메뉴 건너뛰기




Volumn 52, Issue 8, 2014, Pages 2490-2503

Production lot sizing and scheduling with non-triangular sequence-dependent setup times

Author keywords

Lot sizing and scheduling; Non triangular setup times; Sequence dependent setup times

Indexed keywords

DECONTAMINATION; OPTIMIZATION;

EID: 84896399198     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2014.885662     Document Type: Article
Times cited : (21)

References (30)
  • 1
    • 34547145422 scopus 로고    scopus 로고
    • Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups
    • Araújo, S. A., M. N. Arenales, and A. R. Clark. 2007. "Joint Rolling-horizon Scheduling of Materials Processing and Lot-sizing with Sequence-dependent Setups." Journal of Heuristics 13 (4): 337-358
    • (2007) Journal of Heuristics , vol.13 , Issue.4 , pp. 337-358
    • Araújo, S.A.1    Arenales, M.N.2    Clark, A.R.3
  • 4
    • 0037432979 scopus 로고    scopus 로고
    • Optimization approximations for capacity constrained material requirements planning
    • Clark, A. R. 2003. "Optimization Approximations for Capacity Constrained Material Requirements Planning." International Journal of Production Economics 84 (2): 115-131
    • (2003) International Journal of Production Economics , vol.84 , Issue.2 , pp. 115-131
    • Clark, A.R.1
  • 5
    • 79951846026 scopus 로고    scopus 로고
    • Editorial: Lot sizing and scheduling-industrial extensions and research opportunities, special issue on lot sizing and scheduling
    • Clark, A. R., B. Almada-Lobo, and C. Almeder. 2011. "Editorial: Lot Sizing and Scheduling-Industrial Extensions and Research Opportunities, Special Issue on Lot Sizing and Scheduling." International Journal of Production Research 49 (9): 2457-2461
    • (2011) International Journal of Production Research , vol.49 , Issue.9 , pp. 2457-2461
    • Clark, A.R.1    Almada-Lobo, B.2    Almeder, C.3
  • 6
    • 0034631279 scopus 로고    scopus 로고
    • Rolling-horizon lot-sizing when setup times are sequence-dependent
    • Clark, A. R., and S. J. Clark. 2000. "Rolling-horizon Lot-sizing When Setup Times are Sequence-dependent." International Journal of Production Research 38 (10): 2287-2308
    • (2000) International Journal of Production Research , vol.38 , Issue.10 , pp. 2287-2308
    • Clark, A.R.1    Clark, S.J.2
  • 7
    • 77952430972 scopus 로고    scopus 로고
    • Production setup-sequencing and lot-sizing at an animal nutrition plant through atsp subtour elimination and patching
    • Clark, A. R., R. Morabito, and E. A. V. Toso. 2010. "Production Setup-sequencing and Lot-sizing at an Animal Nutrition Plant through ATSP Subtour Elimination and Patching." Journal of Scheduling 13 (2): 111-121
    • (2010) Journal of Scheduling , vol.13 , Issue.2 , pp. 111-121
    • Clark, A.R.1    Morabito, R.2    Toso, E.A.V.3
  • 10
    • 0000454153 scopus 로고
    • Solution of a large-scaletraveling-salesman problem
    • Dantzig, G., R. Fulkerson, and S. Johnson. 1954. "Solution of a Large-scaleTraveling-salesman Problem." Operations Research 2: 393-410
    • (1954) Operations Research , vol.2 , pp. 393-410
    • Dantzig, G.1    Fulkerson, R.2    Johnson, S.3
  • 12
    • 84857456910 scopus 로고    scopus 로고
    • Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft-drink production
    • Ferreira, D., A. R. Clark, B. Almada-Lobo, and R. Morabito. 2012. "Single-stage Formulations for Synchronised Two-stage Lot Sizing and Scheduling in Soft-drink Production." International Journal of Production Economics 136 (2): 255-265
    • (2012) International Journal of Production Economics , vol.136 , Issue.2 , pp. 255-265
    • Ferreira, D.1    Clark, A.R.2    Almada-Lobo, B.3    Morabito, R.4
  • 13
    • 58149250389 scopus 로고    scopus 로고
    • Solutionapproaches for the soft drink integrated production lot sizing and scheduling problem
    • Ferreira, D., R. Morabito, and S. Rangel. 2009. "SolutionApproaches for the Soft Drink Integrated Production Lot Sizing and Scheduling Problem." European Journal of Operational Research 196: 697-706
    • (2009) European Journal of Operational Research , vol.196 , pp. 697-706
    • Ferreira, D.1    Morabito, R.2    Rangel, S.3
  • 15
    • 0008655177 scopus 로고    scopus 로고
    • The general lotsizing and scheduling problem
    • Fleischmann, B., and H. Meyr. 1997. "The General Lotsizing and Scheduling Problem." OR Spektrum 19 (1): 11-21
    • (1997) OR Spektrum , vol.19 , Issue.1 , pp. 11-21
    • Fleischmann, B.1    Meyr, H.2
  • 18
    • 84861962649 scopus 로고    scopus 로고
    • Gurobi Optimization Inc. Accessed November 28 2013
    • Gurobi Optimization Inc. 2011. Gurobi Optimizer Version 4.5.0. Accessed November 28, 2013. www.gurobi.com
    • (2011) Gurobi Optimizer Version 4.5.0
  • 19
    • 0033690423 scopus 로고    scopus 로고
    • Lot sizing and scheduling with sequence dependent setup costs and times and efficient rescheduling opportunities
    • Haase, K., and A. Kimms. 1999. "Lot Sizing and Scheduling with Sequence Dependent Setup Costs and Times and Efficient Rescheduling Opportunities." International Journal of Production Economics 66: 159-169
    • (1999) International Journal of Production Economics , vol.66 , pp. 159-169
    • Haase, K.1    Kimms, A.2
  • 20
    • 0041511823 scopus 로고    scopus 로고
    • The capacitated lot sizing problem:areview of models andalgorithms
    • Karimi, B., S.M. T. Fatemi Ghomia, and J.M.Wilson. 2003. "The Capacitated Lot Sizing Problem:AReview of Models andAlgorithms." Omega 31: 365-378
    • (2003) Omega , vol.31 , pp. 365-378
    • Karimi, B.1    Fatemi Ghomia, S.M.T.2    Wilson, J.M.3
  • 21
    • 0001625702 scopus 로고
    • A patching algorithm for the nonsymmetric traveling-salesman problem
    • Karp, R. M. 1979. "A Patching Algorithm for the Nonsymmetric Traveling-Salesman Problem." SIAM Journal on Computing 8 (4): 561-573
    • (1979) SIAM Journal on Computing , vol.8 , Issue.4 , pp. 561-573
    • Karp, R.M.1
  • 23
    • 79958772189 scopus 로고    scopus 로고
    • Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-Triangular setups
    • Menezes, A., A. Clark, and B.Almada-Lobo. 2011. "Capacitated Lot-sizing and Scheduling with Sequence-dependent, Period-overlapping and Non-Triangular Setups." Journal of Scheduling 14 (2): 209-219
    • (2011) Journal of Scheduling , vol.14 , Issue.2 , pp. 209-219
    • Menezes, A.1    Clark, A.2    Almada-Lobo, B.3
  • 24
    • 0033903519 scopus 로고    scopus 로고
    • Simultaneous lot-sizing and scheduling by combining local search with dual optimization
    • Meyr, H. 2000. "Simultaneous Lot-sizing and Scheduling by Combining Local Search with Dual Optimization." European Journal of Operational Research 120: 311-326
    • (2000) European Journal of Operational Research , vol.120 , pp. 311-326
    • Meyr, H.1
  • 25
    • 0036604813 scopus 로고    scopus 로고
    • Simultaneous lotsizing and scheduling on parallelmachines
    • Meyr, H. 2002. "Simultaneous Lotsizing and Scheduling on ParallelMachines." European Journal of Operational Research 139: 277-292
    • (2002) European Journal of Operational Research , vol.139 , pp. 277-292
    • Meyr, H.1
  • 26
    • 53749099938 scopus 로고    scopus 로고
    • A comparativeanalysis of several asymmetric traveling salesman problem formulations
    • Öncan, T., K. Altinel, and G. Laporte. 2009. "A ComparativeAnalysis of Several Asymmetric Traveling Salesman Problem Formulations." Computers and Operations Research 36 (3): 637-654
    • (2009) Computers and Operations Research , vol.36 , Issue.3 , pp. 637-654
    • Öncan, T.1    Altinel, K.2    Laporte, G.3
  • 27
    • 14344264269 scopus 로고    scopus 로고
    • The travelling salesman problem-Application, formulations and variations
    • edited by G. Gutin and A. P. Punnen. Dordrecht Kluwer
    • Punnen, A. P. 2002. "The Travelling Salesman Problem-Application, Formulations and Variations." In The Traveling Salesman Problem and its Variations, edited by G. Gutin and A. P. Punnen, 1-28. Dordrecht: Kluwer
    • (2002) The Traveling Salesman Problem and Its Variations , pp. 1-28
    • Punnen, A.P.1
  • 28
    • 33746333266 scopus 로고    scopus 로고
    • Modeling of period overlapping setup times
    • Suerie, C. 2006. "Modeling of period overlapping setup times." European Journal of Operational Research, 174 (2), 874-886
    • (2006) European Journal of Operational Research , vol.174 , Issue.2 , pp. 874-886
    • Suerie, C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.