메뉴 건너뛰기




Volumn 46, Issue 10, 2014, Pages 1369-1388

Integrated configurable equipment selection and line balancing for mass production with serial-parallel machining systems

Author keywords

combinatorial optimization; decomposition approach; equipment selection; line balancing; production system design

Indexed keywords

COMBINATORIAL OPTIMIZATION; EQUIPMENT; MATHEMATICAL MODELS;

EID: 84903308553     PISSN: 0305215X     EISSN: 10290273     Source Type: Journal    
DOI: 10.1080/0305215X.2013.841904     Document Type: Article
Times cited : (23)

References (29)
  • 1
    • 84856101184 scopus 로고    scopus 로고
    • Reduction approaches for a generalized line balancing problem
    • Battaïa, O., and A. Dolgui. 2012. "Reduction Approaches for a Generalized Line Balancing Problem." Computers Operations Research 39: 2337-2345.
    • (2012) Computers Operations Research , vol.39 , pp. 2337-2345
    • Battaïa, O.1    Dolgui, A.2
  • 2
    • 84874540167 scopus 로고    scopus 로고
    • A taxonomy of line balancing problems and their solution approaches
    • Battaïa, O., and A. Dolgui. 2013. "ATaxonomy of Line Balancing Problems and their Solution Approaches." International Journal of Production Economics 142: 259-277.
    • (2013) Ternational Journal of Production Economics , vol.142 , pp. 259-277
    • Battaïa, O.1    Dolgui, A.2
  • 3
    • 84860849485 scopus 로고    scopus 로고
    • A decision support system for design of mass production machining lines composed of stations with rotary or mobile table
    • Battaïa, O., A. Dolgui, N. Guschinsky, and G. Levin. 2012a. "A Decision Support System for Design of Mass Production Machining Lines Composed of Stations with Rotary or Mobile Table." Robotics and Computer-Integrated Manufacturing 28: 672-680.
    • (2012) Robotics and Computer-Integrated Manufacturing , vol.28 , pp. 672-680
    • Battaïa, O.1    Dolgui, A.2    Guschinsky, N.3    Levin, G.4
  • 6
    • 34249995941 scopus 로고    scopus 로고
    • A classification of assembly line balancing problems
    • DOI 10.1016/j.ejor.2006.10.010, PII S0377221706010435
    • Boysen, N., M. Fliedner, andA. Scholl. 2007. "AClassification ofAssembly Line Balancing Problems." European Journal of Operational Research 183 (2): 674-693. (Pubitemid 46891133)
    • (2007) European Journal of Operational Research , vol.183 , Issue.2 , pp. 674-693
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 7
    • 0037230929 scopus 로고    scopus 로고
    • A weighted approach for assembly line design with station paralleling and equipment selection
    • Bukchin, J., and J. Rubinovitz. 2003. "A Weighted Approach for Assembly Line Design with Station Paralleling and Equipment Selection." IIE Transactions 35: 73-85.
    • (2003) IIE Transactions , vol.35 , pp. 73-85
    • Bukchin, J.1    Rubinovitz, J.2
  • 8
    • 0033750053 scopus 로고    scopus 로고
    • Design of flexible assembly line to minimize equipment cost
    • Bukchin, J., and M. Tzur. 2000. "Design of Flexible Assembly Line to Minimize Equipment Cost." IIE Transactions 32: 585-598.
    • (2000) IIE Transactions , vol.32 , pp. 585-598
    • Bukchin, J.1    Tzur, M.2
  • 10
    • 33746844491 scopus 로고    scopus 로고
    • Balancing large-scale machining lines with multi-spindle heads using decomposition
    • DOI 10.1080/00207540600632232, PII R763200356248786
    • Dolgui, A., B. Finel, O. Guschinskaya, N. Guschinsky, G. Levin, and F. Vernadat. 2006a. "Balancing Large-Scale Machining Lines with Multi-Spindle Heads Using Decomposition." International Journal of Production Research 44 (18-19): 4105-4120. (Pubitemid 44181139)
    • (2006) International Journal of Production Research , vol.44 , Issue.18-19 , pp. 4105-4120
    • Dolgui, A.1    Finel, B.2    Guschinskaya, O.3    Guschinsky, N.4    Levin, G.5    Vernadat, F.6
  • 12
    • 56749150315 scopus 로고    scopus 로고
    • Graph approach for optimal design of transfer machine with rotary table
    • Dolgui, A., N. Guschinsky, and G. Levin. 2009. "Graph Approach for Optimal Design of Transfer Machine with Rotary Table." International Journal of Production Research 47 (2): 321-341.
    • (2009) Ternational Journal of Production Research , vol.47 , Issue.2 , pp. 321-341
    • Dolgui, A.1    Guschinsky, N.2    Levin, G.3
  • 13
    • 62149119493 scopus 로고    scopus 로고
    • Branch and bound algorithm for a transfer line design problem: Stations with sequentially activated multi-spindle heads
    • Dolgui, A., and I. Ihnatsenka. 2009. "Branch and Bound Algorithm for a Transfer Line Design Problem: Stations with Sequentially Activated Multi-Spindle Heads." European Journal of Operational Research 197 (3): 1119-1132.
    • (2009) European Journal of Operational Research , vol.197 , Issue.3 , pp. 1119-1132
    • Dolgui, A.1    Ihnatsenka, I.2
  • 14
    • 67651160370 scopus 로고    scopus 로고
    • Comparison of exact and heuristic methods for a transfer line balancing problem
    • Guschinskaya, O., and A. Dolgui. 2009. "Comparison of Exact and Heuristic Methods for a Transfer Line Balancing Problem." International Journal of Production Economics 120 (2): 276-286.
    • (2009) Ternational Journal of Production Economics , vol.120 , Issue.2 , pp. 276-286
    • Guschinskaya, O.1    Dolgui, A.2
  • 15
    • 40849119751 scopus 로고    scopus 로고
    • A heuristic multi-start decomposition approach for optimal design of serial machining lines
    • DOI 10.1016/j.ejor.2006.03.072, PII S0377221707006650
    • Guschinskaya, O., A. Dolgui, N. Guschinsky, and G. Levin. 2008. "A Heuristic Multi-Start Decomposition Approach for Optimal Design of Serial Machining Lines." European Journal of Operational Research 189 (3): 902-913. (Pubitemid 351400585)
    • (2008) European Journal of Operational Research , vol.189 , Issue.3 , pp. 902-913
    • Guschinskaya, O.1    Dolgui, A.2    Guschinsky, N.3    Levin, G.4
  • 18
    • 46149104167 scopus 로고    scopus 로고
    • Line balancing and model sequencing to reduce work overload in mixed-model u-line production environments
    • Kara, Y. 2008. "Line Balancing and Model Sequencing to Reduce Work Overload in Mixed-Model U-Line Production Environments." Engineering Optimization 40: 669-684.
    • (2008) Engineering Optimization , vol.40 , pp. 669-684
    • Kara, Y.1
  • 19
    • 25144479417 scopus 로고    scopus 로고
    • A genetic algorithm for robotic assembly line balancing
    • DOI 10.1016/j.ejor.2004.07.030, PII S0377221704004874, Balancing Assembly and Transfer Lines
    • Levitin, G., J. Rubinovitz, and B. Shnits. 2006. "A Genetic Algorithm for Robotic Assembly Line Balancing." European Journal of Operations Research 168 (3): 811-825. (Pubitemid 41336594)
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 811-825
    • Levitin, G.1    Rubinovitz, J.2    Shnits, B.3
  • 20
    • 80054708815 scopus 로고    scopus 로고
    • Automatic generation of assembly system configuration with equipment selection for automotive battery manufacturing
    • Li, S., H. Wang, S. Hu, Y. Lin, and J. Abell. 2011. "Automatic Generation of Assembly System Configuration with Equipment Selection for Automotive Battery Manufacturing." Journal of Manufacturing Systems 30: 188-195.
    • (2011) Journal of Manufacturing Systems , vol.30 , pp. 188-195
    • Li, S.1    Wang, H.2    Hu, S.3    Lin, Y.4    Abell, J.5
  • 21
    • 79951937231 scopus 로고    scopus 로고
    • An integrated approach to evaluating assembly-line design alternatives with equipment selection
    • Özdemir, R., and Z. Aya?g. 2011. "An Integrated Approach to Evaluating Assembly-Line Design Alternatives with Equipment Selection." Production Planning and Control 22: 194-206.
    • (2011) Production Planning and Control , vol.22 , pp. 194-206
    • Özdemir, R.1    Ayag, Z.2
  • 22
    • 53349177071 scopus 로고    scopus 로고
    • Bi criteria flexible assembly line design problem with equipment decisions
    • Pekin, N., and M. Azizoglu. 2008. "Bi Criteria Flexible Assembly Line Design Problem with Equipment Decisions." International Journal of Production Research 46 (22): 6323-6343.
    • (2008) Ternational Journal of Production Research , vol.46 , Issue.22 , pp. 6323-6343
    • Pekin, N.1    Azizoglu, M.2
  • 24
    • 0037139671 scopus 로고    scopus 로고
    • Hybrid assembly line design and user's preferences
    • DOI 10.1080/00207540110116264
    • Rekiek, B., P. De Lit, and A. Delchambre. 2002. "Hybrid Assembly Line Design and User's Preferences." International Journal of Production Research 40: 1095-1111. (Pubitemid 34593789)
    • (2002) International Journal of Production Research , vol.40 , Issue.5 , pp. 1095-1111
    • Rekiek, B.1    De Lit, P.2    Delchambre, A.3
  • 27
    • 38949169513 scopus 로고    scopus 로고
    • A fuzzy goal programming model for the simple U-line balancing problem with multiple objectives
    • DOI 10.1080/03052150701651642, PII 790494261
    • Toklu, B., and U. Özcan. 2008. "A Fuzzy Goal Programming Model for the Simple U-Line Balancing Problem with Multiple Objectives." Engineering Optimization 40 (3): 191-204. (Pubitemid 351230571)
    • (2008) Engineering Optimization , vol.40 , Issue.3 , pp. 191-204
    • Toklu, B.1    Ozcan, U.2
  • 29
    • 12844277355 scopus 로고    scopus 로고
    • Automated generation of assembly system-design solutions
    • DOI 10.1109/TASE.2004.840072
    • Webbink, R. F., and S. J. Hu. 2005. "Automated Generation of Assembly System-Design Solutions." IEEE Transactions on Automation Science and Engineering 2 (1): 32-39. (Pubitemid 40162873)
    • (2005) IEEE Transactions on Automation Science and Engineering , vol.2 , Issue.1 , pp. 32-39
    • Webbink, R.F.1    Hu, S.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.