-
1
-
-
79751526499
-
Optimum policy in hybrid manufacturing/remanufacturing system
-
Wang J, Zhao J, Wang X (2011) Optimum policy in hybrid manufacturing/remanufacturing system. Comput Ind Eng 60(3):411–419
-
(2011)
Comput Ind Eng
, vol.60
, Issue.3
, pp. 411-419
-
-
Wang, J.1
Zhao, J.2
Wang, X.3
-
2
-
-
84905565287
-
A review of the state of the art in tools and techniques used to evaluate remanufacturing feasibility
-
Goodall P, Rosamond E, Harding J (2014) A review of the state of the art in tools and techniques used to evaluate remanufacturing feasibility. J Clean Prod 81:1–15
-
(2014)
J Clean Prod
, vol.81
, pp. 1-15
-
-
Goodall, P.1
Rosamond, E.2
Harding, J.3
-
3
-
-
79951581836
-
Implementing extended producer responsibility: vehicle remanufacturing in china
-
Xiang W, Ming C (2011) Implementing extended producer responsibility: vehicle remanufacturing in china. J Clean Prod 19(6–7):680–686
-
(2011)
J Clean Prod
, vol.19
, Issue.6-7
, pp. 680-686
-
-
Xiang, W.1
Ming, C.2
-
4
-
-
79960922186
-
Sustainability through remanufacturing in India: a case study on mobile handsets
-
Rathore P, Kota S, Chakrabarti A (2011) Sustainability through remanufacturing in India: a case study on mobile handsets. J Clean Prod 19(15):1709–1722
-
(2011)
J Clean Prod
, vol.19
, Issue.15
, pp. 1709-1722
-
-
Rathore, P.1
Kota, S.2
Chakrabarti, A.3
-
5
-
-
0142087780
-
Remanufacturing: the next great opportunity for boosting us productivity
-
Giuntini R, Gaudette K (2003) Remanufacturing: the next great opportunity for boosting us productivity. Bus Horiz 46(6):41–48
-
(2003)
Bus Horiz
, vol.46
, Issue.6
, pp. 41-48
-
-
Giuntini, R.1
Gaudette, K.2
-
6
-
-
85018217457
-
An analysis of remanufacturing practices in Japan
-
Matsumoto M, Umeda Y (2011) An analysis of remanufacturing practices in Japan. J Remanuf 1(2):1–11
-
(2011)
J Remanuf
, vol.1
, Issue.2
, pp. 1-11
-
-
Matsumoto, M.1
Umeda, Y.2
-
7
-
-
84878919618
-
Remanufacturing in Brazil: case studies on the automotive sector
-
Saavedra Y, Barquet APB, Rozenfeld H (2013) Remanufacturing in Brazil: case studies on the automotive sector. J Clean Prod 53:267–276
-
(2013)
J Clean Prod
, vol.53
, pp. 267-276
-
-
Saavedra, Y.1
Barquet, A.P.B.2
Rozenfeld, H.3
-
8
-
-
77949486920
-
A stochastic model for forward–reverse logistics network design under risk
-
El-sayed M, Afia N, El-kharbotly A (2010) A stochastic model for forward–reverse logistics network design under risk. Comput Ind Eng 58(3):423–431
-
(2010)
Comput Ind Eng
, vol.58
, Issue.3
, pp. 423-431
-
-
El-sayed, M.1
Afia, N.2
El-kharbotly, A.3
-
9
-
-
84890546952
-
Pricing and production planning for reverse supply chain: a review
-
Steeneck DW, Sarin SC (2013) Pricing and production planning for reverse supply chain: a review. Int J Prod Res 51(23–24):6972–6989
-
(2013)
Int J Prod Res
, vol.51
, Issue.23-24
, pp. 6972-6989
-
-
Steeneck, D.W.1
Sarin, S.C.2
-
10
-
-
31044432628
-
Dynamic performance of a hybrid inventory system with a kanban policy in remanufacturing process
-
Zhou L, Naima MM, Tang O, Towilla DR (2006) Dynamic performance of a hybrid inventory system with a kanban policy in remanufacturing process. Omega 34(6):585–598
-
(2006)
Omega
, vol.34
, Issue.6
, pp. 585-598
-
-
Zhou, L.1
Naima, M.M.2
Tang, O.3
Towilla, D.R.4
-
11
-
-
10444268048
-
A performance of static priority rules for shared facilities in a remanufacturing shop with disassembly and reassembly
-
Guide VDR, Souza GC, Van der EA L (2005) A performance of static priority rules for shared facilities in a remanufacturing shop with disassembly and reassembly. Eur J Oper Res 164(2):341–353
-
(2005)
Eur J Oper Res
, vol.164
, Issue.2
, pp. 341-353
-
-
Guide, V.D.R.1
Souza, G.C.2
Van der EA, L.3
-
12
-
-
0033738099
-
Production planning and control for remanufacturing: industry practice and research needs
-
Guide VDR (2000) Production planning and control for remanufacturing: industry practice and research needs. J Oper Manag 18(4):467–483
-
(2000)
J Oper Manag
, vol.18
, Issue.4
, pp. 467-483
-
-
Guide, V.D.R.1
-
13
-
-
0033358107
-
Issues in environmentally conscious manufacturing and product recovery: a survey
-
Gungor A, Gupta SM (1999) Issues in environmentally conscious manufacturing and product recovery: a survey. Comput Ind Eng 36(4):811–853
-
(1999)
Comput Ind Eng
, vol.36
, Issue.4
, pp. 811-853
-
-
Gungor, A.1
Gupta, S.M.2
-
14
-
-
0040150529
-
Material planning for a remanufacturing facility
-
Ferrer G, Whybark DC (2001) Material planning for a remanufacturing facility. Prod Oper Manag 10:112–124
-
(2001)
Prod Oper Manag
, vol.10
, pp. 112-124
-
-
Ferrer, G.1
Whybark, D.C.2
-
15
-
-
34547240840
-
Combinatorial optimization and green logistics
-
Sbihi A, Eglese RW (2007) Combinatorial optimization and green logistics. 4OR Q J Oper Res 5(2):99–116
-
(2007)
4OR Q J Oper Res
, vol.5
, Issue.2
, pp. 99-116
-
-
Sbihi, A.1
Eglese, R.W.2
-
16
-
-
0031277045
-
Quantitative models for reverse logistics: a review
-
Fleischmann M, Bloemhof-ruwaard JM, Dekker R, Van der Laan E, Nunen JAEE, Van Wassenhove LN (1997) Quantitative models for reverse logistics: a review. Eur J Oper Res 103(1):1–17
-
(1997)
Eur J Oper Res
, vol.103
, Issue.1
, pp. 1-17
-
-
Fleischmann, M.1
Bloemhof-ruwaard, J.M.2
Dekker, R.3
Van der Laan, E.4
Nunen, J.A.E.E.5
Van Wassenhove, L.N.6
-
18
-
-
33748479670
-
Dynamic lot sizing with product returns and remanufacturing
-
Teunter RH, Bayindir ZP, Van den Heuvel W (2006) Dynamic lot sizing with product returns and remanufacturing. Int J Prod Res 44(20):4377–4400
-
(2006)
Int J Prod Res
, vol.44
, Issue.20
, pp. 4377-4400
-
-
Teunter, R.H.1
Bayindir, Z.P.2
Van den Heuvel, W.3
-
19
-
-
79951821139
-
A new silver-meal based heuristic for the single-item dynamic lot sizing problem with returns and remanufacturing
-
Schulz T (2011) A new silver-meal based heuristic for the single-item dynamic lot sizing problem with returns and remanufacturing. Int J Prod Res 49(9):2519–2533
-
(2011)
Int J Prod Res
, vol.49
, Issue.9
, pp. 2519-2533
-
-
Schulz, T.1
-
20
-
-
84877336856
-
A robust block-chain based tabu search algorithm for the dynamic lot sizing problem with product returns and remanufacturing
-
Li X, Baki F, Tian P, Chaouch BA (2014) A robust block-chain based tabu search algorithm for the dynamic lot sizing problem with product returns and remanufacturing. Omega 42(1):75–87
-
(2014)
Omega
, vol.42
, Issue.1
, pp. 75-87
-
-
Li, X.1
Baki, F.2
Tian, P.3
Chaouch, B.A.4
-
21
-
-
80053490329
-
Solution algorithms for dynamic lot-sizing in remanufacturing systems
-
Ahn HD, Lee DH, Kim HJ (2011) Solution algorithms for dynamic lot-sizing in remanufacturing systems. Int J Prod Res 49(22):6729–6748
-
(2011)
Int J Prod Res
, vol.49
, Issue.22
, pp. 6729-6748
-
-
Ahn, H.D.1
Lee, D.H.2
Kim, H.J.3
-
22
-
-
84953868236
-
Metaheuristic optimization for the single-item dynamic lot sizing problem with returns and remanufacturing
-
Parsopoulos KE, Konstantaras I, Skouri K (2015) Metaheuristic optimization for the single-item dynamic lot sizing problem with returns and remanufacturing. Comput Ind Eng 83:307–315
-
(2015)
Comput Ind Eng
, vol.83
, pp. 307-315
-
-
Parsopoulos, K.E.1
Konstantaras, I.2
Skouri, K.3
-
23
-
-
84923095111
-
General variable neighborhood search for the multi-product dynamic lot sizing problem in closed-loop supply chain
-
Sifaleras A, Konstantaras I (2015) General variable neighborhood search for the multi-product dynamic lot sizing problem in closed-loop supply chain. Electron Notes Discrete Math 47:69–76
-
(2015)
Electron Notes Discrete Math
, vol.47
, pp. 69-76
-
-
Sifaleras, A.1
Konstantaras, I.2
-
24
-
-
84885971237
-
A heuristic solution procedure for the dynamic lot sizing problem with remanufacturing and product recovery
-
Baki MF, Chaouch BA, Abdul-kader W (2014) A heuristic solution procedure for the dynamic lot sizing problem with remanufacturing and product recovery. Comput Oper Res 43:225–236
-
(2014)
Comput Oper Res
, vol.43
, pp. 225-236
-
-
Baki, M.F.1
Chaouch, B.A.2
Abdul-kader, W.3
-
25
-
-
84896709385
-
A mathematical model for production planning in hybrid manufacturing-remanufacturing systems
-
Chen M, Abrishami P (2014) A mathematical model for production planning in hybrid manufacturing-remanufacturing systems. Int J Adv Manuf Technol 71(5–8):1187–1196
-
(2014)
Int J Adv Manuf Technol
, vol.71
, Issue.5-8
, pp. 1187-1196
-
-
Chen, M.1
Abrishami, P.2
-
26
-
-
77954861017
-
Multiperiod remanufacturing planning with uncertain quality of inputs
-
Denizel M, Ferguson M, Souza G (2010) Multiperiod remanufacturing planning with uncertain quality of inputs. IEEE Trans Eng Manag 57(3):394–404
-
(2010)
IEEE Trans Eng Manag
, vol.57
, Issue.3
, pp. 394-404
-
-
Denizel, M.1
Ferguson, M.2
Souza, G.3
-
27
-
-
67649985185
-
The value of quality grading in remanufacturing
-
Ferguson M, Guide VD, Koca E, Souza GC (2009) The value of quality grading in remanufacturing. Prod Oper Manag 18(3):300–314
-
(2009)
Prod Oper Manag
, vol.18
, Issue.3
, pp. 300-314
-
-
Ferguson, M.1
Guide, V.D.2
Koca, E.3
Souza, G.C.4
-
28
-
-
84884810061
-
Remanufacturing lot-sizing under alternative perceptions of returned units’ quality
-
Zikopoulos C (2012) Remanufacturing lot-sizing under alternative perceptions of returned units’ quality. Int J Bus Sci Appl Manag 7:12–22
-
(2012)
Int J Bus Sci Appl Manag
, vol.7
, pp. 12-22
-
-
Zikopoulos, C.1
-
29
-
-
84880262327
-
K. Production planning optimization for manufacturing and remanufacturing system in stochastic environment
-
Naeem MA, Dias DJ, Tibrewal R, Chang PC, Tiwari M (2013) K. Production planning optimization for manufacturing and remanufacturing system in stochastic environment. J Intell Manuf 24(4):717–728
-
(2013)
J Intell Manuf
, vol.24
, Issue.4
, pp. 717-728
-
-
Naeem, M.A.1
Dias, D.J.2
Tibrewal, R.3
Chang, P.C.4
Tiwari, M.5
-
30
-
-
70449659140
-
A stochastic dynamic programming based model for uncertain production planning of re-manufacturing system
-
Li C, Liu F, Cao H, Wang Q (2009) A stochastic dynamic programming based model for uncertain production planning of re-manufacturing system. Int J Prod Res 47(13):3657–3668
-
(2009)
Int J Prod Res
, vol.47
, Issue.13
, pp. 3657-3668
-
-
Li, C.1
Liu, F.2
Cao, H.3
Wang, Q.4
-
31
-
-
84927772474
-
Dynamic acquisition pricing policy under uncertain remanufactured-product demand
-
Xie J, Li ZJ, Yao Y, Liang L (2015) Dynamic acquisition pricing policy under uncertain remanufactured-product demand. Ind Manag Data Syst 115(3):521–540
-
(2015)
Ind Manag Data Syst
, vol.115
, Issue.3
, pp. 521-540
-
-
Xie, J.1
Li, Z.J.2
Yao, Y.3
Liang, L.4
-
32
-
-
84870293735
-
Optimal manufacturing policy in a reverse logistic system with dependent stochastic returns and limited capacities
-
Benedito E, Corominas A (2013) Optimal manufacturing policy in a reverse logistic system with dependent stochastic returns and limited capacities. Int J Prod Res 51(1):189–201
-
(2013)
Int J Prod Res
, vol.51
, Issue.1
, pp. 189-201
-
-
Benedito, E.1
Corominas, A.2
-
33
-
-
85108976174
-
Robust optimization of large-scale systems
-
Mulvey J, Vanderbei R, Zenios S (1995) Robust optimization of large-scale systems. Oper Res 43(2):264–281
-
(1995)
Oper Res
, vol.43
, Issue.2
, pp. 264-281
-
-
Mulvey, J.1
Vanderbei, R.2
Zenios, S.3
-
34
-
-
63949087563
-
Stochastic programs with first-order dominance constraints induced by mixed-integer linear recourse
-
Gollmer R, Neise F, Schultz R (2008) Stochastic programs with first-order dominance constraints induced by mixed-integer linear recourse. SIAM J Optim 19(2):552–571
-
(2008)
SIAM J Optim
, vol.19
, Issue.2
, pp. 552-571
-
-
Gollmer, R.1
Neise, F.2
Schultz, R.3
-
35
-
-
63049125545
-
Risk neutral and risk averse power optimization in electricity networks with dispersed generation
-
Kuhn S, Schultz R (2009) Risk neutral and risk averse power optimization in electricity networks with dispersed generation. Math Meth Oper Res 69(2):353–367
-
(2009)
Math Meth Oper Res
, vol.69
, Issue.2
, pp. 353-367
-
-
Kuhn, S.1
Schultz, R.2
-
36
-
-
84888033064
-
Risk-averse two-stage stochastic programs in furniture plants
-
Alem D, Morabito R (2013) Risk-averse two-stage stochastic programs in furniture plants. OR-Spektrum 35(4):773–806
-
(2013)
OR-Spektrum
, vol.35
, Issue.4
, pp. 773-806
-
-
Alem, D.1
Morabito, R.2
-
37
-
-
0032075809
-
Robust process planning under uncertainty
-
Ahmed S, Sahinidis NV (1998) Robust process planning under uncertainty. Ind Eng Chem Res 37(5):1883–1892
-
(1998)
Ind Eng Chem Res
, vol.37
, Issue.5
, pp. 1883-1892
-
-
Ahmed, S.1
Sahinidis, N.V.2
-
38
-
-
84890372000
-
Risk management in production planning of perishable goods
-
Amorim P, Alem D, Almada-lobo B (2013) Risk management in production planning of perishable goods. Ind Eng Chem Res 52(49):17538–17553
-
(2013)
Ind Eng Chem Res
, vol.52
, Issue.49
, pp. 17538-17553
-
-
Amorim, P.1
Alem, D.2
Almada-lobo, B.3
-
40
-
-
84868547927
-
Optimal policies in hybrid manufacturing/remanufacturing systems with random price-sensitive product returns
-
Xu X, Li Y, Cai X (2012) Optimal policies in hybrid manufacturing/remanufacturing systems with random price-sensitive product returns. Int J Prod Res 50(23):6978–6998
-
(2012)
Int J Prod Res
, vol.50
, Issue.23
, pp. 6978-6998
-
-
Xu, X.1
Li, Y.2
Cai, X.3
-
41
-
-
84941941083
-
Remanufacturing decisions and implications under material cost uncertainty
-
Shi W, Min KJ (2014) Remanufacturing decisions and implications under material cost uncertainty. Int J Prod Res. doi:10.1080/00207543.2014.932933
-
(2014)
Int J Prod Res
-
-
Shi, W.1
Min, K.J.2
-
42
-
-
84887812623
-
A flexibly structured lot sizing heuristic for a static remanufacturing system
-
Schulz T, Voigt G (2014) A flexibly structured lot sizing heuristic for a static remanufacturing system. Omega 44:21–31
-
(2014)
Omega
, vol.44
, pp. 21-31
-
-
Schulz, T.1
Voigt, G.2
-
43
-
-
84861024851
-
Reverse logistics: a stochastic EOQ-based inventory control model for mixed manufacturing/remanufacturing systems with return policies
-
Alinovi A, Bottani E, Montanari R (2012) Reverse logistics: a stochastic EOQ-based inventory control model for mixed manufacturing/remanufacturing systems with return policies. Int J Prod Res 50(5):1243–1264
-
(2012)
Int J Prod Res
, vol.50
, Issue.5
, pp. 1243-1264
-
-
Alinovi, A.1
Bottani, E.2
Montanari, R.3
|