-
1
-
-
84855790162
-
Synchronisation of scarce resources for a parallel machine lotsizing problem
-
Almeder C, Almada-Lobo B (2011) Synchronisation of scarce resources for a parallel machine lotsizing problem. Int J Prod Res 49(24):7315–7335
-
(2011)
Int J Prod Res
, vol.49
, Issue.24
, pp. 7315-7335
-
-
Almeder, C.1
Almada-Lobo, B.2
-
2
-
-
79952577244
-
Multi-objective lot-sizing and scheduling dealing with perishability issues
-
Amorim P, Antunes CH, Almada-Lobo B (2011) Multi-objective lot-sizing and scheduling dealing with perishability issues. Ind Eng Chem Res 50(6):3371–3381
-
(2011)
Ind Eng Chem Res
, vol.50
, Issue.6
, pp. 3371-3381
-
-
Amorim, P.1
Antunes, C.H.2
Almada-Lobo, B.3
-
3
-
-
33749645859
-
Capacitated multi-item lot-sizing problems with time windows
-
Brahimi N, Dauzère-Peres S, Najid NM (2006) Capacitated multi-item lot-sizing problems with time windows. Oper Res 54(5):951–967
-
(2006)
Oper Res
, vol.54
, Issue.5
, pp. 951-967
-
-
Brahimi, N.1
Dauzère-Peres, S.2
Najid, N.M.3
-
4
-
-
77349118693
-
Dynamic capacitated lot-sizing problems: a classification and review of solution approaches
-
Buschkühl L, Sahling F, Helber S, Tempelmeier H (2010) Dynamic capacitated lot-sizing problems: a classification and review of solution approaches. OR Spectr 32(2):231–261
-
(2010)
OR Spectr
, vol.32
, Issue.2
, pp. 231-261
-
-
Buschkühl, L.1
Sahling, F.2
Helber, S.3
Tempelmeier, H.4
-
5
-
-
84896399198
-
Production lot sizing and scheduling with non-triangular sequence-dependent setup times
-
Clark A, Mahdieh M, Rangel S (2014) Production lot sizing and scheduling with non-triangular sequence-dependent setup times. Int J Prod Res 52(8):2490–2503
-
(2014)
Int J Prod Res
, vol.52
, Issue.8
, pp. 2490-2503
-
-
Clark, A.1
Mahdieh, M.2
Rangel, S.3
-
6
-
-
0034631279
-
Rolling-horizon lot-sizing when set-up times are sequence-dependent
-
Clark AR, Clark SJ (2000) Rolling-horizon lot-sizing when set-up times are sequence-dependent. Int J Prod Res 38(10):2287–2307
-
(2000)
Int J Prod Res
, vol.38
, Issue.10
, pp. 2287-2307
-
-
Clark, A.R.1
Clark, S.J.2
-
7
-
-
0028769399
-
On practical resource allocation for production planning and scheduling with period overlapping setups
-
Dillenberger C, Escudero LF, Wollensak A, Zhang W (1994) On practical resource allocation for production planning and scheduling with period overlapping setups. Eur J Oper Res 75(2):275–286
-
(1994)
Eur J Oper Res
, vol.75
, Issue.2
, pp. 275-286
-
-
Dillenberger, C.1
Escudero, L.F.2
Wollensak, A.3
Zhang, W.4
-
8
-
-
33745996298
-
Proportional lotsizing and scheduling
-
Drexl A, Haase K (1995) Proportional lotsizing and scheduling. Int J Prod Econ 40(1):73–87
-
(1995)
Int J Prod Econ
, vol.40
, Issue.1
, pp. 73-87
-
-
Drexl, A.1
Haase, K.2
-
9
-
-
0027741591
-
A decision support system for determining the flexibility and service level of a JIT production. In: Advanced in production management systems
-
Fleischmann B, Henneberg T (1993) A decision support system for determining the flexibility and service level of a JIT production. In: Advanced in production management systems, pp 349–356
-
(1993)
pp 349–356
-
-
Fleischmann, B.1
Henneberg, T.2
-
10
-
-
74149086575
-
A fix-and-optimize approach for the multi-level capacitated lot sizing problem
-
Helber S, Sahling F (2010) A fix-and-optimize approach for the multi-level capacitated lot sizing problem. Int J Prod Econ 123(2):247–256
-
(2010)
Int J Prod Econ
, vol.123
, Issue.2
, pp. 247-256
-
-
Helber, S.1
Sahling, F.2
-
11
-
-
79955056703
-
Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighborhood search heuristics
-
James RJ, Almada-Lobo B (2011) Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighborhood search heuristics. Comput Oper Res 38(12):1816–1825
-
(2011)
Comput Oper Res
, vol.38
, Issue.12
, pp. 1816-1825
-
-
James, R.J.1
Almada-Lobo, B.2
-
12
-
-
33750728882
-
Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches
-
Jans R, Degraeve Z (2007) Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches. Eur J Oper Res 177(3):1855–1875
-
(2007)
Eur J Oper Res
, vol.177
, Issue.3
, pp. 1855-1875
-
-
Jans, R.1
Degraeve, Z.2
-
13
-
-
77955925568
-
Capacitated lot sizing and sequence dependent setup scheduling: an iterative approach for integration
-
Mateus GR, Ravetti MG, de Souza MC, Valeriano TM (2010) Capacitated lot sizing and sequence dependent setup scheduling: an iterative approach for integration. J Sched 13(3):245–259
-
(2010)
J Sched
, vol.13
, Issue.3
, pp. 245-259
-
-
Mateus, G.R.1
Ravetti, M.G.2
de Souza, M.C.3
Valeriano, T.M.4
-
15
-
-
0036604813
-
Simultaneous lotsizing and scheduling on parallel machines
-
Meyr H (2002) Simultaneous lotsizing and scheduling on parallel machines. Eur J Oper Res 139(2):277–292
-
(2002)
Eur J Oper Res
, vol.139
, Issue.2
, pp. 277-292
-
-
Meyr, H.1
-
16
-
-
84902076097
-
Integrating deterioration and lifetime constraints in production and supply chain planning: a survey
-
Pahl J, Voß S (2014) Integrating deterioration and lifetime constraints in production and supply chain planning: a survey. Eur J Oper Res 238(3):654–674
-
(2014)
Eur J Oper Res
, vol.238
, Issue.3
, pp. 654-674
-
-
Pahl, J.1
Voß, S.2
-
17
-
-
39449098494
-
Capacitated lot-sizing with extensions: a review
-
Quadt D, Kuhn H (2008) Capacitated lot-sizing with extensions: a review. 4OR 6(1):61–83
-
(2008)
4OR
, vol.6
, Issue.1
, pp. 61-83
-
-
Quadt, D.1
Kuhn, H.2
-
18
-
-
0141733592
-
Multilevel lot sizing with setup times and multiple constrained resources: internally rolling schedules with lot-sizing windows
-
Stadtler H (2003) Multilevel lot sizing with setup times and multiple constrained resources: internally rolling schedules with lot-sizing windows. Oper Res 51(3):487–502
-
(2003)
Oper Res
, vol.51
, Issue.3
, pp. 487-502
-
-
Stadtler, H.1
-
19
-
-
41549111411
-
Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource
-
Tempelmeier H, Buschkühl L (2008) Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource. Int J Prod Econ 113(1):401–412
-
(2008)
Int J Prod Econ
, vol.113
, Issue.1
, pp. 401-412
-
-
Tempelmeier, H.1
Buschkühl, L.2
|