메뉴 건너뛰기




Volumn 15, Issue 2, 2012, Pages 253-272

A fuzzy random resource-constrained scheduling model with multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project

Author keywords

Fuzzy random variable; Hybrid genetic algorithm; Multiple objective; Multiple project scheduling; Resource constrained

Indexed keywords

FUZZY RANDOM VARIABLE; HYBRID GENETIC ALGORITHMS; MULTIPLE OBJECTIVES; MULTIPLE PROJECT SCHEDULING; RESOURCE-CONSTRAINED;

EID: 79955031757     PISSN: 10946136     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10951-010-0173-1     Document Type: Article
Times cited : (42)

References (63)
  • 1
    • 35349024226 scopus 로고    scopus 로고
    • On solutions of fuzzy random multiobjective quadratic programming with applications in portfolio problem
    • Ammar, E. (2008). On solutions of fuzzy random multiobjective quadratic programming with applications in portfolio problem. Information Sciences, 178, 468-484.
    • (2008) Information Sciences , vol.178 , pp. 468-484
    • Ammar, E.1
  • 2
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • Aytug, H., Lawley, M., et al. (2005). Executing production schedules in the face of uncertainties: a review and some future directions. European Journal of Operational Research, 161, 86-110.
    • (2005) European Journal of Operational Research , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.2
  • 4
    • 84861230491 scopus 로고    scopus 로고
    • A theoretic and practical framework for scheduling in a stochastic environment
    • Bidot, J., Thierry, V., Philippe, L., & Christopher, J. (2008). A theoretic and practical framework for scheduling in a stochastic environment. Journal of Scheduling, 10, 41-65.
    • (2008) Journal of Scheduling , vol.10 , pp. 41-65
    • Bidot, J.1    Thierry, V.2    Philippe, L.3    Christopher, J.4
  • 6
    • 0032096810 scopus 로고    scopus 로고
    • A branch and bound algorithm for the resource-constrained project scheduling problem
    • Brucker, P., Knust, S., et al. (1998). A branch and bound algorithm for the resource-constrained project scheduling problem. European Journal of Operational Research, 107, 272-288.
    • (1998) European Journal of Operational Research , vol.107 , pp. 272-288
    • Brucker, P.1    Knust, S.2
  • 7
    • 0032736579 scopus 로고    scopus 로고
    • Resource constrained project scheduling: Notation, models and methods
    • Brucker, P., Drexl, A., et al. (1999). Resource constrained project scheduling: notation, models and methods. European Journal of Operational Research, 112, 3-41.
    • (1999) European Journal of Operational Research , vol.112 , pp. 3-41
    • Brucker, P.1    Drexl, A.2
  • 8
    • 33745213759 scopus 로고    scopus 로고
    • An effective hybrid algorithm for university course timetabling
    • Chiarandini, M., Birattari, M., et al. (2006). An effective hybrid algorithm for university course timetabling. Journal of Scheduling, 9, 403-432.
    • (2006) Journal of Scheduling , vol.9 , pp. 403-432
    • Chiarandini, M.1    Birattari, M.2
  • 9
    • 1942532245 scopus 로고    scopus 로고
    • Dynamic programming in a heuristically confined state space: A stochastic resourceconstrained project scheduling application
    • Choi, J., Realff, M. J., & Lee, J. H. (2004). Dynamic programming in a heuristically confined state space: a stochastic resourceconstrained project scheduling application. Computers and Chemical Engineering, 28, 1039-1058.
    • (2004) Computers and Chemical Engineering , vol.28 , pp. 1039-1058
    • Choi, J.1    Realff, M.J.2    Lee, J.H.3
  • 10
    • 0035272483 scopus 로고    scopus 로고
    • On the formalization of fuzzy random variables
    • Colubi, A., Domonguez-Menchero, J., et al. (2001). On the formalization of fuzzy random variables. Information Sciences, 133, 3-6.
    • (2001) Information Sciences , vol.133 , pp. 3-6
    • Colubi, A.1    Domonguez-Menchero, J.2
  • 11
    • 43149120446 scopus 로고    scopus 로고
    • Algorithms for multiprocessor scheduling with two job lengths and allocation restrictions
    • Detti, P. (2008). Algorithms for multiprocessor scheduling with two job lengths and allocation restrictions. Journal of Scheduling, 11, 205-212.
    • (2008) Journal of Scheduling , vol.11 , pp. 205-212
    • Detti, P.1
  • 12
    • 0026376478 scopus 로고
    • Scheduling of project networks by job assignment
    • Drexl, A. (1991). Scheduling of project networks by job assignment. Management Science, 37, 1590-1602.
    • (1991) Management Science , vol.37 , pp. 1590-1602
    • Drexl, A.1
  • 13
    • 23744492206 scopus 로고    scopus 로고
    • A single-period inventory model with fuzzy random variable demand
    • Dutta, P., Chakraborty, D., & Roy, A. (2005). A single-period inventory model with fuzzy random variable demand. Mathematical and Computer Modelling, 41, 915-922.
    • (2005) Mathematical and Computer Modelling , vol.41 , pp. 915-922
    • Dutta, P.1    Chakraborty, D.2    Roy, A.3
  • 14
    • 0012442701 scopus 로고    scopus 로고
    • Truncated branch bound, schedule-construction, for resource-constrained project scheduling
    • Franck, B., Neumann, K., & Schwindt, C. (2001). Truncated branch bound, schedule-construction, for resource-constrained project scheduling. OR Spektrum, 23, 297-324.
    • (2001) OR Spektrum , vol.23 , pp. 297-324
    • Franck, B.1    Neumann, K.2    Schwindt, C.3
  • 16
    • 11144332073 scopus 로고
    • A generalized network approach to project activity sequencing
    • Freeman, R. J. (1960b). A generalized network approach to project activity sequencing. IRE Transactions on Engineering Management, 7, 103-107.
    • (1960) IRE Transactions on Engineering Management , vol.7 , pp. 103-107
    • Freeman, R.J.1
  • 17
    • 0033692178 scopus 로고    scopus 로고
    • Managing multiple engineering projects in a manufacturing support environment
    • Fricke, S. E., & Shenhar, A. J. (2000). Managing multiple engineering projects in a manufacturing support environment. IEEE Transactions on Engineering Management, 17, 258-268.
    • (2000) IEEE Transactions on Engineering Management , vol.17 , pp. 258-268
    • Fricke, S.E.1    Shenhar, A.J.2
  • 20
    • 33748062355 scopus 로고    scopus 로고
    • Overview on the development of fuzzy random variables
    • Gil, M., Lopez-Diaz, M., & Ralescu, D. (2006). Overview on the development of fuzzy random variables. Fuzzy Sets and Systems, 157, 2546-2557.
    • (2006) Fuzzy Sets and Systems , vol.157 , pp. 2546-2557
    • Gil, M.1    Lopez-Diaz, M.2    Ralescu, D.3
  • 22
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: Survey and research potentials
    • Herroelen, W., & Leus, R. (2005). Project scheduling under uncertainty: survey and research potentials. European Journal of Operational Research, 165, 289-306.
    • (2005) European Journal of Operational Research , vol.165 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 24
    • 0029638856 scopus 로고
    • Single machines scheduling problem with fuzzy precedence relation
    • Ishii, H., & Tada, M. (1995). Single machines scheduling problem with fuzzy precedence relation. European Journal of Operational Research, 87, 284-288.
    • (1995) European Journal of Operational Research , vol.87 , pp. 284-288
    • Ishii, H.1    Tada, M.2
  • 25
    • 33745215820 scopus 로고    scopus 로고
    • Scheduling parallel jobs to minimize the makespan
    • Johannes, B. (2006). Scheduling parallel jobs to minimize the makespan. Journal of Scheduling, 9, 433-452.
    • (2006) Journal of Scheduling , vol.9 , pp. 433-452
    • Johannes, B.1
  • 26
    • 84861230491 scopus 로고    scopus 로고
    • A theoretic and practical framework for scheduling in a stochastic environment
    • Julien, B., Thierry, V., Philippe, L., & Christopher, J. (2008). A theoretic and practical framework for scheduling in a stochastic environment. Journal of Scheduling, 10, 41-65.
    • (2008) Journal of Scheduling , vol.10 , pp. 41-65
    • Julien, B.1    Thierry, V.2    Philippe, L.3    Christopher, J.4
  • 27
    • 13444278798 scopus 로고    scopus 로고
    • Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling
    • Kim, K., Yun, W., et al. (2005). Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling. Computers in Industry, 56, 143-160.
    • (2005) Computers in Industry , vol.56 , pp. 143-160
    • Kim, K.1    Yun, W.2
  • 28
    • 6344232554 scopus 로고
    • Fuzzy random variables, I: Definitions and theorems
    • Kwakernaak, H. (1978). Fuzzy random variables, I: definitions and theorems. Information Sciences, 1-29.
    • (1978) Information Sciences , pp. 1-29
    • Kwakernaak, H.1
  • 29
    • 26944480882 scopus 로고
    • Fuzzy random variables, II: Algorithms and examples for the discrete case
    • Kwakernaak, H. (1979). Fuzzy random variables, II: algorithms and examples for the discrete case. Information Sciences, 253-278.
    • (1979) Information Sciences , pp. 253-278
    • Kwakernaak, H.1
  • 31
    • 46149091092 scopus 로고    scopus 로고
    • A novel portfolio selection model in a hybrid uncertain environment
    • Li, J., & Xu, J. (2009). A novel portfolio selection model in a hybrid uncertain environment. The International Journal of Management Science, 37, 439-449.
    • (2009) The International Journal of Management Science , vol.37 , pp. 439-449
    • Li, J.1    Xu, J.2
  • 32
    • 33746868300 scopus 로고    scopus 로고
    • A class of multiobjective linear programming model with fuzzy random coefficients
    • Li, J., Xu, J., & Gen, M. (2006). A class of multiobjective linear programming model with fuzzy random coefficients. Mathematical and Computer Modelling, 44, 1097-1113.
    • (2006) Mathematical and Computer Modelling , vol.44 , pp. 1097-1113
    • Li, J.1    Xu, J.2    Gen, M.3
  • 33
    • 0042003111 scopus 로고    scopus 로고
    • Fuzzy random variables: A scalar expected value operator
    • Liu, Y., & Liu, B. (2003). Fuzzy random variables: a scalar expected value operator. Fuzzy Optimization and Decision Making, 143-160.
    • (2003) Fuzzy Optimization and Decision Making , pp. 143-160
    • Liu, Y.1    Liu, B.2
  • 34
    • 0002818342 scopus 로고
    • A fuzzy heuristic method for resourceconstrained project scheduling
    • Lorterapong, P. (1994). A fuzzy heuristic method for resourceconstrained project scheduling. Project Management Journal, 25, 12-18.
    • (1994) Project Management Journal , vol.25 , pp. 12-18
    • Lorterapong, P.1
  • 35
    • 33646096171 scopus 로고    scopus 로고
    • Combining random sampling and backward-forward heuristics for resource-constrained multiproject scheduling
    • Lova, A., & Tormos, P. (2002). Combining random sampling and backward-forward heuristics for resource-constrained multiproject scheduling. In Proceedings of the 8th conference on project management and scheduling (pp. 244-248).
    • (2002) Proceedings of the 8th Conference on Project Management and Scheduling , pp. 244-248
    • Lova, A.1    Tormos, P.2
  • 36
    • 0034559445 scopus 로고    scopus 로고
    • Analysis of scheduling schemes & heuristic rules performance in resource-constrained multiple project scheduling
    • Lova, A., Maroto, C., & Tormos, P. (2000). Analysis of scheduling schemes & heuristic rules performance in resource-constrained multiple project scheduling. Annals of Operations Research, 102, 408-424.
    • (2000) Annals of Operations Research , vol.102 , pp. 408-424
    • Lova, A.1    Maroto, C.2    Tormos, P.3
  • 37
    • 0001054388 scopus 로고
    • Multiple objective programming problems with possibility coefficients
    • Luhandjula, M. (1987). Multiple objective programming problems with possibility coefficients. Fuzzy Sets and Systems, 21, 135-145.
    • (1987) Fuzzy Sets and Systems , vol.21 , pp. 135-145
    • Luhandjula, M.1
  • 43
    • 0001497209 scopus 로고
    • Using fuzzy set theory in a scheduling problem: A case study
    • Prade, H. (1979). Using fuzzy set theory in a scheduling problem: a case study. Fuzzy Sets and Systems, 2, 153-165.
    • (1979) Fuzzy Sets and Systems , vol.2 , pp. 153-165
    • Prade, H.1
  • 45
    • 0030151249 scopus 로고    scopus 로고
    • A heuristic approach to n/m job shop fuzzy dynamic scheduling algorithms
    • Roy, U., & Zhang, X. (1996). A heuristic approach to n/m job shop fuzzy dynamic scheduling algorithms. Production Planning and Control, 7, 299-311.
    • (1996) Production Planning and Control , vol.7 , pp. 299-311
    • Roy, U.1    Zhang, X.2
  • 47
    • 0006089090 scopus 로고
    • A new fuzzy time-series model of fuzzy number observations
    • Song, Q., Leland, R., & Chissom, B. (1995). A new fuzzy time-series model of fuzzy number observations. Fuzzy Sets and Systems, 73, 341-348.
    • (1995) Fuzzy Sets and Systems , vol.73 , pp. 341-348
    • Song, Q.1    Leland, R.2    Chissom, B.3
  • 48
    • 0028462006 scopus 로고
    • A comparison of fuzzy forecasting and Markov modeling
    • Sullivan, J., & Woodall, W. (1994). A comparison of fuzzy forecasting and Markov modeling. Fuzzy Sets and Systems, 64, 279-293.
    • (1994) Fuzzy Sets and Systems , vol.64 , pp. 279-293
    • Sullivan, J.1    Woodall, W.2
  • 50
    • 0034675403 scopus 로고    scopus 로고
    • Optimal planning in large multi-site production networks
    • Timpe, C., & Kallrath, J. (2000). Optimal planning in large multi-site production networks. European Journal of Operational Research, 126, 422-435.
    • (2000) European Journal of Operational Research , vol.126 , pp. 422-435
    • Timpe, C.1    Kallrath, J.2
  • 51
    • 0035617605 scopus 로고    scopus 로고
    • A competitive heuristic solution technique for resource-constrained project shedding
    • Tormos, P., & Lova, A. (2001). A competitive heuristic solution technique for resource-constrained project shedding. Annals of Operations Research, 102, 65-81.
    • (2001) Annals of Operations Research , vol.102 , pp. 65-81
    • Tormos, P.1    Lova, A.2
  • 52
    • 0028517491 scopus 로고
    • Constrained multi-project planning problems: A Lagrangean decomposition approach
    • Vercellis, C. (1994). Constrained multi-project planning problems: a Lagrangean decomposition approach. European Journal of Operational Research, 78, 267-275.
    • (1994) European Journal of Operational Research , vol.78 , pp. 267-275
    • Vercellis, C.1
  • 53
    • 19744379632 scopus 로고    scopus 로고
    • The use of buffers in project management: The trade-off between stability and makespan
    • Vonder, V., Demeulemeester, S., et al. (2005). The use of buffers in project management: the trade-off between stability and makespan. International Journal of Production Economics, 97, 227-240.
    • (2005) International Journal of Production Economics , vol.97 , pp. 227-240
    • Vonder, V.1    Demeulemeester, S.2
  • 54
    • 70349161575 scopus 로고    scopus 로고
    • Fuzzy random renewal reward process and its applications
    • Wang, S., & Watada, J. (2009). Fuzzy random renewal reward process and its applications. Information Sciences, 179, 4057-4069.
    • (2009) Information Sciences , vol.179 , pp. 4057-4069
    • Wang, S.1    Watada, J.2
  • 57
    • 43849106075 scopus 로고    scopus 로고
    • Multi-objective decision making model under fuzzy random environment and its application to inventory problems
    • Xu, J., & Liu, Y. (2008). Multi-objective decision making model under fuzzy random environment and its application to inventory problems. Information Sciences, 178, 2899-2914.
    • (2008) Information Sciences , vol.178 , pp. 2899-2914
    • Xu, J.1    Liu, Y.2
  • 60
    • 49349133217 scopus 로고
    • Fuzzy sets as a basis for a theory of possibility
    • Zadeh, L. A. (1978). Fuzzy sets as a basis for a theory of possibility. Fuzzy Sets and Systems, 1, 3-28.
    • (1978) Fuzzy Sets and Systems , vol.1 , pp. 3-28
    • Zadeh, L.A.1
  • 62
    • 34249910303 scopus 로고    scopus 로고
    • A two-stage stochastic programming approach for project planning with uncertain activity durations
    • Zhu, G., Bard, J., & Yu, G. (2007). A two-stage stochastic programming approach for project planning with uncertain activity durations. Journal of Scheduling, 10, 167-180.
    • (2007) Journal of Scheduling , vol.10 , pp. 167-180
    • Zhu, G.1    Bard, J.2    Yu, G.3
  • 63
    • 49349136235 scopus 로고
    • Fuzzy linear programming with several objective functions
    • Zimmermann, H. J. (1978). Fuzzy linear programming with several objective functions. Fuzzy Sets and System, 1, 46-55.
    • (1978) Fuzzy Sets and System , vol.1 , pp. 46-55
    • Zimmermann, H.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.