-
1
-
-
0029369707
-
Power system planning - a reliability perspective
-
Debnath K., Goel L. Power system planning - a reliability perspective. Electric Power Systems Research 1995, 34(3):179-185.
-
(1995)
Electric Power Systems Research
, vol.34
, Issue.3
, pp. 179-185
-
-
Debnath, K.1
Goel, L.2
-
2
-
-
0030823580
-
Survey of mathematical programming models in air pollution management
-
Cooper W.W., Hemphill H., Huang Z., Li S., Lelas V., Sullivan D.W. Survey of mathematical programming models in air pollution management. European Journal of Operational Research 1997, 96(1):1-35.
-
(1997)
European Journal of Operational Research
, vol.96
, Issue.1
, pp. 1-35
-
-
Cooper, W.W.1
Hemphill, H.2
Huang, Z.3
Li, S.4
Lelas, V.5
Sullivan, D.W.6
-
3
-
-
0001281946
-
Optimization methods for electric utility resource planning
-
Hobbs B.F. Optimization methods for electric utility resource planning. European Journal of Operational Research 1995, 83(1):1-20.
-
(1995)
European Journal of Operational Research
, vol.83
, Issue.1
, pp. 1-20
-
-
Hobbs, B.F.1
-
4
-
-
79959377121
-
Market-based congestion management in electric power systems with increased share of natural gas dependent power plants
-
Milos P. Market-based congestion management in electric power systems with increased share of natural gas dependent power plants. Energy 2011, 36(7):4244-4255.
-
(2011)
Energy
, vol.36
, Issue.7
, pp. 4244-4255
-
-
Milos, P.1
-
5
-
-
45649083137
-
Economic comparison between coal-fired and liquefied natural gas combined cycle power plants considering carbon tax: Korean case
-
Jeong S.-J., Kim Y.-S., Park J.-W. Economic comparison between coal-fired and liquefied natural gas combined cycle power plants considering carbon tax: Korean case. Energy 2008, 33(8):1320-1330.
-
(2008)
Energy
, vol.33
, Issue.8
, pp. 1320-1330
-
-
Jeong, S.-J.1
Kim, Y.-S.2
Park, J.-W.3
-
6
-
-
0028588817
-
The effects of sulfur-dioxide controls on productivity change in the united-states electric-power industry
-
Yaisawarng S., Klein J.D. The effects of sulfur-dioxide controls on productivity change in the united-states electric-power industry. Review of Economics and Statistics 1994, 76(3):447-460.
-
(1994)
Review of Economics and Statistics
, vol.76
, Issue.3
, pp. 447-460
-
-
Yaisawarng, S.1
Klein, J.D.2
-
7
-
-
0027542259
-
Emissions dispatch under the underutilization provision of the 1990 united-states clean-air act amendments - models and analysis
-
Hobbs B.F. Emissions dispatch under the underutilization provision of the 1990 united-states clean-air act amendments - models and analysis. IEEE Transactions on Power Systems 1993, 8(1):177-183.
-
(1993)
IEEE Transactions on Power Systems
, vol.8
, Issue.1
, pp. 177-183
-
-
Hobbs, B.F.1
-
8
-
-
0031147456
-
Interactive search approach to emission constrained dispatch
-
Spens W.Y., Lee F.N. Interactive search approach to emission constrained dispatch. IEEE Transactions on Power Systems 1997, 12(2):811-817.
-
(1997)
IEEE Transactions on Power Systems
, vol.12
, Issue.2
, pp. 811-817
-
-
Spens, W.Y.1
Lee, F.N.2
-
9
-
-
10644268608
-
Supply- and demand-side effects of power sector planning with demand-side management options and so2 emission constraints
-
Shrestha R., Marpaung C. Supply- and demand-side effects of power sector planning with demand-side management options and so2 emission constraints. Energy 2005, 33(6):815-825.
-
(2005)
Energy
, vol.33
, Issue.6
, pp. 815-825
-
-
Shrestha, R.1
Marpaung, C.2
-
10
-
-
42649135894
-
Optimal planning of co-firing alternative fuels with coal in a power plant by grey nonlinear mixed integer programming model
-
Ko A.S., Chang N.-B. Optimal planning of co-firing alternative fuels with coal in a power plant by grey nonlinear mixed integer programming model. Journal of Environmental Management 2008, 88(1):11-27.
-
(2008)
Journal of Environmental Management
, vol.88
, Issue.1
, pp. 11-27
-
-
Ko, A.S.1
Chang, N.-B.2
-
11
-
-
77954578084
-
Fuzzy robust credibility-constrained programming for environmental management and planning
-
Zhang Y.M., Huang G.H. Fuzzy robust credibility-constrained programming for environmental management and planning. Journal of the Air & Waste Management Association 2010, 60(6):711-721.
-
(2010)
Journal of the Air & Waste Management Association
, vol.60
, Issue.6
, pp. 711-721
-
-
Zhang, Y.M.1
Huang, G.H.2
-
12
-
-
79951811002
-
Inexact credibility constrained programming for environmental system management
-
Zhang Y.M., Huang G.H. Inexact credibility constrained programming for environmental system management. Resources Conservation and Recycling 2011, 55(11):441-447.
-
(2011)
Resources Conservation and Recycling
, vol.55
, Issue.11
, pp. 441-447
-
-
Zhang, Y.M.1
Huang, G.H.2
-
13
-
-
79960783830
-
Optimal water resource planning under fixed budget by interval-parameter credibility constrained programming
-
Zhang Y.M., Huang G.H. Optimal water resource planning under fixed budget by interval-parameter credibility constrained programming. Engineering Optimization 2011, 43(8):879-889.
-
(2011)
Engineering Optimization
, vol.43
, Issue.8
, pp. 879-889
-
-
Zhang, Y.M.1
Huang, G.H.2
-
14
-
-
0036685786
-
Expected value of fuzzy variable and fuzzy expected value models
-
Liu B., Liu Y.K. Expected value of fuzzy variable and fuzzy expected value models. IEEE Transactions on Fuzzy Systems 2002, 10:445-450.
-
(2002)
IEEE Transactions on Fuzzy Systems
, vol.10
, pp. 445-450
-
-
Liu, B.1
Liu, Y.K.2
|