메뉴 건너뛰기




Volumn 82, Issue 1-4, 2016, Pages 235-251

A TQCS-based service selection and scheduling strategy in cloud manufacturing

Author keywords

Analytic hierarchy process (AHP); Ant colony optimization (ACO); Cloud manufacturing (CMfg); Relative superiority degree; Service selection and scheduling; TQCS

Indexed keywords

ALGORITHMS; ANALYTIC HIERARCHY PROCESS; ANT COLONY OPTIMIZATION; ARTIFICIAL INTELLIGENCE; COMPUTER AIDED MANUFACTURING; DECISION MAKING; DECISION THEORY; HIERARCHICAL SYSTEMS; MANUFACTURE;

EID: 84953838050     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-015-7350-5     Document Type: Article
Times cited : (172)

References (69)
  • 1
    • 44449097657 scopus 로고    scopus 로고
    • Study on manufacturing grid & its resource service optimal-selection system
    • Tao F, Hu YF, Zhou ZD (2008) Study on manufacturing grid & its resource service optimal-selection system. Int J Adv Manuf Technol 37(9–10):1022–1041
    • (2008) Int J Adv Manuf Technol , vol.37 , Issue.9-10 , pp. 1022-1041
    • Tao, F.1    Hu, Y.F.2    Zhou, Z.D.3
  • 2
    • 84888362486 scopus 로고    scopus 로고
    • Cloud manufacturing: strategic vision and state-of-the-art
    • Wu DZ, Greer MJ, Rosen DW, Schaefer D (2013) Cloud manufacturing: strategic vision and state-of-the-art. J Manuf Syst 32(4):564–579
    • (2013) J Manuf Syst , vol.32 , Issue.4 , pp. 564-579
    • Wu, D.Z.1    Greer, M.J.2    Rosen, D.W.3    Schaefer, D.4
  • 4
    • 84906832119 scopus 로고    scopus 로고
    • Cloud-based design and manufacturing: a new paradigm in digital manufacturing and design innovation
    • Wu DZ, Rosen DW, Wang LH, Schaefer D (2015) Cloud-based design and manufacturing: a new paradigm in digital manufacturing and design innovation. Comput Aided Des 59:1–14
    • (2015) Comput Aided Des , vol.59 , pp. 1-14
    • Wu, D.Z.1    Rosen, D.W.2    Wang, L.H.3    Schaefer, D.4
  • 5
    • 84888353904 scopus 로고    scopus 로고
    • Enhancing the product realization process with cloud-based design and manufacturing systems
    • Wu DZ, Thames JL, Rosen DW, Schaefer D (2013) Enhancing the product realization process with cloud-based design and manufacturing systems. J Comput Inf Sci Eng 13(4). doi:10.1115/1.4025257
    • (2013) J Comput Inf Sci Eng , vol.13 , Issue.4
    • Wu, D.Z.1    Thames, J.L.2    Rosen, D.W.3    Schaefer, D.4
  • 6
    • 80052032966 scopus 로고    scopus 로고
    • From cloud computing to cloud manufacturing
    • Xu X (2012) From cloud computing to cloud manufacturing. Rob Comput Integr Manuf 28(1):75–86
    • (2012) Rob Comput Integr Manuf , vol.28 , Issue.1 , pp. 75-86
    • Xu, X.1
  • 7
    • 84891717664 scopus 로고    scopus 로고
    • Cloud technology for service-oriented manufacturing
    • Xu X (2013) Cloud technology for service-oriented manufacturing. ISPE Int Conf Concurrent Eng pp. 539–549
    • (2013) ISPE Int Conf Concurrent Eng , pp. 539-549
    • Xu, X.1
  • 8
    • 84884986286 scopus 로고    scopus 로고
    • Machine availability monitoring and machining process planning towards cloud manufacturing
    • Wang LH (2013) Machine availability monitoring and machining process planning towards cloud manufacturing. CIRP J Manuf Sci Technol 6(4):263–273
    • (2013) CIRP J Manuf Sci Technol , vol.6 , Issue.4 , pp. 263-273
    • Wang, L.H.1
  • 9
    • 84865811968 scopus 로고    scopus 로고
    • A collaborative and integrated platform to support distributed manufacturing system using a service-oriented approach based on cloud computing paradigm
    • Valilai OF, Houshmand M (2013) A collaborative and integrated platform to support distributed manufacturing system using a service-oriented approach based on cloud computing paradigm. Rob Comput Integr Manuf 29(1):110–127
    • (2013) Rob Comput Integr Manuf , vol.29 , Issue.1 , pp. 110-127
    • Valilai, O.F.1    Houshmand, M.2
  • 10
    • 84890963494 scopus 로고    scopus 로고
    • Design and implementation of a service-oriented architecture for the optimization of industrial applications
    • Girbea A, Suciu C, Nechifor S, Sisak F (2014) Design and implementation of a service-oriented architecture for the optimization of industrial applications. IEEE Trans Ind Inf 10(1):185–196
    • (2014) IEEE Trans Ind Inf , vol.10 , Issue.1 , pp. 185-196
    • Girbea, A.1    Suciu, C.2    Nechifor, S.3    Sisak, F.4
  • 11
    • 84896964757 scopus 로고    scopus 로고
    • IoT-based intelligent perception and access of manufacturing resource toward cloud manufacturing
    • Tao F, Zuo Y, Xu LD, Zhang L (2014) IoT-based intelligent perception and access of manufacturing resource toward cloud manufacturing. IEEE Trans Ind Inf 10(2):1547–1557
    • (2014) IEEE Trans Ind Inf , vol.10 , Issue.2 , pp. 1547-1557
    • Tao, F.1    Zuo, Y.2    Xu, L.D.3    Zhang, L.4
  • 12
    • 84896931467 scopus 로고    scopus 로고
    • CCIot-CMfg: cloud computing and internet of things-based cloud manufacturing service system
    • Tao F, Cheng Y, Xu LD, Zhang L, Li BH (2014) CCIot-CMfg: cloud computing and internet of things-based cloud manufacturing service system. IEEE Trans Ind Inf 10(2):1435–1442
    • (2014) IEEE Trans Ind Inf , vol.10 , Issue.2 , pp. 1435-1442
    • Tao, F.1    Cheng, Y.2    Xu, L.D.3    Zhang, L.4    Li, B.H.5
  • 13
    • 67349189495 scopus 로고    scopus 로고
    • Modeling and scheduling for manufacturing grid workflows using timed Petri nets
    • Hu HS, Li ZW (2009) Modeling and scheduling for manufacturing grid workflows using timed Petri nets. Int J Adv Manuf Technol 42(5–6):553–568
    • (2009) Int J Adv Manuf Technol , vol.42 , Issue.5-6 , pp. 553-568
    • Hu, H.S.1    Li, Z.W.2
  • 14
    • 59049090820 scopus 로고    scopus 로고
    • Resource service composition and its optimal-selection based on particle swarm optimization in manufacturing grid system
    • Tao F, Zhao DM, Hu YF, Zhou ZD (2008) Resource service composition and its optimal-selection based on particle swarm optimization in manufacturing grid system. IEEE Trans Ind Inf 4(4):315–327
    • (2008) IEEE Trans Ind Inf , vol.4 , Issue.4 , pp. 315-327
    • Tao, F.1    Zhao, D.M.2    Hu, Y.F.3    Zhou, Z.D.4
  • 15
    • 70249097062 scopus 로고    scopus 로고
    • Correlation-aware resource service composition and optimal-selection in manufacturing grid
    • Tao F, Zhao DM, Hu YF, Zhou ZD (2010) Correlation-aware resource service composition and optimal-selection in manufacturing grid. Eur J Oper Res 201(1):129–143
    • (2010) Eur J Oper Res , vol.201 , Issue.1 , pp. 129-143
    • Tao, F.1    Zhao, D.M.2    Hu, Y.F.3    Zhou, Z.D.4
  • 16
    • 77952293579 scopus 로고    scopus 로고
    • A mixed integer programming formulation for scheduling of virtual manufacturing cells (VMCs)
    • Kesen SE, Das SK, Gungor Z (2010) A mixed integer programming formulation for scheduling of virtual manufacturing cells (VMCs). Int J Adv Manuf Technol 47(5–8):665–678
    • (2010) Int J Adv Manuf Technol , vol.47 , Issue.5-8 , pp. 665-678
    • Kesen, S.E.1    Das, S.K.2    Gungor, Z.3
  • 17
    • 71749103834 scopus 로고    scopus 로고
    • A genetic algorithm based heuristic for scheduling of virtual manufacturing cells (VMCs)
    • Kesen SE, Das SK, Gungor Z (2010) A genetic algorithm based heuristic for scheduling of virtual manufacturing cells (VMCs). Comput Oper Res 37(6):1148–1156
    • (2010) Comput Oper Res , vol.37 , Issue.6 , pp. 1148-1156
    • Kesen, S.E.1    Das, S.K.2    Gungor, Z.3
  • 18
    • 33751515856 scopus 로고    scopus 로고
    • Project-driven planning and scheduling support for virtual manufacturing
    • Banaszak ZA, Zaremba MB (2006) Project-driven planning and scheduling support for virtual manufacturing. J Intell Manuf 17(6):641–651
    • (2006) J Intell Manuf , vol.17 , Issue.6 , pp. 641-651
    • Banaszak, Z.A.1    Zaremba, M.B.2
  • 19
    • 84926126958 scopus 로고    scopus 로고
    • Scheduling of virtual manufacturing cells with outsourcing allowed
    • Arkat J, Ghahve H (2014) Scheduling of virtual manufacturing cells with outsourcing allowed. Int J Comput Integr Manuf 27(12):1079–1089
    • (2014) Int J Comput Integr Manuf , vol.27 , Issue.12 , pp. 1079-1089
    • Arkat, J.1    Ghahve, H.2
  • 20
    • 63049116577 scopus 로고    scopus 로고
    • A game-theory approach for job scheduling in networked manufacturing
    • Zhou GH, Jiang PY, Huang GQ (2009) A game-theory approach for job scheduling in networked manufacturing. Int J Adv Manuf Technol 41(9–10):972–985
    • (2009) Int J Adv Manuf Technol , vol.41 , Issue.9-10 , pp. 972-985
    • Zhou, G.H.1    Jiang, P.Y.2    Huang, G.Q.3
  • 21
  • 22
    • 77957572578 scopus 로고    scopus 로고
    • Resource service optimal-selection based on intuitionistic fuzzy set and non-functionality QoS in manufacturing grid system
    • Tao F, Zhao DM, Zhang L (2010) Resource service optimal-selection based on intuitionistic fuzzy set and non-functionality QoS in manufacturing grid system. Knowl Inf Syst 25(1):185–208
    • (2010) Knowl Inf Syst , vol.25 , Issue.1 , pp. 185-208
    • Tao, F.1    Zhao, D.M.2    Zhang, L.3
  • 23
    • 84899900142 scopus 로고    scopus 로고
    • A chaos control optimal algorithm for QoS-based service composition selection in cloud manufacturing system
    • Huang BQ, Li CH, Tao F (2014) A chaos control optimal algorithm for QoS-based service composition selection in cloud manufacturing system. Enterp Inf Syst 8(4):445–463
    • (2014) Enterp Inf Syst , vol.8 , Issue.4 , pp. 445-463
    • Huang, B.Q.1    Li, C.H.2    Tao, F.3
  • 24
    • 77955339039 scopus 로고    scopus 로고
    • Global manufacturing and the embodied energy of products
    • Kara S, Manmek S, Herrmann C (2010) Global manufacturing and the embodied energy of products. CIRP Ann Manuf Technol 59(1):29–32
    • (2010) CIRP Ann Manuf Technol , vol.59 , Issue.1 , pp. 29-32
    • Kara, S.1    Manmek, S.2    Herrmann, C.3
  • 25
    • 84911973175 scopus 로고    scopus 로고
    • QoS and energy consumption aware service composition and optimal-selection based on Pareto group leader algorithm in cloud manufacturing system
    • Xiang F, Hu YF, Yu YR, Wu HC (2014) QoS and energy consumption aware service composition and optimal-selection based on Pareto group leader algorithm in cloud manufacturing system. Cent Eur J Oper Res 22(4):663–685
    • (2014) Cent Eur J Oper Res , vol.22 , Issue.4 , pp. 663-685
    • Xiang, F.1    Hu, Y.F.2    Yu, Y.R.3    Wu, H.C.4
  • 26
    • 84896949004 scopus 로고    scopus 로고
    • CLPS-GA: a case library and Pareto solution-based hybrid genetic algorithm for energy-aware cloud service scheduling
    • Tao F, Feng Y, Zhang L, Liao TW (2014) CLPS-GA: a case library and Pareto solution-based hybrid genetic algorithm for energy-aware cloud service scheduling. Appl Softw Comput J 19:264–279
    • (2014) Appl Softw Comput J , vol.19 , pp. 264-279
    • Tao, F.1    Feng, Y.2    Zhang, L.3    Liao, T.W.4
  • 27
    • 84871975041 scopus 로고    scopus 로고
    • Utility modelling, equilibrium, and coordination of resource service transaction in service-oriented manufacturing system
    • Tao F, Cheng Y, Zhang L, Zhao DM (2012) Utility modelling, equilibrium, and coordination of resource service transaction in service-oriented manufacturing system. Proc Inst Mech Eng B J Eng Manuf 226(6):1099–1117
    • (2012) Proc Inst Mech Eng B J Eng Manuf , vol.226 , Issue.6 , pp. 1099-1117
    • Tao, F.1    Cheng, Y.2    Zhang, L.3    Zhao, D.M.4
  • 28
    • 78751683587 scopus 로고    scopus 로고
    • Study on the utility model and utility equilibrium of resource service transaction in cloud manufacturing
    • Cheng Y, Tao F, Zhang L, Zhang X, Xi GH, Zhao D (2010) Study on the utility model and utility equilibrium of resource service transaction in cloud manufacturing. IEEE Int Conf Ind Eng Eng Manage, pp. 2298–2302
    • (2010) IEEE Int Conf Ind Eng Eng Manage , pp. 2298-2302
    • Cheng, Y.1    Tao, F.2    Zhang, L.3    Zhang, X.4    Xi, G.H.5    Zhao, D.6
  • 29
    • 84890544236 scopus 로고    scopus 로고
    • Energy-aware resource service scheduling based on utility evaluation in cloud manufacturing system
    • Cheng Y, Tao F, Liu YL, Zhao DM, Zhang L, Xu LD (2013) Energy-aware resource service scheduling based on utility evaluation in cloud manufacturing system. Proc Inst Mech Eng B J Eng Manuf 227(12):1901–1915
    • (2013) Proc Inst Mech Eng B J Eng Manuf , vol.227 , Issue.12 , pp. 1901-1915
    • Cheng, Y.1    Tao, F.2    Liu, Y.L.3    Zhao, D.M.4    Zhang, L.5    Xu, L.D.6
  • 30
    • 57049188901 scopus 로고    scopus 로고
    • Application and modeling of resource service trust-QoS evaluation in manufacturing grid system
    • Tao F, Hu YF, Zhou ZD (2009) Application and modeling of resource service trust-QoS evaluation in manufacturing grid system. Int J Prod Res 47(6):1521–1550
    • (2009) Int J Prod Res , vol.47 , Issue.6 , pp. 1521-1550
    • Tao, F.1    Hu, Y.F.2    Zhou, Z.D.3
  • 31
    • 60749112088 scopus 로고    scopus 로고
    • An approach to manufacturing grid resource service scheduling based on trust-QoS
    • Tao F, Hu Y, Zhao D, Zhou Z (2009) An approach to manufacturing grid resource service scheduling based on trust-QoS. Int J Comput Integr Manuf 22(2):100–111
    • (2009) Int J Comput Integr Manuf , vol.22 , Issue.2 , pp. 100-111
    • Tao, F.1    Hu, Y.2    Zhao, D.3    Zhou, Z.4
  • 32
    • 80053231977 scopus 로고    scopus 로고
    • Trust model based on feedback evaluation in cloud manufacturing environment
    • Xie XL, Liu L, Cao YZ (2011) Trust model based on feedback evaluation in cloud manufacturing environment. Adv Mater Res 308(1-3):1740–1745
    • (2011) Adv Mater Res , vol.308 , Issue.1-3 , pp. 1740-1745
    • Xie, X.L.1    Liu, L.2    Cao, Y.Z.3
  • 33
    • 84911005117 scopus 로고    scopus 로고
    • Trust evaluation model of cloud manufacturing service platform
    • Li CS, Wang SL, Kang L, Guo L, Cao Y (2014) Trust evaluation model of cloud manufacturing service platform. Int J Adv Manuf Technol 75(1-4):489–501
    • (2014) Int J Adv Manuf Technol , vol.75 , Issue.1-4 , pp. 489-501
    • Li, C.S.1    Wang, S.L.2    Kang, L.3    Guo, L.4    Cao, Y.5
  • 36
    • 84914105406 scopus 로고    scopus 로고
    • Research of cloud manufacturing execution path optimization based on adaptive ant colony algorithm on Hadoop platform. 2nd International Conference on Machinery
    • Chen ZG (2014) Research of cloud manufacturing execution path optimization based on adaptive ant colony algorithm on Hadoop platform. 2nd International Conference on Machinery. Mater Sci Energy Eng 628:417–420
    • (2014) Mater Sci Energy Eng , vol.628 , pp. 417-420
    • Chen, Z.G.1
  • 37
    • 0035325544 scopus 로고    scopus 로고
    • A heuristic genetic algorithm for subcontractor selection in a global manufacturing environment
    • Wang DW, Yung KL, Ip WH (2001) A heuristic genetic algorithm for subcontractor selection in a global manufacturing environment. IEEE Trans Syst Man Cybern C Appl Rev 31(2):189–198
    • (2001) IEEE Trans Syst Man Cybern C Appl Rev , vol.31 , Issue.2 , pp. 189-198
    • Wang, D.W.1    Yung, K.L.2    Ip, W.H.3
  • 38
    • 77949432740 scopus 로고    scopus 로고
    • Improved fuzzy genetic algorithm-based networked manufacturing alliance member selection
    • Wan P, Jing K, Ma LX, Yuan PY (2009) Improved fuzzy genetic algorithm-based networked manufacturing alliance member selection. Proc IEEE Int Conf Ind Eng Eng Manag pp. 1520–1524
    • (2009) Proc IEEE Int Conf Ind Eng Eng Manag , pp. 1520-1524
    • Wan, P.1    Jing, K.2    Ma, L.X.3    Yuan, P.Y.4
  • 39
    • 0037708478 scopus 로고    scopus 로고
    • Fuzzy group decision making for selection among computer integrated manufacturing systems
    • Bozdag CE, Kahraman C, Ruan D (2003) Fuzzy group decision making for selection among computer integrated manufacturing systems. Comput Ind 51(1):13–29
    • (2003) Comput Ind , vol.51 , Issue.1 , pp. 13-29
    • Bozdag, C.E.1    Kahraman, C.2    Ruan, D.3
  • 40
    • 0031994396 scopus 로고    scopus 로고
    • A decision support system for the selection of computer-integrated manufacturing technologies
    • Luong LHS (1998) A decision support system for the selection of computer-integrated manufacturing technologies. Rob Comput Integr Manuf 14(1):45–53
    • (1998) Rob Comput Integr Manuf , vol.14 , Issue.1 , pp. 45-53
    • Luong, L.H.S.1
  • 41
    • 2642517197 scopus 로고    scopus 로고
    • Selection of computer-integrated manufacturing technologies using a combined analytic hierarchy process and goal programming model
    • Yurdakul M (2004) Selection of computer-integrated manufacturing technologies using a combined analytic hierarchy process and goal programming model. Rob Comput Integr Manuf 20(4):329–340
    • (2004) Rob Comput Integr Manuf , vol.20 , Issue.4 , pp. 329-340
    • Yurdakul, M.1
  • 42
    • 84901763716 scopus 로고    scopus 로고
    • Multitask oriented virtual resource integration and optimal scheduling in cloud manufacturing
    • Cheng Z, Zhan DC, Zhao XB, Wan H (2014) Multitask oriented virtual resource integration and optimal scheduling in cloud manufacturing. J Appl Math. doi:10.1155/2014/369350
    • (2014) J Appl Math
    • Cheng, Z.1    Zhan, D.C.2    Zhao, X.B.3    Wan, H.4
  • 43
    • 84878148632 scopus 로고    scopus 로고
    • FC-PACO-RM: a parallel method for service composition optimal-selection in cloud manufacturing system
    • Tao F, LaiLi YJ, Xu LD, Zhang L (2013) FC-PACO-RM: a parallel method for service composition optimal-selection in cloud manufacturing system. IEEE Trans Ind Inf 9(4):2023–2033
    • (2013) IEEE Trans Ind Inf , vol.9 , Issue.4 , pp. 2023-2033
    • Tao, F.1    LaiLi, Y.J.2    Xu, L.D.3    Zhang, L.4
  • 44
    • 84899045358 scopus 로고    scopus 로고
    • Research on selection strategy of machining equipment in cloud manufacturing
    • Wang SL, Guo L, Kang L, Li CS, Li XY, Stephane YM (2014) Research on selection strategy of machining equipment in cloud manufacturing. Int J Adv Manuf Technol 71(9-12):1549–1563
    • (2014) Int J Adv Manuf Technol , vol.71 , Issue.9-12 , pp. 1549-1563
    • Wang, S.L.1    Guo, L.2    Kang, L.3    Li, C.S.4    Li, X.Y.5    Stephane, Y.M.6
  • 45
    • 84890870882 scopus 로고    scopus 로고
    • A discrete hybrid bees algorithm for service aggregation optimal selection in cloud manufacturing
    • Tian SS, Liu Q, Xu WJ, Yan JW (2013) A discrete hybrid bees algorithm for service aggregation optimal selection in cloud manufacturing. Lect Notes Comput Sci 8206:110–117
    • (2013) Lect Notes Comput Sci , vol.8206 , pp. 110-117
    • Tian, S.S.1    Liu, Q.2    Xu, W.J.3    Yan, J.W.4
  • 46
    • 33745123677 scopus 로고    scopus 로고
    • Research on resources optimisation deployment model and algorithm for collaborative manufacturing process
    • Yao CF, Zhang DH, Peng WL, Bu K (2006) Research on resources optimisation deployment model and algorithm for collaborative manufacturing process. Int J Prod Res 44(16):3279–3301
    • (2006) Int J Prod Res , vol.44 , Issue.16 , pp. 3279-3301
    • Yao, C.F.1    Zhang, D.H.2    Peng, W.L.3    Bu, K.4
  • 47
  • 48
    • 33845874106 scopus 로고    scopus 로고
    • Research on TQCS strategy of digital manufacturing resource management
    • Zhou ZD, Zhang HF (2006) Research on TQCS strategy of digital manufacturing resource management. J Wuhan Univ Technol 28(1):270–274
    • (2006) J Wuhan Univ Technol , vol.28 , Issue.1 , pp. 270-274
    • Zhou, Z.D.1    Zhang, H.F.2
  • 49
    • 0347353565 scopus 로고    scopus 로고
    • Self-organization manufacturing grid and its task scheduling algorithm
    • Liu LL, Yu T, Shi ZB, Fang ML (2003) Self-organization manufacturing grid and its task scheduling algorithm. Comput Integr Manuf Syst 9(6):449–455
    • (2003) Comput Integr Manuf Syst , vol.9 , Issue.6 , pp. 449-455
    • Liu, L.L.1    Yu, T.2    Shi, Z.B.3    Fang, M.L.4
  • 50
    • 33751120948 scopus 로고    scopus 로고
    • Research on manufacturing grid resource scheduling based on genetic algorithm
    • Zhang CS, Mo R, Shi SY, Chang ZY, Chen ZF (2006) Research on manufacturing grid resource scheduling based on genetic algorithm. China Mech Eng 17(18):1916–1920
    • (2006) China Mech Eng , vol.17 , Issue.18 , pp. 1916-1920
    • Zhang, C.S.1    Mo, R.2    Shi, S.Y.3    Chang, Z.Y.4    Chen, Z.F.5
  • 52
    • 33845786002 scopus 로고    scopus 로고
    • Fuzzy approach to prequalifying construction contractors
    • Li YW, Nie XT, Chen SY (2007) Fuzzy approach to prequalifying construction contractors. J Constr Eng Manag 133(1):40–49
    • (2007) J Constr Eng Manag , vol.133 , Issue.1 , pp. 40-49
    • Li, Y.W.1    Nie, X.T.2    Chen, S.Y.3
  • 53
    • 43849110958 scopus 로고    scopus 로고
    • Fuzzy pricing for urban water resources: model construction and application
    • Zhao RH, Chen SY (2008) Fuzzy pricing for urban water resources: model construction and application. J Environ Manag 88(3):458–466
    • (2008) J Environ Manag , vol.88 , Issue.3 , pp. 458-466
    • Zhao, R.H.1    Chen, S.Y.2
  • 54
    • 10044296721 scopus 로고
    • The theory and application of fuzzy optimum selection for the multistage and multiobjective decision making system
    • Chen SY (1990) The theory and application of fuzzy optimum selection for the multistage and multiobjective decision making system. J Hydraul Eng 1:1–10
    • (1990) J Hydraul Eng , vol.1 , pp. 1-10
    • Chen, S.Y.1
  • 55
    • 0025700933 scopus 로고
    • How to make a decision: the analytic hierarchy process
    • Saaty TL (1990) How to make a decision: the analytic hierarchy process. Eur J Oper Res 48(1):9–26
    • (1990) Eur J Oper Res , vol.48 , Issue.1 , pp. 9-26
    • Saaty, T.L.1
  • 56
    • 53449102906 scopus 로고    scopus 로고
    • Decision making with the analytic hierarchy process
    • Saaty TL (2008) Decision making with the analytic hierarchy process. Int J Serv Sci 1(1):83–98
    • (2008) Int J Serv Sci , vol.1 , Issue.1 , pp. 83-98
    • Saaty, T.L.1
  • 57
    • 33745120499 scopus 로고    scopus 로고
    • Optimal selection of web services for composition based on interface-matching and weighted multistage graph
    • Gao Y, Zhang B, Na J, Yang L, Dai Y, Gong Q (2005) Optimal selection of web services for composition based on interface-matching and weighted multistage graph. Parallel Distrib Comput Appl Technol PDCAT Proc pp. 336–338
    • (2005) Parallel Distrib Comput Appl Technol PDCAT Proc , pp. 336-338
    • Gao, Y.1    Zhang, B.2    Na, J.3    Yang, L.4    Dai, Y.5    Gong, Q.6
  • 58
    • 84953836877 scopus 로고    scopus 로고
    • Parallel dynamic programming algorithm for multistage graph problem
    • Cui HQ, Wang YL (2011) Parallel dynamic programming algorithm for multistage graph problem. Comput Appl Softw 28(12):32–34
    • (2011) Comput Appl Softw , vol.28 , Issue.12 , pp. 32-34
    • Cui, H.Q.1    Wang, Y.L.2
  • 59
    • 0000916076 scopus 로고
    • A survey of dynamic programming computational procedures
    • Larson RE (1967) A survey of dynamic programming computational procedures. IEEE Trans Autom Control 12(6):767–774
    • (1967) IEEE Trans Autom Control , vol.12 , Issue.6 , pp. 767-774
    • Larson, R.E.1
  • 60
    • 0030759617 scopus 로고    scopus 로고
    • Ant colonies for the travelling salesman problem
    • Dorigo M, Gambardella LM (1997) Ant colonies for the travelling salesman problem. Biosystems 43(2):73–81
    • (1997) Biosystems , vol.43 , Issue.2 , pp. 73-81
    • Dorigo, M.1    Gambardella, L.M.2
  • 61
    • 0036672003 scopus 로고    scopus 로고
    • Ant colony optimization for resource-constrained project scheduling
    • Merkle D, Middendorf M, Schmeck H (2002) Ant colony optimization for resource-constrained project scheduling. IEEE Trans Evol Comput 6(4):333–346
    • (2002) IEEE Trans Evol Comput , vol.6 , Issue.4 , pp. 333-346
    • Merkle, D.1    Middendorf, M.2    Schmeck, H.3
  • 62
    • 1642559633 scopus 로고    scopus 로고
    • Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs
    • Rajendran C, Ziegler H (2004) Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs. Eur J Oper Res 155(2):426–438
    • (2004) Eur J Oper Res , vol.155 , Issue.2 , pp. 426-438
    • Rajendran, C.1    Ziegler, H.2
  • 63
    • 9544220684 scopus 로고    scopus 로고
    • Beam-ACO—hybridizing ant colony optimization with beam search: an application to open shop scheduling
    • Blum C (2005) Beam-ACO—hybridizing ant colony optimization with beam search: an application to open shop scheduling. Comput Oper Res 32(6):1565–1591
    • (2005) Comput Oper Res , vol.32 , Issue.6 , pp. 1565-1591
    • Blum, C.1
  • 65
    • 0036682205 scopus 로고    scopus 로고
    • Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times
    • Gagne C, Price WL, Gravel M (2002) Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times. J Oper Res Soc 53(8):895–906
    • (2002) J Oper Res Soc , vol.53 , Issue.8 , pp. 895-906
    • Gagne, C.1    Price, W.L.2    Gravel, M.3
  • 66
    • 51849097767 scopus 로고    scopus 로고
    • Parameter tuning for ant colony optimization: a review
    • Wong KY, Komarudin (2008) Parameter tuning for ant colony optimization: a review. Proc Int Conf Comput Commun Eng pp. 542–545
    • (2008) Proc Int Conf Comput Commun Eng , pp. 542-545
    • Wong, K.Y.1
  • 67
    • 55749108023 scopus 로고    scopus 로고
    • Experimental study of the adjustable parameters in basic ant colony optimization algorithm
    • Duan HB, Ma GJ, Liu SQ (2007) Experimental study of the adjustable parameters in basic ant colony optimization algorithm. IEEE Congr Evol Comput pp. 149–156
    • (2007) IEEE Congr Evol Comput , pp. 149-156
    • Duan, H.B.1    Ma, G.J.2    Liu, S.Q.3
  • 68
    • 14544303989 scopus 로고    scopus 로고
    • The optimal selection on the parameters of the ant colony algorithm
    • Zhang SC, Xu J, Wu J (2003) The optimal selection on the parameters of the ant colony algorithm. Bull Sci Technol 19(5):381–386
    • (2003) Bull Sci Technol , vol.19 , Issue.5 , pp. 381-386
    • Zhang, S.C.1    Xu, J.2    Wu, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.