메뉴 건너뛰기




Volumn 26, Issue 1, 2006, Pages 69-74

Line balancing and simulation of an automated production transfer line

Author keywords

Line management; Machining centres; Process planning; Transfer processes

Indexed keywords

AUTOMOBILE PARTS AND EQUIPMENT; OPTIMIZATION; PROCESS CONTROL; PRODUCTION; PRODUCTIVITY;

EID: 33644643502     PISSN: 01445154     EISSN: None     Source Type: Trade Journal    
DOI: 10.1108/01445150610645684     Document Type: Article
Times cited : (44)

References (8)
  • 1
    • 0031270224 scopus 로고    scopus 로고
    • "A parallel station heuristic for the mixed-model production line balancing problem"
    • Askin, R.G. and Zhou, M. (1997), "A parallel station heuristic for the mixed-model production line balancing problem", International Journal of Production Research, Vol. 35 No. 11, pp. 3095-105.
    • (1997) International Journal of Production Research , vol.35 , Issue.11 , pp. 3095-3105
    • Askin, R.G.1    Zhou, M.2
  • 4
    • 0036538669 scopus 로고    scopus 로고
    • "Balancing and scheduling mixed-model U-shaped production lines"
    • Miltenburg, J. (2002), "Balancing and scheduling mixed-model U-shaped production lines", International Journal of Flexible Manufacturing Systems, Vol. 14 No. 3, pp. 123-55.
    • (2002) International Journal of Flexible Manufacturing Systems , vol.14 , Issue.3 , pp. 123-155
    • Miltenburg, J.1
  • 5
    • 0002569892 scopus 로고
    • "A heuristic method of assembly line balancing for assumptions of constant or variable work element times"
    • Moodie, C.L. and Young, H.H. (1965), "A heuristic method of assembly line balancing for assumptions of constant or variable work element times", Journal of Industrial Engineering, Vol. 16 No. 1, pp. 23-9.
    • (1965) Journal of Industrial Engineering , vol.16 , Issue.1 , pp. 23-29
    • Moodie, C.L.1    Young, H.H.2
  • 7
    • 0037091985 scopus 로고    scopus 로고
    • "A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations"
    • Vilarinho, P.M. and Simaria, A.S. (2002), "A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations", International Journal of Production Research, Vol. 40 No. 6, pp. 1405-20.
    • (2002) International Journal of Production Research , vol.40 , Issue.6 , pp. 1405-1420
    • Vilarinho, P.M.1    Simaria, A.S.2
  • 8
    • 0033745065 scopus 로고    scopus 로고
    • "Genetic production line-balancing for the hard disk drive industry"
    • Zhao, Z.Y. and De Souza, R. (2000), "Genetic production line-balancing for the hard disk drive industry", Int. J. of Advanced Manufacturing Technology, Vol. 16 No. 4, pp. 297-302.
    • (2000) Int. J. of Advanced Manufacturing Technology , vol.16 , Issue.4 , pp. 297-302
    • Zhao, Z.Y.1    De Souza, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.