DAGEN: a generator of testsets for project activity nets
-
Agrawal, M., Elmaghraby, S. & Herroelen, W. (1996). DAGEN: a generator of testsets for project activity nets. European Journal of Operational Research, 90: 376–382.
-
(1996)
European Journal of Operational Research
, vol.90
, pp. 376-382
-
-
Agrawal, M.1
Elmaghraby, S.2
Herroelen, W.3
-
2
-
-
33645957411
-
Earned value project management method and extensions
-
Anbari, F. (2003). Earned value project management method and extensions. Project Management Journal, 34: 12–23.
-
(2003)
Project Management Journal
, vol.34
, pp. 12-23
-
-
Anbari, F.1
-
3
-
-
84922675108
-
Construction and evaluation framework for a real-life project database
-
Batselier, J. & Vanhoucke, M. (2015a). Construction and evaluation framework for a real-life project database. International Journal of Project Management, 33: 697–710.
-
(2015)
International Journal of Project Management
, vol.33
, pp. 697-710
-
-
Batselier, J.1
Vanhoucke, M.2
-
4
-
-
84940444592
-
Empirical evaluation of earned value management forecasting accuracy for time and cost
-
Batselier, J. & Vanhoucke, M. (2015b). Empirical evaluation of earned value management forecasting accuracy for time and cost. Journal of Construction Engineering and Management, 141: 05015010.
-
(2015)
Journal of Construction Engineering and Management
, vol.141
, pp. 05015010
-
-
Batselier, J.1
Vanhoucke, M.2
-
5
-
-
0006950088
-
The costs and benefits of the earned value management process
-
Christensen, D. (1998). The costs and benefits of the earned value management process. Acquisition Review Quarterly, Fall: 373–386.
-
(1998)
Acquisition Review Quarterly, Fall
, pp. 373-386
-
-
Christensen, D.1
-
6
-
-
15844413358
-
A tool for managing projects: an analytic parameterization of the S-curve
-
Cioffi, D. (2005). A tool for managing projects: an analytic parameterization of the S-curve. International Journal of Project Management, 23: 215–222.
-
(2005)
International Journal of Project Management
, vol.23
, pp. 215-222
-
-
Cioffi, D.1
-
7
-
-
33644634373
-
Completing projects according to plans: an earned-value improvement index
-
Cioffi, D. (2006). Completing projects according to plans: an earned-value improvement index. Journal of the Operational Research Society, 57: 290–295.
-
(2006)
Journal of the Operational Research Society
, vol.57
, pp. 290-295
-
-
Cioffi, D.1
-
8
-
-
3543055794
-
RanGen: a random network generator for activity-on-the-node networks
-
Demeulemeester, E., Vanhoucke, M. & Herroelen, W. (2003). RanGen: a random network generator for activity-on-the-node networks. Journal of Scheduling, 6: 17–38.
-
(2003)
Journal of Scheduling
, vol.6
, pp. 17-38
-
-
Demeulemeester, E.1
Vanhoucke, M.2
Herroelen, W.3
-
9
-
-
85012063728
-
Earned progress management-a unified theory of earned value & earned schedule concepts
-
Egnot, J. (2011). Earned progress management-a unified theory of earned value & earned schedule concepts. The Measurable News, Issue 4: 8–24.
-
(2011)
The Measurable News, Issue
, vol.4
, pp. 8-24
-
-
Egnot, J.1
-
10
-
-
84875117724
-
Impact of sensitivity information on the prediction of project’s duration using earned schedule method
-
Elshaer, R. (2012). Impact of sensitivity information on the prediction of project’s duration using earned schedule method. International Journal of Project Management, 31: 579–588.
-
(2012)
International Journal of Project Management
, vol.31
, pp. 579-588
-
-
Elshaer, R.1
-
12
-
-
84863308988
-
Project management: recent developments and research opportunities
-
Hall, N. (2012). Project management: recent developments and research opportunities. Journal of Systems Science and Systems Engineering, 21: 129–143.
-
(2012)
Journal of Systems Science and Systems Engineering
, vol.21
, pp. 129-143
-
-
Hall, N.1
-
13
-
-
79952681879
-
Earned schedule: a breakthrough extension to earned value management
-
Henderson, K. (2007). Earned schedule: a breakthrough extension to earned value management. In: PMI Asia Pacific Global Congress Proceedings, Hong Kong.
-
(2007)
PMI Asia Pacific Global Congress Proceedings
-
-
Henderson, K.1
-
14
-
-
35448950734
-
Forecasting schedule completion using earned value metrics revisited
-
Jacob, D. & Kane, M. (2004). Forecasting schedule completion using earned value metrics revisited. The Measurable News, Summer: 1, 11–17.
-
(2004)
The Measurable News, Summer
, vol.1
, pp. 11-17
-
-
Jacob, D.1
Kane, M.2
-
15
-
-
0020103084
-
On dynamic programming methods for assembly line balancing
-
Kao, E. & Queyranne, M. (1982). On dynamic programming methods for assembly line balancing. Operations Research, 30: 375–390.
-
(1982)
Operations Research
, vol.30
, pp. 375-390
-
-
Kao, E.1
Queyranne, M.2
-
16
-
-
0038721043
-
A model for effective implementation of earned value management methodology
-
Kim, E., Wells, W. & Duffey, M. (2003). A model for effective implementation of earned value management methodology. International Journal of Project Management, 21: 375–382.
-
(2003)
International Journal of Project Management
, vol.21
, pp. 375-382
-
-
Kim, E.1
Wells, W.2
Duffey, M.3
-
17
-
-
0000698758
-
Characterization and generation of a general class of resource-constrained project scheduling problems
-
Kolisch, R., Sprecher, A. & Drexl, A. (1995). Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science, 41: 1693–1703.
-
(1995)
Management Science
, vol.41
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
19
-
-
81255205087
-
The contribution of earned value management to project success on contracted efforts
-
Marshall, R. (2007). The contribution of earned value management to project success on contracted efforts. Journal of Contract Management, Summer: 21–33.
-
(2007)
Journal of Contract Management
, pp. 21-33
-
-
Marshall, R.1
-
20
-
-
0001636411
-
An experimental and comparative evaluation of production line balancing techniques
-
Mastor, A. (1970). An experimental and comparative evaluation of production line balancing techniques. Management Science, 16: 728–746.
-
(1970)
Management Science
, vol.16
, pp. 728-746
-
-
Mastor, A.1
-
22
-
-
84964055694
-
-
Project Management Institute, Newtown Square, Pennsylvania
-
PMI (2008). A Guide to the Project Management Body of Knowledge (PMBOK Guide) (3rd ed). Project Management Institute, Newtown Square, Pennsylvania.
-
(2008)
A Guide to the Project Management Body of Knowledge
-
-
-
23
-
-
84655171929
-
A comparison of three completion date predicting methods for construction projects
-
Rujirayanyong, T. (2009). A comparison of three completion date predicting methods for construction projects. Journal of Research in Engineering and Technology, 6: 305–318.
-
(2009)
Journal of Research in Engineering and Technology
, vol.6
, pp. 305-318
-
-
Rujirayanyong, T.1
-
26
-
-
0343953621
-
The risk of delay of a project in terms of the morphology of its network
-
Tavares, L., Ferreira, J. & Coelho, J. (1999). The risk of delay of a project in terms of the morphology of its network. European Journal of Operational Research, 119: 510–537.
-
(1999)
European Journal of Operational Research
, vol.119
, pp. 510-537
-
-
Tavares, L.1
Ferreira, J.2
Coelho, J.3
-
27
-
-
85012088975
-
Time is up: assessing schedule performance with earned value
-
Van De Velde, R. (2007). Time is up: assessing schedule performance with earned value. PM World Today, 9: 1–10.
-
(2007)
PM World Today
, vol.9
, pp. 1-10
-
-
Van De Velde, R.1
-
28
-
-
33645967441
-
A comparison of different project duration forecasting methods using earned value metrics
-
Vandevoorde, S. & Vanhoucke, M. (2006). A comparison of different project duration forecasting methods using earned value metrics. International Journal of Project Management, 24: 289–302.
-
(2006)
International Journal of Project Management
, vol.24
, pp. 289-302
-
-
Vandevoorde, S.1
Vanhoucke, M.2
-
30
-
-
77953177108
-
Using activity sensitivity and network topology information to monitor project time performance
-
Vanhoucke, M. (2010b). Using activity sensitivity and network topology information to monitor project time performance. Omega-The International Journal of Management Science, 38: 359–370.
-
(2010)
Omega-The International Journal of Management Science
, vol.38
, pp. 359-370
-
-
Vanhoucke, M.1
-
31
-
-
78649854792
-
On the dynamic use of project performance and schedule risk information during project tracking
-
Vanhoucke, M. (2011). On the dynamic use of project performance and schedule risk information during project tracking. Omega-The International Journal of Management Science, 39: 416–426.
-
(2011)
Omega-The International Journal of Management Science
, vol.39
, pp. 416-426
-
-
Vanhoucke, M.1
-
32
-
-
84655167747
-
Measuring the efficiency of project control using fictitious and empirical project data
-
Vanhoucke, M. (2012a). Measuring the efficiency of project control using fictitious and empirical project data. International Journal of Project Management, 30: 252–263.
-
(2012)
International Journal of Project Management
, vol.30
, pp. 252-263
-
-
Vanhoucke, M.1
-
35
-
-
36048990558
-
An evaluation of the adequacy of project network generators with systematically sampled networks
-
Vanhoucke, M., Coelho, J., Debels, D., Maenhout, B. & Tavares, L. (2008). An evaluation of the adequacy of project network generators with systematically sampled networks. European Journal of Operational Research, 187: 511–524.
-
(2008)
European Journal of Operational Research
, vol.187
, pp. 511-524
-
-
Vanhoucke, M.1
Coelho, J.2
Debels, D.3
Maenhout, B.4
Tavares, L.5
-
36
-
-
35448944883
-
A simulation and evaluation of earned value metrics to forecast the project duration
-
Vanhoucke, M. & Vandevoorde, S. (2007). A simulation and evaluation of earned value metrics to forecast the project duration. Journal of the Operational Research Society, 58: 1361–1374.
-
(2007)
Journal of the Operational Research Society
, vol.58
, pp. 1361-1374
-
-
Vanhoucke, M.1
Vandevoorde, S.2
|