-
1
-
-
33746817053
-
A multi-objective ap-proach to facility layout problem by genetic search algo-rithm and Electre method
-
Aiello, G., Enea, M., Galante, G. 2006. A multi-objective ap-proach to facility layout problem by genetic search algo-rithm and Electre method, Robotics and Computer-Inte-grated Manufacturing 22: 447-455. http://dx.doi.org/10.1016/j.rcim.2005.11.002 doi: 10.1016/j.rcim.2005.11.002
-
(2006)
Robotics and Computer-Inte-grated Manufacturing
, vol.22
, pp. 447-455
-
-
Aiello, G.1
Enea, M.2
Galante, G.3
-
2
-
-
0003602231
-
-
Bristol: IOP Publishing Ltd., Oxford University Press
-
Back, T., Fogel, D., Michalewicz, Z. 2000. Handbook of evolu-tionary computation. Bristol: IOP Publishing Ltd., Oxford University Press.
-
(2000)
Handbook of Evolu-tionary Computation
-
-
Back, T.1
Fogel, D.2
Michalewicz, Z.3
-
3
-
-
27844552850
-
An ant colony algorithm for solving budget constrained and unconstrained dynamic facility layout problems
-
Baykasoglu, A., Dereli, T., Sabuncu, I. 2006. An ant colony algorithm for solving budget constrained and unconstrained dynamic facility layout problems, Omega 34: 385-396. http://dx.doi.org/10.1016/j.omega.2004.12.001 doi: 10.1016/j.omega.2004.12.001
-
(2006)
Omega
, vol.34
, pp. 385-396
-
-
Baykasoglu, A.1
Dereli, T.2
Sabuncu, I.3
-
4
-
-
0029358362
-
Single and multi-ob-jective structural optimization in discrete-continuous variables using simulated annealing
-
Bennage, W. A., Dhingra, A. K. 1995. Single and multi-ob-jective structural optimization in discrete-continuous variables using simulated annealing, International Journal for Numerical Methods in Engineering 38: 2753-53. http://dx.doi.org/10.1002/nme.1620381606 doi: 10.1002/nme.1620381606
-
(1995)
International Journal for Numerical Methods in Engineering
, vol.38
, pp. 2753-2853
-
-
Bennage, W.A.1
Dhingra, A.K.2
-
5
-
-
0036028136
-
Site pre-cast yard layout arrangement through genetic algorithms
-
Cheung, S., Tong, T., Tam, C. 2002. Site pre-cast yard layout arrangement through genetic algorithms, Automation in Construction 11 (1): 35-46. http://dx.doi.org/10.1016/S0926-5805(01)00044-9 doi: 10.1016/S0926-5805(01)00044-9
-
(2002)
Automation in Construction
, vol.11
, Issue.1
, pp. 35-46
-
-
Cheung, S.1
Tong, T.2
Tam, C.3
-
6
-
-
13944250354
-
Fuzzy decision support system for manufacturing facilities layout planning
-
Deb, S. K., Bhattacharyya, B. 2005. Fuzzy decision support system for manufacturing facilities layout planning, Decision Support Systems 40: 305-314. http://dx.doi.org/10.1016/j.dss.2003.12.007 doi: 10.1016/j.dss.2003.12.007
-
(2005)
Decision Support Systems
, vol.40
, pp. 305-314
-
-
Deb, S.K.1
Bhattacharyya, B.2
-
7
-
-
0003177289
-
Location and layout plan-ning- A survey
-
Domschke, W., Krispin, G. 1997. Location and layout plan-ning-a survey, Operations-Research-Spektrum 19: 181-194. http://dx.doi.org/10.1007/BF01545586 doi: 10.1007/BF01545586
-
(1997)
Operations-Research-Spektrum
, vol.19
, pp. 181-194
-
-
Domschke, W.1
Krispin, G.2
-
8
-
-
0030288072
-
Application of fuzzy decision-making in facilities layout planning
-
Dweiri, F., Meier, F. A. 1996. Application of fuzzy decision-making in facilities layout planning, International Journal of Production Research 34 (11): 3207-3225. http://dx.doi.org/10.1080/00207549608905085 doi: 10.1080/00207549608905085
-
(1996)
International Journal of Production Research
, vol.34
, Issue.11
, pp. 3207-3225
-
-
Dweiri, F.1
Meier, F.A.2
-
9
-
-
60449095441
-
Dynamic site layout planning us-ing approximate dynamic programming
-
El-Rayes, K., Said, H. 2010. Dynamic site layout planning us-ing approximate dynamic programming, Journal of Com-puting in Civil Engineering 23 (2): 119-127. http://dx.doi.org/10.1061/(ASCE)0887-3801(2009)23:2(119) doi: 10.1061/(ASCE)0887-3801(2009)23:2(119)
-
(2010)
Journal of Com-puting in Civil Engineering
, vol.23
, Issue.2
, pp. 119-127
-
-
El-Rayes, K.1
Said, H.2
-
10
-
-
0035052778
-
A hybrid AI-based system for site layout planning in construction site
-
Elbeltagi, E., Hegazy, T. 2001. A hybrid AI-based system for site layout planning in construction site, Computer-Aided Civil and Infrastructure Engineering 16 (2): 79-93. http://dx.doi.org/10.1111/0885-9507.00215 doi: 10.1111/0885-9507.00215
-
(2001)
Computer-Aided Civil and Infrastructure Engineering
, vol.16
, Issue.2
, pp. 79-93
-
-
Elbeltagi, E.1
Hegazy, T.2
-
11
-
-
0035501643
-
Schedule-dependent evolution of site layout planning
-
Elbeltagi, E., Hegazy, T., Hosny, A., Eldosouky, A. 2001. Schedule-dependent evolution of site layout planning, Construction Management and Economics 19 (7): 689-697. http://dx.doi.org/10.1080/01446190110066713 doi: 10.1080/01446190110066713
-
(2001)
Construction Management and Economics
, vol.19
, Issue.7
, pp. 689-697
-
-
Elbeltagi, E.1
Hegazy, T.2
Hosny, A.3
Eldosouky, A.4
-
12
-
-
13944281386
-
Dynamic layout of construction temporary facilities considering safety
-
Elbeltagi, E., Hegazy, T. 2004. Dynamic layout of construction temporary facilities considering safety, Journal of Con-struction Engineering and Management 130 (4): 534-541. http://dx.doi.org/10.1061/(ASCE)0733-9364(2004)130:4(534) doi: 10.1061/(ASCE)0733-9364(2004)130:4(534)
-
(2004)
Journal of Con-struction Engineering and Management
, vol.130
, Issue.4
, pp. 534-541
-
-
Elbeltagi, E.1
Hegazy, T.2
-
13
-
-
59749093636
-
An occupational safety risk analysis method at construction sites using fuzzy sets
-
Emre, G., Gürcanli, G., Muüngen, U. 2009. An occupational safety risk analysis method at construction sites using fuzzy sets, International Journal of Industrial Ergonomics 39: 371-387. http://dx.doi.org/10.1016/j.ergon.2008.10.006
-
(2009)
International Journal of Industrial Ergonomics
, vol.39
, pp. 371-387
-
-
Emre, G.1
Gürcanli, G.2
Muüngen, U.3
-
14
-
-
0022100903
-
Multiple criteria approach to the facilities layout problem
-
Fortenberry, J., Cox, J. 1985. Multiple criteria approach to the facilities layout problem, International Journal of Pro-duction Research 23 (4): 773-782. http://dx.doi.org/10.1080/00207548508904746 doi: 10.1080/00207548508904746
-
(1985)
International Journal of Pro-duction Research
, vol.23
, Issue.4
, pp. 773-782
-
-
Fortenberry, J.1
Cox, J.2
-
16
-
-
0037395503
-
Development of an inherent safety index based on fuzzy logic
-
Gentile, M., Rogers, W. J., Mannan, M. S. 2003. Development of an inherent safety index based on fuzzy logic, AIChE Journal 49 (4): 959-968. http://dx.doi.org/10.1002/aic.690490413 doi: 10.1002/aic.690490413
-
(2003)
AIChE Journal
, vol.49
, Issue.4
, pp. 959-968
-
-
Gentile, M.1
Rogers, W.J.2
Mannan, M.S.3
-
17
-
-
84962316617
-
The resource-constraint project schedul-ing with multi-mode under fuzzy random environment in the drainage engineering of LT hydropower
-
Gang, J., Xu, J. 2010. The resource-constraint project schedul-ing with multi-mode under fuzzy random environment in the drainage engineering of LT hydropower, International Journal of Logistics and Transportation 4 (2): 53-80.
-
(2010)
International Journal of Logistics and Transportation
, vol.4
, Issue.2
, pp. 53-80
-
-
Gang, J.1
Xu, J.2
-
18
-
-
83555172671
-
Mitigating construction safety risks using preven-tion through design
-
Gangolells, M., Casals, M., Forcada, N., Roca, X., Fuertes, A. 2010. Mitigating construction safety risks using preven-tion through design, Journal of Safety Research 41: 107-122. http://dx.doi.org/10.1016/j.jsr.2009.10.007 doi: 10.1016/j.jsr.2009.10.007
-
(2010)
Journal of Safety Research
, vol.41
, pp. 107-122
-
-
Gangolells, M.1
Casals, M.2
Forcada, N.3
Roca, X.4
Fuertes, A.5
-
19
-
-
0032654594
-
Genetic al-gorithms application and testing for equipment selection
-
Haidar, A., Naoum, S., Howes, R., Tah, J. 2009. Genetic al-gorithms application and testing for equipment selection, Journal of Construction Engineering and Management 125 (1): 32-38. http://dx.doi.org/10.1061/(ASCE)0733-9364(1999)125:1(32) doi: 10.1061/(ASCE)0733-9364(1999)125:1(32)
-
(2009)
Journal of Construction Engineering and Management
, vol.125
, Issue.1
, pp. 32-38
-
-
Haidar, A.1
Naoum, S.2
Howes, R.3
Tah, J.4
-
20
-
-
26444479778
-
Optimisa-tion by simulated annealing
-
Kirkpatrick, S., Gelatt, C. D. Jr., Vecchi, M. P. 1983. Optimisa-tion by simulated annealing, Science 220: 671-680. http://dx.doi.org/10.1126/science.220.4598.671 doi: 10.1126/science.220.4598.671
-
(1983)
Science
, vol.220
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt, C.D.2
Vecchi, M.P.3
-
21
-
-
0034244842
-
Tools of soft computing as applied to the problem of facilities layout planning
-
Karray, F., Zaneldin, E., Hegazy, T., Shabeeb, A. H. M., Elbelt-agi, E. 2000. Tools of soft computing as applied to the problem of facilities layout planning, IEEE Transactions on Fuzzy Systems 8 (4): 367-379. http://dx.doi.org/10.1109/91.868944 doi: 10.1109/91.868944
-
(2000)
IEEE Transactions on Fuzzy Systems
, vol.8
, Issue.4
, pp. 367-379
-
-
Karray, F.1
Zaneldin, E.2
Hegazy, T.3
Shabeeb, A.H.M.4
Elbelt-Agi, E.5
-
22
-
-
0032187321
-
Site-lever facilities layout using genetic algorithms
-
Li, H., Love, P. 1998. Site-lever facilities layout using genetic algorithms, Journal of Computing in Civil Engineering 12 (4): 227-231. http://dx.doi.org/10.1061/(ASCE)0887-3801(1998)12:4(227) doi: 10.1061/(ASCE)0887-3801(1998)12:4(227)
-
(1998)
Journal of Computing in Civil Engineering
, vol.12
, Issue.4
, pp. 227-231
-
-
Li, H.1
Love, P.2
-
23
-
-
84856607630
-
Project cash flow analysis in the presence of uncertainty in activity duration and cost
-
Maravas, A., Pantouvakis, J. 2012. Project cash flow analysis in the presence of uncertainty in activity duration and cost, International Journal of Project Management 30: 374-384. http://dx.doi.org/10.1016/j.ijproman.2011.08.005 doi: 10.1016/j.ijproman.2011.08.005
-
(2012)
International Journal of Project Management
, vol.30
, pp. 374-384
-
-
Maravas, A.1
Pantouvakis, J.2
-
24
-
-
0142186028
-
Proposed genetic algorithms for construction site layout
-
Mawdesley, M. J., Al-Jibouri, S. H. 2003. Proposed genetic algorithms for construction site layout, Engineering Applications of Artificial Intelligence 16: 501-509. http://dx.doi.org/10.1016/j.engappai.2003.09.002 doi: 10.1016/j.engappai.2003.09.002
-
(2003)
Engineering Applications of Artificial Intelligence
, vol.16
, pp. 501-509
-
-
Mawdesley, M.J.1
Al-Jibouri, S.H.2
-
25
-
-
33749834100
-
The facility layout problem: Recent and emerging trends and perspectives
-
Meller, R., Gau, K. 1996. The facility layout problem: recent and emerging trends and perspectives, Journal of Manufacturing Systems 15 (5): 351-366. http://dx.doi.org/10.1016/0278-6125(96)84198-7 doi: 10.1016/0278-6125(96)84198-7
-
(1996)
Journal of Manufacturing Systems
, vol.15
, Issue.5
, pp. 351-366
-
-
Meller, R.1
Gau, K.2
-
26
-
-
77955682503
-
State of the art for genetic algorithms and beyond in water resources planning and management
-
Nicklow, J., Reed, P., Savic, D., Dessalegne, T., Harrell, L., Chan-Hilton, A., Karamouz, M., Minsker, B., Ostfeld, A., Singh, A. 2010. State of the art for genetic algorithms and beyond in water resources planning and management, Journal of Water Resources Planning and Management 136 (4): 412-432. http://dx.doi.org/10.1061/(ASCE)WR.1943-5452.0000053 doi: 10.1061/(ASCE)WR.1943-5452.0000053
-
(2010)
Journal of Water Resources Planning and Management
, vol.136
, Issue.4
, pp. 412-432
-
-
Nicklow, J.1
Reed, P.2
Savic, D.3
Dessalegne, T.4
Harrell, L.5
Chan-Hilton, A.6
Karamouz, M.7
Minsker, B.8
Ostfeld, A.9
Singh, A.10
-
27
-
-
70449526183
-
Dynamic construction site layout planning using max-min ant system
-
Ning, X., Lam, K. C., Lam, M. C. 2010. Dynamic construction site layout planning using max-min ant system, Automation in Construction 19 (1): 55-65. http://dx.doi.org/10.1016/j.autcon.2009.09.002 doi: 10.1016/j.autcon.2009.09.002
-
(2010)
Automation in Construction
, vol.19
, Issue.1
, pp. 55-65
-
-
Ning, X.1
Lam, K.C.2
Lam, M.C.3
-
28
-
-
80055008998
-
Construction site layout evaluation by intuitionistic fuzzy TOPSIS model
-
Ning, X., Wang, L. G. 2011. Construction site layout evaluation by intuitionistic fuzzy TOPSIS model, Applied Mechanics and Materials 71: 583-588. http://dx.doi.org/10.4028/www.scientific.net/AMM.71-78.583 doi: 10.4028/www.scientific.net/AMM.71-78.583
-
(2011)
Applied Mechanics and Materials
, vol.71
, pp. 583-588
-
-
Ning, X.1
Wang, L.G.2
-
29
-
-
0022516277
-
The dynamics of plant layout
-
Rosenblatt, M. 1986. The dynamics of plant layout, Manage-ment Science 32 (1): 76-86. http://dx.doi.org/10.1287/mnsc.32.1.76
-
(1986)
Manage-ment Science
, vol.32
, Issue.1
, pp. 76-86
-
-
Rosenblatt, M.1
-
31
-
-
4344717496
-
A fuzzy based multi-objec-tive path planning of construction sites
-
Soltani, A. R., Fernando, T. 2004. A fuzzy based multi-objec-tive path planning of construction sites, Automation in Construction 13 (6): 717-734. http://dx.doi.org/10.1016/j.autcon.2004.04.012 doi: 10.1016/j.autcon.2004.04.012
-
(2004)
Automation in Construction
, vol.13
, Issue.6
, pp. 717-734
-
-
Soltani, A.R.1
Fernando, T.2
-
32
-
-
0003975005
-
-
New York: Wiley
-
Tompkins, J. A., White, J. A., Bozer, Y. A., Frazelle, E. H., Tanchoco, J. M., Trevino, J. 1996. Facilities planning. New York: Wiley.
-
(1996)
Facilities Planning
-
-
Tompkins, J.A.1
White, J.A.2
Bozer, Y.A.3
Frazelle, E.H.4
Tanchoco, J.M.5
Trevino, J.6
-
33
-
-
70349092704
-
Multi-criteria optimization system for decision making in construction design and management
-
Turskis, Z., Zavadskas, E. K., Peldschus, F. 2009. Multi-criteria optimization system for decision making in construction design and management, Inzinerine Ekonomika-Engi-neering Economics 61 (1): 7-17.
-
(2009)
Inzinerine Ekonomika-Engi-neering Economics
, vol.61
, Issue.1
, pp. 7-17
-
-
Turskis, Z.1
Zavadskas, E.K.2
Peldschus, F.3
-
34
-
-
45749096045
-
An auto-mated system for dynamic construction site layout plan-ning
-
22-24 April 2003, Ain Shams University, Cairo, Egypt
-
Osman, H. M., Georgy, M. E., Ibrahim, M. E. 2003. An auto-mated system for dynamic construction site layout plan-ning, in Tenth International Colloquium on Structural and Geotechnical Engineering,. 22-24 April 2003, Ain Shams University, Cairo, Egypt.
-
(2003)
Tenth International Colloquium on Structural and Geotechnical Engineering
-
-
Osman, H.M.1
Georgy, M.E.2
Ibrahim, M.E.3
-
35
-
-
0032364642
-
Solution procedures for the dynamic facil-ity layout problem
-
Urban, T. L. 1998. Solution procedures for the dynamic facil-ity layout problem, Annals of Operations Research 76: 323-342. http://dx.doi.org/10.1023/A:1018904806854 doi: 10.1023/A:1018904806854
-
(1998)
Annals of Operations Research
, vol.76
, pp. 323-342
-
-
Urban, T.L.1
-
37
-
-
84863711984
-
Multi-objective dynamic construction site layout planning under fuzzy random environment
-
Xu, J., Li, M. 2012. Multi-objective dynamic construction site layout planning under fuzzy random environment, Automation in Construction 27: 155-169. http://dx.doi.org/10.1016/j.autcon.2012.05.017 doi: 10.1016/j.autcon.2012.05.017
-
(2012)
Automation in Construction
, vol.27
, pp. 155-169
-
-
Xu, J.1
Li, M.2
-
38
-
-
79955031757
-
A fuzzy random resource-constrained scheduling model with multiple projects and its applica-tion to a working procedure in a large-scale water con-servancy and hydropower construction project
-
Xu, J., Zhang, Z. 2012. A fuzzy random resource-constrained scheduling model with multiple projects and its applica-tion to a working procedure in a large-scale water con-servancy and hydropower construction project, Journal of Scheduling 15 (2): 253-272. http://dx.doi.org/10.1007/s10951-010-0173-1
-
(2012)
Journal of Scheduling
, vol.15
, Issue.2
, pp. 253-272
-
-
Xu, J.1
Zhang, Z.2
-
39
-
-
33750736678
-
Multiple-attribute decision making methods for plant layout design problem
-
Yang, T., Hung, C. C. 2007. Multiple-attribute decision making methods for plant layout design problem, Robotics and Computer-Integrated Manufacturing 23: 126-137. http://dx.doi.org/10.1016/j.rcim.2005.12.002 doi: 10.1016/j.rcim.2005.12.002
-
(2007)
Robotics and Computer-Integrated Manufacturing
, vol.23
, pp. 126-137
-
-
Yang, T.1
Hung, C.C.2
-
40
-
-
0029344681
-
Construction-site layout using annealed neural network
-
Yeh, I. 1995. Construction-site layout using annealed neural network, Journal of Computing in Civil Engineering 9 (3): 201-208. http://dx.doi.org/10.1061/(ASCE)0887-3801(1995)9:3(201) doi: 10.1061/(ASCE)0887-3801(1995)9:3(201)
-
(1995)
Journal of Computing in Civil Engineering
, vol.9
, Issue.3
, pp. 201-208
-
-
Yeh, I.1
-
41
-
-
34248666540
-
Fuzzy sets
-
Zadeh, L. A. 1965. Fuzzy sets, Information and Control 8: 338-553. http://dx.doi.org/10.1016/S0019-9958(65)90241-X doi: 10.1016/S0019-9958(65)90241-X
-
(1965)
Information and Control
, vol.8
, pp. 338-553
-
-
Zadeh, L.A.1
-
43
-
-
0033313625
-
Dynamic layout planning using a hybrid incremental solution method
-
Zouein, P., Tommelein, I. 1999. Dynamic layout planning using a hybrid incremental solution method, Journal of Con-struction Engineering and Management 125 (6): 400-408. http://dx.doi.org/10.1061/(ASCE)0733-9364(1999)125:6(400) doi: 10.1061/(ASCE)0733-9364(1999)125:6(400)
-
(1999)
Journal of Con-struction Engineering and Management
, vol.125
, Issue.6
, pp. 400-408
-
-
Zouein, P.1
Tommelein, I.2
|