1
-
-
0024640250
-
Computer aided process planning: The state-of-the-art survey
-
Alting, L., and, H. Zhang. 1989. " Computer Aided Process Planning: The State-of-the-Art Survey." International Journal of Production Research 27 (4): 553-585. doi: 10.1080/00207548908942569
-
(1989)
International Journal of Production Research
, vol.27
, Issue.4
, pp. 553-585
-
-
Alting, L.1
Zhang, H.2
-
2
-
-
0033742932
-
Selection of cutting tools and conditions of machining operations using an expert system
-
Arezoo, B., K. Ridgway, and, A. M. A. Al-Ahmari. 2000. " Selection of Cutting Tools and Conditions of Machining Operations Using an Expert System." Computers in Industry 42: 43-58. doi: 10.1016/S0166-3615(99)00051-2
-
(2000)
Computers in Industry
, vol.42
, pp. 43-58
-
-
Arezoo, B.1
Ridgway, K.2
Al-Ahmari, A.M.A.3
-
4
-
-
84874540167
-
A taxonomy of line balancing problems and their solution approaches
-
Battaïa, O., and, A. Dolgui. 2013. " A Taxonomy of Line Balancing Problems and their Solution Approaches." International Journal of Production Economics 142 (2): 259-277. doi: 10.1016/j.ijpe.2012.10.020
-
(2013)
International Journal of Production Economics
, vol.142
, Issue.2
, pp. 259-277
-
-
Battaïa, O.1
Dolgui, A.2
-
5
-
-
84903308553
-
Integrated configurable equipment selection and line balancing for mass production with serial-parallel machining systems
-
Battaïa, O., A. Dolgui, N. Guschinsky, and, G. Levin. 2014. " Integrated Configurable Equipment Selection and Line Balancing for Mass Production with Serial-Parallel Machining Systems." Engineering Optimization 46 (10): 1369-1388. doi: 10.1080/0305215X.2013.841904
-
(2014)
Engineering Optimization
, vol.46
, Issue.10
, pp. 1369-1388
-
-
Battaïa, O.1
Dolgui, A.2
Guschinsky, N.3
Levin, G.4
-
6
-
-
1642634467
-
A decomposition approach for an equipment selection and multiple product routing problem incorporating environmental factors
-
Bennett, D. P., and, C. A. Yano. 2004. " A Decomposition Approach for an Equipment Selection and Multiple Product Routing Problem Incorporating Environmental Factors." European Journal of Operational Research 156: 643-664. doi: 10.1016/S0377-2217(03)00138-3
-
(2004)
European Journal of Operational Research
, vol.156
, pp. 643-664
-
-
Bennett, D.P.1
Yano, C.A.2
-
8
-
-
0037230929
-
A weighted approach for assembly line design with station paralleling and equipment selection
-
Bukchin, J., and, J. Rubinovitz. 2003. " A Weighted Approach for Assembly Line Design with Station Paralleling and Equipment Selection." IIE Transactions 35: 73-85. doi: 10.1080/07408170304429
-
(2003)
IIE Transactions
, vol.35
, pp. 73-85
-
-
Bukchin, J.1
Rubinovitz, J.2
-
9
-
-
0033750053
-
Design of flexible assembly line to minimize equipment cost
-
Bukchin, J., and, M. Tzur. 2000. " Design of Flexible Assembly Line to Minimize Equipment Cost." IIE Transactions 32: 585-598
-
(2000)
IIE Transactions
, vol.32
, pp. 585-598
-
-
Bukchin, J.1
Tzur, M.2
-
10
-
-
0039185657
-
Models and methods of multiprojects' management
-
Burkov, V. N., and, D. A. Novikov. 1999. " Models and Methods of Multiprojects' Management." Systems Science 25b (2): 5-14
-
(1999)
Systems Science
, vol.25 B
, Issue.2
, pp. 5-14
-
-
Burkov, V.N.1
Novikov, D.A.2
-
11
-
-
5644246437
-
Scheduling a batch-processing machine subject to precedence constraints, release dates and identical processing times
-
Cheng, T. C. E., J. J. Yuan, and, A. F. Yang. 2005. " Scheduling a Batch-processing Machine Subject to Precedence Constraints, Release Dates and Identical Processing Times." Computers & Operations Research 32: 849-859. doi: 10.1016/j.cor.2003.09.001
-
(2005)
Computers & Operations Research
, vol.32
, pp. 849-859
-
-
Cheng, T.C.E.1
Yuan, J.J.2
Yang, A.F.3
-
12
-
-
80053350254
-
Single machine scheduling with precedence constraints and positionally dependent processing times
-
Dolgui, A., V. Gordon, and, V. Strusevich. 2012. " Single Machine Scheduling with Precedence Constraints and Positionally Dependent Processing Times." Computers & Operations Research 39: 1218-1224. doi: 10.1016/j.cor.2010.06.004
-
(2012)
Computers & Operations Research
, vol.39
, pp. 1218-1224
-
-
Dolgui, A.1
Gordon, V.2
Strusevich, V.3
-
13
-
-
25144474660
-
A special case of transfer lines balancing by graph approach
-
Dolgui, A., N. Guschinsky, and, G. Levin. 2006. " A Special Case of Transfer Lines Balancing by Graph Approach." European Journal of Operational Research 168: 732-746. doi: 10.1016/j.ejor.2004.07.025
-
(2006)
European Journal of Operational Research
, vol.168
, pp. 732-746
-
-
Dolgui, A.1
Guschinsky, N.2
Levin, G.3
-
14
-
-
0027302081
-
Hierarchical models for multi-project planning and scheduling
-
Grazia Speranza, M., and, C. Vercellis. 1993. " Hierarchical Models for Multi-project Planning and Scheduling." European Journal of Operational Research 64 (2): 312-325. doi: 10.1016/0377-2217(93)90185-P
-
(1993)
European Journal of Operational Research
, vol.64
, Issue.2
, pp. 312-325
-
-
Grazia Speranza, M.1
Vercellis, C.2
-
15
-
-
33746357611
-
Optimization of due-date objectives in scheduling semiconductor batch manufacturing
-
Gupta, A. K., and, A. I. Sivakumar. 2006. " Optimization of Due-date Objectives in Scheduling Semiconductor Batch Manufacturing." International Journal of Machine Tools and Manufacture 46: 1671-1679. doi: 10.1016/j.ijmachtools.2005.08.017
-
(2006)
International Journal of Machine Tools and Manufacture
, vol.46
, pp. 1671-1679
-
-
Gupta, A.K.1
Sivakumar, A.I.2
-
17
-
-
78651525267
-
Genetic algorithms for optimization of resource allocation in large scale construction project management
-
Huang, J., X. Wang, and, R. Chen. 2010. " Genetic Algorithms for Optimization of Resource Allocation in Large Scale Construction Project Management." Journal of Computers 5 (12): 1916-1924. doi: 10.4304/jcp.5.12.1916-1924
-
(2010)
Journal of Computers
, vol.5
, Issue.12
, pp. 1916-1924
-
-
Huang, J.1
Wang, X.2
Chen, R.3
-
18
-
-
46149104167
-
Line balancing and model sequencing to reduce work overload in mixed-model u-line production environments
-
Kara, Y. 2008. " Line Balancing and Model Sequencing to Reduce Work Overload in Mixed-model U-line Production Environments." Engineering Optimization 40 (7): 669-684. doi: 10.1080/03052150801982509
-
(2008)
Engineering Optimization
, vol.40
, Issue.7
, pp. 669-684
-
-
Kara, Y.1
-
19
-
-
80053023922
-
Balancing straight and u-shaped assembly lines with resource dependent task times
-
Kara, Y., C. Ozguven, N. Yalcin, and, Y. Atasagun. 2011. " Balancing Straight and U-shaped Assembly Lines with Resource Dependent Task Times." International Journal of Production Research 49 (21): 6387-6405. doi: 10.1080/00207543.2010.535039
-
(2011)
International Journal of Production Research
, vol.49
, Issue.21
, pp. 6387-6405
-
-
Kara, Y.1
Ozguven, C.2
Yalcin, N.3
Atasagun, Y.4
-
21
-
-
84866097972
-
-
Proceedings of the 14th IFAC Symposium on Information Control Problems in Manufacturing (INCOM12), Bucharest, Romania, May 23-25. T. Borangiu, I. Dumitrache, A. Dolgui, & F. Filip (Eds.), Elsevier Science, IFAC-PapersOnline.net (ISSN 1474-6670
-
Levin, G., B. Rozin, and, A. Dolgui. 2012. "Optimization of Multi-tool Cutting Modes for Batch Manufacturing in Large Series Machining Environment." Proceedings of the 14th IFAC Symposium on Information Control Problems in Manufacturing (INCOM12), Bucharest, Romania, May 23-25. T. Borangiu, I. Dumitrache, A. Dolgui, & F. Filip (Eds.), Elsevier Science, IFAC-PapersOnline.net (ISSN 1474-6670): 444-448
-
(2012)
Optimization of Multi-tool Cutting Modes for Batch Manufacturing in Large Series Machining Environment
, pp. 444-448
-
-
Levin, G.1
Rozin, B.2
Dolgui, A.3
-
22
-
-
33644643502
-
Line balancing and simulation of an automated production transfer line
-
Masood, S. 2006. " Line Balancing and Simulation of an Automated Production Transfer Line." Assembly Automation 26: 69-74. doi: 10.1108/01445150610645684
-
(2006)
Assembly Automation
, vol.26
, pp. 69-74
-
-
Masood, S.1
-
23
-
-
84893959191
-
Balancing transfer lines using benders decomposition and ant colony optimisation techniques
-
Osman, H., and, M. F. Baki. 2014. " Balancing Transfer Lines Using Benders Decomposition and Ant Colony Optimisation Techniques." International Journal of Production Research 52 (5): 1334-1350. doi: 10.1080/00207543.2013.842017
-
(2014)
International Journal of Production Research
, vol.52
, Issue.5
, pp. 1334-1350
-
-
Osman, H.1
Baki, M.F.2
-
25
-
-
52049109705
-
Flowshop scheduling problem with a batching machine and task compatibilities
-
Oulamara, A., G. Finke, and, A. Kamgaing Kuiteing. 2009. " Flowshop Scheduling Problem with a Batching Machine and Task Compatibilities." Computers & Operations Research 36: 391-401. doi: 10.1016/j.cor.2007.10.006
-
(2009)
Computers & Operations Research
, vol.36
, pp. 391-401
-
-
Oulamara, A.1
Finke, G.2
Kamgaing Kuiteing, A.3
-
26
-
-
0042403537
-
Optimization of resource allocation in project planning
-
Petrovich, R. 1968. " Optimization of Resource Allocation in Project Planning." Operations Research 16: 559-568. doi: 10.1287/opre.16.3.559
-
(1968)
Operations Research
, vol.16
, pp. 559-568
-
-
Petrovich, R.1
-
27
-
-
0036966648
-
State of art of optimization methods for assembly line design
-
Rekiek, B., A. Dolgui, A. Delchambre, and, A. Bratcu. 2002. " State of Art of Optimization Methods for Assembly Line Design." Annual Reviews in Control 26 (2): 163-174. doi: 10.1016/S1367-5788(02)00027-5
-
(2002)
Annual Reviews in Control
, vol.26
, Issue.2
, pp. 163-174
-
-
Rekiek, B.1
Dolgui, A.2
Delchambre, A.3
Bratcu, A.4
-
28
-
-
0036489508
-
Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed
-
Sung, C. S., and, Y. H. Kim. 2002. " Minimizing Makespan in a Two-Machine Flowshop with Dynamic Arrivals Allowed." Computers and Operations Research 29: 275-294. doi: 10.1016/S0305-0548(00)00071-X
-
(2002)
Computers and Operations Research
, vol.29
, pp. 275-294
-
-
Sung, C.S.1
Kim, Y.H.2
-
29
-
-
11344255899
-
An approach to machining process optimization
-
Szadkowski, J. 1971. " An Approach to Machining Process Optimization." International Journal of Production Research 9 (3): 371-376. doi: 10.1080/00207547108929887
-
(1971)
International Journal of Production Research
, vol.9
, Issue.3
, pp. 371-376
-
-
Szadkowski, J.1
-
30
-
-
33750706981
-
-
Proceedings of the IFAC Symposium on Manufacturing, Modeling, Management and Control. Vienna, Austria: Elsevier
-
Szadkowski, J. 1997. "Critical Path Concept for Multi-tool Cutting Processes Optimization." Proceedings of the IFAC Symposium on Manufacturing, Modeling, Management and Control. Vienna, Austria: Elsevier: 393-398
-
(1997)
Critical Path Concept for Multi-tool Cutting Processes Optimization
, pp. 393-398
-
-
Szadkowski, J.1
-
31
-
-
77949810686
-
Designing manufacturing flexibility in dynamic production contexts
-
In, edited by T. Tolio Berlin, Heidelberg: Springer
-
Terkaj, W., T. Tolio, and, A. Valente. 2009. " Designing Manufacturing Flexibility in Dynamic Production Contexts." In Design of Flexible Production Systems, edited by T. Tolio., 1-18. Berlin, Heidelberg: Springer
-
(2009)
Design of Flexible Production Systems
, pp. 1-18
-
-
Terkaj, W.1
Tolio, T.2
Valente, A.3
-
32
-
-
84875274638
-
Design of flexible transfer lines: A case-based reconfiguration cost assessment
-
Tolio, T., and, M. Urgo. 2013. " Design of Flexible Transfer Lines: A Case-based Reconfiguration Cost Assessment." Journal of Manufacturing Systems 32: 325-334. doi: 10.1016/j.jmsy.2012.12.003
-
(2013)
Journal of Manufacturing Systems
, vol.32
, pp. 325-334
-
-
Tolio, T.1
Urgo, M.2
|