메뉴 건너뛰기




Volumn 41, Issue 2, 2010, Pages 107-122

Mitigating construction safety risks using prevention through design

Author keywords

Building; Construction Hazards Prevention through Design; Construction process; Health and safety management; Risk assessment

Indexed keywords

ACCIDENT PREVENTION; BUILDINGS; CONSTRUCTION INDUSTRY; DESIGN; HAZARDS; HEALTH HAZARDS; HEALTH RISKS; RISK ANALYSIS; RISK ASSESSMENT; SAFETY ENGINEERING;

EID: 83555172671     PISSN: 00224375     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jsr.2009.10.007     Document Type: Article
Times cited : (143)

References (23)
  • 1
    • 27544478622 scopus 로고    scopus 로고
    • Linking construction fatalities to the design for construction safety concept
    • DOI 10.1016/j.ssci.2005.04.002, PII S0925753505000731
    • Behm, M. (2005). Linking construction fatalities to the design for construction safety concept. Safety Science, 43(8), 589-611. (Pubitemid 41539665)
    • (2005) Safety Science , vol.43 , Issue.8 , pp. 589-611
    • Behm, M.1
  • 3
    • 30844457958 scopus 로고    scopus 로고
    • Safety hazard identification on construction projects
    • DOI 10.1061/(ASCE)0733-9364(2006)132:2(197)
    • Carter, G., & Smith, S. (2006). Safety hazard identification on construction projects. Journal of Construction Engineering and Management, 132(2), 197-205. (Pubitemid 43107218)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.2 , pp. 197-205
    • Carter, G.1    Smith, S.D.2
  • 4
    • 2642531957 scopus 로고    scopus 로고
    • CSHM: Web-based safety and health monitoring system for construction management
    • Cheung, S. O., Cheung, K., & Suen, H. (2004). CSHM: Web-based safety and health monitoring system for construction management. Journal of Safety Research, 35(2), 159-170.
    • (2004) Journal of Safety Research , vol.35 , Issue.2 , pp. 159-170
    • Cheung, S.O.1    Cheung, K.2    Suen, H.3
  • 5
    • 10344242963 scopus 로고    scopus 로고
    • A web-based performance assessment system for environmental protection: WePass
    • DOI 10.1080/0144619042000202843
    • Cheung, S. O., Tam, C. M., Tam, V., Cheung, K., & Suen, H. (2004). A web-based performance assessment system for environmental protection: WePass. Construction Management and Economics, 22(9), 927-935. (Pubitemid 39632013)
    • (2004) Construction Management and Economics , vol.22 , Issue.9 , pp. 927-935
    • Cheung, S.O.1    Tam, C.M.2    Tam, V.3    Cheung, K.4    Suen, H.5
  • 6
    • 28444488958 scopus 로고    scopus 로고
    • Safety design: Towards a new philosophy
    • DOI 10.1016/j.ssci.2005.09.008, PII S0925753505000974, Safety and Design
    • Fadier, E., & De la Garza, C. (2006). Safety design: Towards a new philosophy. Safety Science, 44(1), 55-73. (Pubitemid 41736037)
    • (2006) Safety Science , vol.44 , Issue.1 , pp. 55-73
    • Fadier, E.1    De La Garza, C.2
  • 7
    • 0344667726 scopus 로고    scopus 로고
    • Factor analysis-based studies on construction workplace safety management in China
    • DOI 10.1016/S0263-7863(02)00115-1
    • Fang, D. P., Xie, F., Huang, X. Y., & Li, H. (2004). Factor analysis-based studies on construction workplace safety management in China. International Journal of Project Management, 22(1), 43-49. (Pubitemid 37497025)
    • (2004) International Journal of Project Management , vol.22 , Issue.1 , pp. 43-49
    • Fang, D.P.1    Xie, F.2    Huang, X.Y.3    Li, H.4
  • 8
    • 0015201468 scopus 로고
    • Mathematical evaluation for controlling hazards
    • Fine, W. T., & Kinney, W. D. (1971). Mathematical evaluation for controlling hazards. Journal of Safety Research, 3(4), 157-166.
    • (1971) Journal of Safety Research , vol.3 , Issue.4 , pp. 157-166
    • Fine, W.T.1    Kinney, W.D.2
  • 9
    • 38749115825 scopus 로고    scopus 로고
    • Safety assessment in design and preparation phase
    • DOI 10.1016/j.ssci.2007.06.032, PII S0925753507000975
    • Frijters, A. C. P., & Swuste, P. H. J. J. (2008). Safety assessment in design and preparation phase. Safety Science, 46(2), 272-281. (Pubitemid 351179224)
    • (2008) Safety Science , vol.46 , Issue.2 , pp. 272-281
    • Frijters, A.C.P.1    Swuste, P.H.J.J.2
  • 10
    • 43049180004 scopus 로고    scopus 로고
    • Research issues in prevention through design
    • Gambatese, J. A. (2008). Research issues in Prevention through Design. Journal of Safety Research, 39(2), 153-156.
    • (2008) Journal of Safety Research , vol.39 , Issue.2 , pp. 153-156
    • Gambatese, J.A.1
  • 11
    • 0032593172 scopus 로고    scopus 로고
    • Addressing construction worker safety in the design phase: Designing for construction worker safety
    • Gambatese, J. A., & Hinze, J. (1999). Addressing construction worker safety in the design phase: Designing for construction worker safety. Automation in Construction, 8(6), 643-649.
    • (1999) Automation in Construction , vol.8 , Issue.6 , pp. 643-649
    • Gambatese, J.A.1    Hinze, J.2
  • 12
    • 42949103619 scopus 로고    scopus 로고
    • Design's role in construction accident causality and prevention: Perspectives from an expert panel
    • DOI 10.1016/j.ssci.2007.06.010, PII S0925753507001063
    • Gambatese, J. A., Behm, M., & Rajendran, S. (2008). Design's role in construction accident causality and prevention: Perspectives from an expert panel. Safety Science, 46(4), 675-691. (Pubitemid 351609382)
    • (2008) Safety Science , vol.46 , Issue.4 , pp. 675-691
    • Gambatese, J.A.1    Behm, M.2    Rajendran, S.3
  • 13
    • 56349086441 scopus 로고    scopus 로고
    • A methodology for predicting the severity of environmental impacts related to the construction process of residential buildings
    • Gangolells, M., Casals, M., Gassó, S., Forcada, N., Roca, X., & Fuertes, A. (2009). A methodology for predicting the severity of environmental impacts related to the construction process of residential buildings. Building and Environment, 44(3), 558-571.
    • (2009) Building and Environment , vol.44 , Issue.3 , pp. 558-571
    • Gangolells, M.1    Casals, M.2    Gassó, S.3    Forcada, N.4    Roca, X.5    Fuertes, A.6
  • 14
    • 56349160518 scopus 로고    scopus 로고
    • An expert system for strategic control of accidents and insurers' risks in building construction projects
    • Imriyas, K. (2009). An expert system for strategic control of accidents and insurers' risks in building construction projects. Expert Systems with Applications, 36(2), 4021-4034.
    • (2009) Expert Systems with Applications , vol.36 , Issue.2 , pp. 4021-4034
    • Imriyas, K.1
  • 15
    • 0032100379 scopus 로고    scopus 로고
    • Safety assessment in the built environment of Saudi Arabia
    • DOI 10.1016/S0925-7535(98)00018-6, PII S0925753598000186
    • Jannadi, M. O., & Assaf, S. (1998). Safety assessment in the built environment of Saudi Arabia. Safety Science, 29(1), 15-24. (Pubitemid 28488540)
    • (1998) Safety Science , vol.29 , Issue.1 , pp. 15-24
    • Jannadi, M.O.1    Assaf, S.2
  • 16
    • 33745387525 scopus 로고    scopus 로고
    • Achieving risk reduction, effectively
    • DOI 10.1205/psep.05083
    • Manuele, F. A. (2006). Achieving risk reduction, effectively. Process Safety and Environmental Protection, 84(3b), 184-190. (Pubitemid 43944393)
    • (2006) Process Safety and Environmental Protection , vol.84 , Issue.3 , pp. 184-190
    • Manuele, F.A.1
  • 17
    • 85030586522 scopus 로고    scopus 로고
    • Ministerio de Trabajo e Inmigración, Subsecretaría de Trabajo y Asuntos Sociales Accessed 15 September 2008
    • Ministerio de Trabajo e Inmigración, Subsecretaría de Trabajo y Asuntos Sociales. (2006). Estadística de accidentes de trabajo y enfermedades profesionales. Available at. http://www.mtas.es/Estadisticas/EAT/ welcome.htm Accessed 15 September 2008.
    • (2006) Estadística de Accidentes de Trabajo y Enfermedades Profesionales
  • 18
    • 1842842991 scopus 로고    scopus 로고
    • Safety and production: An integrated planning and control model
    • DOI 10.1080/0144619042000201367
    • Saurin, T. A., Formoso, C. T., & Guimaraes, L. B. M. (2004). Safety and production: An integrated planning and control model. Construction Management and Economics, 22(2), 159-169. (Pubitemid 38485473)
    • (2004) Construction Management and Economics , vol.22 , Issue.2 , pp. 159-169
    • Saurin, T.A.1    Formoso, C.T.2    Guimaraes, L.B.M.3
  • 19
    • 49149102966 scopus 로고    scopus 로고
    • An analysis of construction safety best practices from a cognitive systems engineering perspective
    • Saurin, T. A., Formoso, C.T., & Cambraia, F.B. (2008). An analysis of construction safety best practices from a cognitive systems engineering perspective. Safety Science, 46(8), 1169-1183.
    • (2008) Safety Science , vol.46 , Issue.8 , pp. 1169-1183
    • Saurin, T.A.1    Formoso, C.T.2    Cambraia, F.B.3
  • 20
    • 37249022845 scopus 로고    scopus 로고
    • Risk-based safety impact assessment methodology for underground construction projects in Korea
    • DOI 10.1061/(ASCE)0733-9364(2008)134:1(72)
    • Seo, J. W., & Choi, H. H. (2008). Risk-based safety impact assessment methodology for underground construction projects in Korea. Journal of Construction Engineering and Management, 134(1), 72-81. (Pubitemid 350265380)
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.1 , pp. 72-81
    • Seo, J.W.1    Choi, H.H.2
  • 21
    • 43049156434 scopus 로고    scopus 로고
    • The trajectories of prevention through design in construction
    • Toole, T. M., & Gambatese, J. A. (2008). The trajectories of prevention through design in construction. Journal of Safety Research, 39(2), 225-230.
    • (2008) Journal of Safety Research , vol.39 , Issue.2 , pp. 225-230
    • Toole, T.M.1    Gambatese, J.A.2
  • 22
    • 37249004155 scopus 로고    scopus 로고
    • Improved hazard identification for contractors in the construction industry
    • Trethewy, R. W., Atkinson, M., & Falls, B. (2003). Improved hazard identification for contractors in the construction industry. Journal of Construction Research, 4(1), 71-85.
    • (2003) Journal of Construction Research , vol.4 , Issue.1 , pp. 71-85
    • Trethewy, R.W.1    Atkinson, M.2    Falls, B.3
  • 23
    • 33644667825 scopus 로고    scopus 로고
    • Simulation-based safety evaluation model integrated with network schedule
    • DOI 10.1016/j.autcon.2005.06.015, PII S0926580505000804
    • Wang, W., Liu, J., & Chou, S. (2006). Simulation-based safety evaluation model integrated with network schedule. Automation in Construction, 15(3), 341-354. (Pubitemid 43332717)
    • (2006) Automation in Construction , vol.15 , Issue.3 , pp. 341-354
    • Wang, W.-C.1    Liu, J.-J.2    Chou, S.-C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.