vol.41 , Issue.14 , pp. 1449-1530
    • Chang, N.B.1    Pires, A.2    Martinho, G.3
  • 5
    • 58849090090 scopus 로고    scopus 로고
    • Reverse logistics network design for the collection of end-of-life vehicles in Mexico
    • Cruz-Rivera, R., & Ertel, J., 2009. Reverse logistics network design for the collection of end-of-life vehicles in Mexico. European Journal of Operational Research, 196 (1), 930-939.
    • (2009) European Journal of Operational Research , vol.196 , Issue.1 , pp. 930-939
    • Cruz-Rivera, R.1    Ertel, J.2
  • 6
    • 36849007473 scopus 로고    scopus 로고
    • A bi-objective reverse logistics network analysis for post-sale service
    • DOI 10.1016/j.cor.2006.12.020, PII S0305054806003200
    • Du, F., & Evans, G.W., 2008. A bi-objective reverse logistics network analysis for postsale service. Computers & Operations Research, 35, 2617-2634. (Pubitemid 350235137)
    • (2008) Computers and Operations Research , vol.35 , Issue.8 , pp. 2617-2634
    • Du, F.1    Evans, G.W.2
  • 10
    • 0742306058 scopus 로고    scopus 로고
    • Integrating closed-loop supply chains and spare-parts management at IBM
    • Fleischmann, M., van Nunen, J.A.E.E., & Grave, B., 2003. Integrating closed-loop supply chains and spare-parts management at IBM. Interfaces, 33 (4), 44-56. (Pubitemid 38157301)
    • (2003) Interfaces , vol.33 , Issue.6 , pp. 44-56
    • Fleischmann, M.1    Van Nunen, J.A.E.E.2    Grave, B.3
  • 11
    • 84954829625 scopus 로고
    • A grey fuzzy linear programming approach for municipal solid waste management planning under uncertainty
    • Huang, G.H., Baetz, B.W., & Patry, G.G., 1993. A grey fuzzy linear programming approach for municipal solid waste management planning under uncertainty. Civil Engineering Systems, 10, 123-146.
    • (1993) Civil Engineering Systems , vol.10 , pp. 123-146
    • Huang, G.H.1    Baetz, B.W.2    Patry, G.G.3
  • 12
    • 33847048940 scopus 로고    scopus 로고
    • A stochastic conflict resolution model for water quality management in reservoir-river systems
    • Kerachian, R., & Karamouz, M., 2007.A stochastic conflict resolution model for water quality management in reservoir-river systems. Advances in Water Resources, 866-882.
    • (2007) Advances in Water Resources , pp. 866-882
    • Kerachian, R.1    Karamouz, M.2
  • 13
    • 70449527794 scopus 로고    scopus 로고
    • The design of robust value-creating supply chain networks: A critical review
    • Klibi, W., Martel, A., & Guitouni, A., 2010. The design of robust value-creating supply chain networks: a critical review. European Journal of Operational Research, 203, 283-293.
    • (2010) European Journal of Operational Research , vol.203 , pp. 283-293
    • Klibi, W.1    Martel, A.2    Guitouni, A.3
  • 14
    • 0026898945 scopus 로고
    • A new approach to some possibilistic linear programming problems
    • Lai, Y.J., & Hwang, C.L., 1992. A new approach to some possibilistic linear programming problems. Fuzzy Sets and Systems 49, 121-133.
    • (1992) Fuzzy Sets and Systems , vol.49 , pp. 121-133
    • Lai, Y.J.1    Hwang, C.L.2
  • 15
    • 0027559242 scopus 로고
    • Possibilistic linear programming for managing interest rate risk
    • Lai, Y.J., & Hwang, C.L., 1993. Possibilistic linear programming for managing interest rate risk. Fuzzy Sets and Systems, 54, 135-146.
    • (1993) Fuzzy Sets and Systems , vol.54 , pp. 135-146
    • Lai, Y.J.1    Hwang, C.L.2
  • 16
    • 0035998164 scopus 로고    scopus 로고
    • Aligning supply chain strategies with product uncertainties
    • Lee, H.L., 2002. Aligning supply chain strategies with product uncertainties. California Management Review, 44 (1), 105-119.
    • (2002) California Management Review , vol.44 , Issue.1 , pp. 105-119
    • Lee, H.L.1
  • 18
    • 39749119834 scopus 로고    scopus 로고
    • A two-stage fuzzy robust integer programming approach for capacity planning of environmental management systems
    • DOI 10.1016/j.ejor.2007.05.014, PII S0377221707004961
    • Li, Y.P., et al., 2008. A two-stage fuzzy robust integer programming approach for capacity planning of environmental management systems. European Journal of Operational Research, 408, 399-420. (Pubitemid 351297728)
    • (2008) European Journal of Operational Research , vol.189 , Issue.2 , pp. 399-420
    • Li, Y.P.1    Huang, G.H.2    Nie, X.H.3    Nie, S.L.4
  • 19
    • 33746986504 scopus 로고    scopus 로고
    • Reverse logistics network design with stochastic lead times
    • DOI 10.1016/j.cor.2005.03.006, PII S0305054805001012
    • Lieckens, K., & Vandaele, N., 2007. Reverse logistics network design with stochastic lead times. Computers&Operations Research, 34, 395-416. (Pubitemid 44205366)
    • (2007) Computers and Operations Research , vol.34 , Issue.2 , pp. 395-416
    • Lieckens, K.1    Vandaele, N.2
  • 20
    • 33746978678 scopus 로고    scopus 로고
    • A generic stochastic model for supply-and-return network design
    • DOI 10.1016/j.cor.2005.03.007, PII S0305054805001024
    • Listes, O., 2007. A generic stochastic model for supply-and-return network design, Computers & Operations Research, 34, 417-442. (Pubitemid 44205367)
    • (2007) Computers and Operations Research , vol.34 , Issue.2 , pp. 417-442
    • Listes, O.1
  • 21
    • 0037620639 scopus 로고    scopus 로고
    • A fuzzy-stochastic robust optimization model for regional air quality management under uncertainty
    • Liu L., et al., 2003.A fuzzy-stochastic robust optimization model for regional air quality management under uncertainty. Engineering Optimization, 35 (2), 177-199.
    • (2003) Engineering Optimization , vol.35 , Issue.2 , pp. 177-199
    • Liu, L.1
  • 22
    • 33746937113 scopus 로고    scopus 로고
    • A facility location model for logistics systems including reverse flows: The case of remanufacturing activities
    • DOI 10.1016/j.cor.2005.03.002, PII S0305054805000973
    • Lu, Z., & Bostel, N., 2007. A facility location model for logistics systems including reverse flows: the case of remanufacturing activities. Computers & Operations Research, 34, 299-323. (Pubitemid 44205362)
    • (2007) Computers and Operations Research , vol.34 , Issue.2 , pp. 299-323
    • Lu, Z.1    Bostel, N.2
  • 23
    • 41549118958 scopus 로고    scopus 로고
    • The dynamic design of a reverse logistics network from the perspective of third-party logistics service providers
    • DOI 10.1016/j.ijpe.2007.01.017, PII S0925527307002526
    • Min, H., & Ko, H.J., 2008. The dynamic design of a reverse logistics network from the perspective of third-party logistics service providers. International Journal of Production Economics, 113, 176-192. (Pubitemid 351471775)
    • (2008) International Journal of Production Economics , vol.113 , Issue.1 , pp. 176-192
    • Min, H.1    Ko, H.-J.2
  • 25
    • 71749118341 scopus 로고    scopus 로고
    • A memetic algorithm for bi-objective integrated forward/reverse logistics network design
    • Pishvaee, M.S., Farahani, R.Z., & Dullaert, W., 2010. A memetic algorithm for bi-objective integrated forward/reverse logistics network design. Computers & Operations Research, 37, 1100-1112.
    • (2010) Computers & Operations Research , vol.37 , pp. 1100-1112
    • Pishvaee, M.S.1    Farahani, R.Z.2    Dullaert, W.3
  • 26
    • 33847047430 scopus 로고    scopus 로고
    • An interval-parameter fuzzy nonlinear optimization model for stream water quality management under uncertainty
    • DOI 10.1016/j.ejor.2006.03.053, PII S037722170600350X
    • Qin, X.S., et al., 2007. An interval-parameter fuzzy nonlinear optimization model for stream water quality management under uncertainty. European Journal of Operational Research, 180 (1), 1331-1357. (Pubitemid 46275296)
    • (2007) European Journal of Operational Research , vol.180 , Issue.3 , pp. 1331-1357
    • Qin, X.S.1    Huang, G.H.2    Zeng, G.M.3    Chakma, A.4    Huang, Y.F.5
  • 27
    • 77249102207 scopus 로고    scopus 로고
    • A genetic-algorithm-aided chance-constrained programming model for regional air quality management under uncertainty
    • Qin, X.S., Huang, G.H., & Liu, L., 2010. A genetic-algorithm-aided chance-constrained programming model for regional air quality management under uncertainty. Journal of the Air & Waste Management Association, 60 (1), 63-71.
    • (2010) Journal of the Air & Waste Management Association , vol.60 , Issue.1 , pp. 63-71
    • Qin, X.S.1    Huang, G.H.2    Liu, L.3
  • 28
    • 35549011542 scopus 로고    scopus 로고
    • Fuzzy chance constrained linear programming model for optimizing the scrap charge in steel production
    • DOI 10.1016/j.ejor.2007.02.017, PII S0377221707002366
    • Rong, A.Y., & Lahdelma, R., 2008. Fuzzy chance-constrained linear programming model for optimizing the scrap charge in steel production. European Journal of Operational Research, 186, 953-964. (Pubitemid 350016641)
    • (2008) European Journal of Operational Research , vol.186 , Issue.3 , pp. 953-964
    • Rong, A.1    Lahdelma, R.2
  • 29
    • 0023175312 scopus 로고
    • Interactive fuzzy satisficing method for multiobjective linear-programming problems and its application
    • Sakawa, M., Yano, H., & Yumine, T., 1987.An interactive fuzzy satisfying method for multiobjective linear-programming problems and its application. IEEE Transactions on Systems, Man and Cybernetics, SMC-17, 654-661. (Pubitemid 17650834)
    • (1987) IEEE Transactions on Systems, Man and Cybernetics , vol.SMC-17 , Issue.4 , pp. 654-661
    • Sakawa, M.1    Yano, H.2    Yumine, T.3
  • 30
    • 39049110961 scopus 로고    scopus 로고
    • A supply chain distribution network design model: An interactive fuzzy goal programming-based solution approach
    • DOI 10.1007/s00170-006-0842-6
    • Selim, H., & Ozkarahan, I., 2008. A supply chain distribution network design model: an interactive fuzzy goal programming-based solution approach. International Journal of Advanced Manufacturing Technology, 36, 401-418. (Pubitemid 351240113)
    • (2008) International Journal of Advanced Manufacturing Technology , vol.36 , Issue.3-4 , pp. 401-418
    • Selim, H.1    Ozkarahan, I.2
  • 31
    • 16844374319 scopus 로고    scopus 로고
    • An integrated logistics operational model for green-supply chain management
    • Sheu, J.-B., Chou, Y.-H., & Hu, C.-C., 2005. An integrated logistics operational model for green-supply chain management. Transportation Research, 41, 287-313.
    • (2005) Transportation Research , vol.41 , pp. 287-313
    • Sheu, J.-B.1    Chou, Y.-H.2    Hu, C.-C.3
  • 32
    • 25144463125 scopus 로고    scopus 로고
    • Reliability models for facility location: The expected failure cost case
    • DOI 10.1287/trsc.1040.0107
    • Snyder, L.V., & Daskin, M.S., 2005. Reliability models for facility location: the expected failure cost case. Transportation Science, 39 (1), 400-416. (Pubitemid 41344665)
    • (2005) Transportation Science , vol.39 , Issue.3 , pp. 400-416
    • Snyder, L.V.1    Daskin, M.S.2
  • 33
    • 35649000310 scopus 로고    scopus 로고
    • An interactive possibilistic programming approach for multiple objective supply chain master planning
    • DOI 10.1016/j.fss.2007.08.010, PII S0165011407003739, Theme: Games and Decision
    • Torabi, S.A., & Hassini, E., 2008. An interactive possibilistic programming approach for multiple objective supply chain master planning. Fuzzy Sets and Systems, 159, 193-214. (Pubitemid 350026610)
    • (2008) Fuzzy Sets and Systems , vol.159 , Issue.2 , pp. 193-214
    • Torabi, S.A.1    Hassini, E.2
  • 34
    • 36549014721 scopus 로고    scopus 로고
    • Benders decomposition with alternative multiple cuts for a multi-product closed-loop supply chain network design model
    • DOI 10.1002/nav.20262
    • Uster, H., et al., 2007. Benders decomposition with alternative multiple cuts for a multiproduct closed-loop supply chain network design model. Naval Research Logistics, 54, 890-907. (Pubitemid 350189031)
    • (2007) Naval Research Logistics , vol.54 , Issue.8 , pp. 890-907
    • Uster, H.1    Easwaran, G.2    Akcali, E.3    Cetinkaya, S.4
  • 35
    • 84862550540 scopus 로고    scopus 로고
    • Two fuzzy possibilistic bi-objective zero-one programming models for outsourcing the equipment maintenance problem
    • Vahdani, B., et al., 2012a. Two fuzzy possibilistic bi-objective zero-one programming models for outsourcing the equipment maintenance problem. Engineering Optimization, 44, 801-820.
    • (2012) Engineering Optimization , vol.44 , pp. 801-820
    • Vahdani, B.1
  • 36
    • 84868669874 scopus 로고    scopus 로고
    • Fuzzy possibilistic modeling for closed loop recycling collection networks
    • DOI: 10.1007/s10666-012-9313-7
    • Vahdani, B., Razmi, J., & Tavakkoli-Moghaddam, 2012b. Fuzzy possibilistic modeling for closed loop recycling collection networks. Environmental Modeling and Assessment, DOI: 10.1007/s10666-012-9313-7.
    • (2012) Environmental Modeling and Assessment
    • Vahdani, B.1    Razmi, J.2    Tavakkoli-Moghaddam3
  • 37
    • 0036466750 scopus 로고    scopus 로고
    • The Tanzanian scrap recycling cycle
    • Van den Brink, J., 2002. The Tanzanian scrap recycling cycle. Technovation, 22,187-197.
    • (2002) Technovation , vol.22 , pp. 187-197
    • Van Den Brink, J.1
  • 38
    • 33750455436 scopus 로고    scopus 로고
    • A possibilistic decision model for new product supply chain design
    • Wang, J., & Shu, Y.F., 2007. A possibilistic decision model for new product supply chain design. European Journal of Operational Research, 177, 1044-1061.
    • (2007) European Journal of Operational Research , vol.177 , pp. 1044-1061
    • Wang, J.1    Shu, Y.F.2
  • 39
    • 84855487777 scopus 로고    scopus 로고
    • An interval-valued fuzzy-stochastic programming approach and its application to municipal solid waste management
    • Wang, S., Huang, G.H., & Yang, B.T., 2012. An interval-valued fuzzy-stochastic programming approach and its application to municipal solid waste management. Environmental Modelling & Software, 29, 24-36.
    • (2012) Environmental Modelling & Software , vol.29 , pp. 24-36
    • Wang, S.1    Huang, G.H.2    Yang, B.T.3
  • 40
    • 0001908470 scopus 로고
    • Aggregation models in mathematical programming
    • G. Mitra, et al., eds Berlin: Springer
    • Werners, B., 1988. Aggregation models in mathematical programming. In: G. Mitra, et al., eds. Mathematical models for decision support. Berlin: Springer, 295-305.
    • (1988) Mathematical Models for Decision Support , pp. 295-305
    • Werners, B.1
  • 41
    • 77957017795 scopus 로고    scopus 로고
    • Agricultural effluent control under uncertainty: An inexact double-sided fuzzy chanceconstrained model
    • Xu, Y., & Qin, X.S., 2010. Agricultural effluent control under uncertainty: an inexact double-sided fuzzy chanceconstrained model. Advances in Water Resources 33, 997-1014.
    • (2010) Advances in Water Resources , vol.33 , pp. 997-1014
    • Xu, Y.1    Qin, X.S.2
  • 42
    • 78650521137 scopus 로고    scopus 로고
    • An inexact reverse logistics model for municipal solid waste management systems
    • Zhang, Y.M., Huang, G.H., & He, L., 2011. An inexact reverse logistics model for municipal solid waste management systems. Journal of Environmental Management, 92, 522-530.
    • (2011) Journal of Environmental Management , vol.92 , pp. 522-530
    • Zhang, Y.M.1    Huang, G.H.2    He, L.3
  • 43
    • 49349136235 scopus 로고
    • Fuzzy programming and linear programming with several objective functions
    • Zimmermann, H.J., 1978. Fuzzy programming and linear programming with several objective functions. Fuzzy Sets and Systems, 1, 45-55.
    • (1978) Fuzzy Sets and Systems , vol.1 , pp. 45-55
    • Zimmermann, H.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.