-
1
-
-
33846329118
-
Experiences with GRIA-Industrial applications on a web services grid
-
Melbourne, Australia Jul
-
M. Surridge, S. Taylor, D. De Roure, and E. Zaluska, "Experiences with GRIA - Industrial applications on a web services grid," in 1st Inter. Conf on e-Science and Grid Computing, Melbourne, Australia, Jul. 2005, pp. 98-105
-
(2005)
1st Inter. Conf on E-Science and Grid Computing
-
-
Surridge, M.1
Taylor, S.2
De Roure, D.3
Zaluska, E.4
-
2
-
-
17444427689
-
Service-oriented paradigms in industrial automation
-
DOI 10.1109/TII.2005.844419
-
F. Jammes and H. Smit, "Service oriented paradigms in industrial automation," IEEE Trans. Ind. Inf., vol. 1, no. 1, pp. 62-70, Feb. 2005 (Pubitemid 40541397)
-
(2005)
IEEE Transactions on Industrial Informatics
, vol.1
, Issue.1
, pp. 62-70
-
-
Jammes, F.1
Smit, H.2
-
3
-
-
33750946798
-
SIRENA-Service infrastructure for real-time embedded networked devices: A service oriented framework for different domains
-
Apr
-
H. Bohn, A. Bobek, and F.Golatowski, "SIRENA - Service infrastructure for real-time embedded networked devices: A service oriented framework for different domains," in Proc. Int. Conf. Networking, Int. Conf. Syst., Int. Conf. Mobile Commun. Learning Technol., Apr. 2006, pp. 43-47
-
(2006)
Proc. Int. Conf. Networking, Int. Conf. Syst., Int. Conf. Mobile Commun. Learning Technol
, pp. 43-47
-
-
Bohn, H.1
Bobek, A.2
Golatowski, F.3
-
4
-
-
59049098028
-
Service-oriented framework for human task support and automation
-
Nov
-
A. Sasa, M. B. Juric, and M. Krisper, "Service-oriented framework for human task support and automation," IEEE Trans. Ind. Inf., vol. 4, no. 4, pp. 292-302, Nov. 2008
-
(2008)
IEEE Trans. Ind. Inf
, vol.4
, Issue.4
, pp. 292-302
-
-
Sasa, A.1
Juric, M.B.2
Krisper, M.3
-
5
-
-
75949097173
-
Towards new web services based supervisory systems in complex industrial organizations: Basic principles and case study
-
Apr
-
D. Idoughi, M. Kerkar, and C. Kolski, "Towards new web services based supervisory systems in complex industrial organizations: Basic principles and case study," Comput. Industry, vol. 61, no. 3, pp. 235-249, Apr. 2010
-
(2010)
Comput. Industry
, vol.61
, Issue.3
, pp. 235-249
-
-
Idoughi, D.1
Kerkar, M.2
Kolski, C.3
-
6
-
-
69249218873
-
A real-time service-oriented architecture for industrial automation
-
Aug
-
T. Cucinotta, A. Mancina, G. F. Anastasi, G. Lipari, L. Mangeruca, R. Checcozzo, and F. Rusina, "A real-time service-oriented architecture for industrial automation," IEEE Trans. Ind. Inf., vol. 5, no. 3, pp. 257-266, Aug. 2009
-
(2009)
IEEE Trans. Ind. Inf
, vol.5
, Issue.3
, pp. 257-266
-
-
Cucinotta, T.1
Mancina, A.2
Anastasi, G.F.3
Lipari, G.4
Mangeruca, L.5
Checcozzo, R.6
Rusina, F.7
-
7
-
-
81255146355
-
Service-oriented infrastructure to support the deployment of evolvable production systems
-
Nov
-
G. Candido, A. W. Colombo, J. Barata, and F. Jammes, "Service- oriented infrastructure to support the deployment of evolvable production systems," IEEE Trans. Ind. Inf., vol. 7, no. 4, pp. 759-767, Nov. 2011
-
(2011)
IEEE Trans. Ind. Inf
, vol.7
, Issue.4
, pp. 759-767
-
-
Candido, G.1
Colombo, A.W.2
Barata, J.3
Jammes, F.4
-
8
-
-
56349109468
-
Towards a time-constrained web service infrastructure for industrial automation
-
Hamburg, Germany Sep
-
M. Mathes, S. Heinzl, and B. Freisleben, "Towards a time-constrained web service infrastructure for industrial automation," in Proc. 13th IEEE Int. Conf. Emerging Technol. Factory Autom., Hamburg, Germany, Sep. 2008, pp. 846-853
-
(2008)
Proc. 13th IEEE Int. Conf. Emerging Technol. Factory Autom.
, pp. 846-853
-
-
Mathes, M.1
Heinzl, S.2
Freisleben, B.3
-
9
-
-
50249152555
-
Industrial processes supervision using service oriented architecture
-
Paris, France, Nov
-
F. S. L. Filho, A. L. T. B. da Fonseca, A. J. de Souza, F. A. Couto, R. P. R. dos Santos, and L. A. Guedes, "Industrial processes supervision using service oriented architecture," in Proc. 32nd IEEE Conf. Ind. Electron., Paris, France, Nov. 2006, pp. 4552-56
-
(2006)
Proc. 32nd IEEE Conf. Ind. Electron
, pp. 4552-4556
-
-
Filho, F.S.L.1
Da Fonseca, A.L.T.B.2
De Souza, A.J.3
Couto, R.P.R.4
Dos Santos, L.A.5
Guedes, F.A.6
-
10
-
-
79952624870
-
An efficient memetic algorithm for solving the job shop scheduling problem
-
May
-
L. Gao, G. Zhang, L. Zhang, and X. Li, "An efficient memetic algorithm for solving the job shop scheduling problem," Computers & Industrial Engineering, vol. 60, no. 4, pp. 699-705, May 2011
-
(2011)
Computers & Industrial Engineering
, vol.60
, Issue.4
, pp. 699-705
-
-
Gao, L.1
Zhang, G.2
Zhang, L.3
Li, X.4
-
11
-
-
78049360678
-
Minimizing the makespan in the non-preemptive job-shop scheduling with limited machine availability
-
Nov
-
Y. Mati, "Minimizing the makespan in the non-preemptive job-shop scheduling with limited machine availability," Comput. Ind. Eng., vol. 59, no. 4, pp. 537-543, Nov. 2010
-
(2010)
Comput. Ind. Eng
, vol.59
, Issue.4
, pp. 537-543
-
-
Mati, Y.1
-
12
-
-
79960041867
-
The implementation of a direct search approach for the resolution of complex and changing rule-based problems
-
Apr
-
A. J.Medland and J.Matthews, "The implementation of a direct search approach for the resolution of complex and changing rule-based problems," Eng. With Comput., vol. 27, no. 2, pp. 105-115, Apr. 2011
-
(2011)
Eng. with Comput
, vol.27
, Issue.2
, pp. 105-115
-
-
Medland, A.1
Matthews, J.2
-
13
-
-
80855131328
-
Constraint- based modelling and optimization to support the design of complex multi-domain engineering problems
-
Oct
-
R. Edmunds, J. A. Feldman, B. J. Hicks, and G. Mullineux, "Constraint- based modelling and optimization to support the design of complex multi-domain engineering problems," Eng.With Comput., vol. 27, no. 4, pp. 319-336, Oct. 2011
-
(2011)
Eng.With Comput
, vol.27
, Issue.4
, pp. 319-336
-
-
Edmunds, R.1
Feldman, J.A.2
Hicks, B.J.3
Mullineux, G.4
-
14
-
-
79955656034
-
A simulation-based scheduling system for real-time optimization and decision making support
-
M. Frantzen, H. C. Amos, and P. Moore, "A simulation-based scheduling system for real-time optimization and decision making support," Robot. Comput.-Integr.Manuf., vol. 27, no. 4, pp. 696-705,Aug. 2011
-
(2011)
Robot. Comput.-Integr.Manuf
, vol.27
, Issue.4
, pp. 696-705
-
-
Frantzen, M.1
Amos, H.C.2
Moore, P.3
-
15
-
-
84871766409
-
Limited preemptive scheduling for real-time systems. A survey
-
Feb
-
G. C. Butazzo, M. Bertogna, and Y. Gang, "Limited preemptive scheduling for real-time systems. A survey," IEEE Trans. Ind. Inf., vol. 9, no. 1, pp. 3-15, Feb. 2013
-
(2013)
IEEE Trans. Ind. Inf
, vol.9
, Issue.1
, pp. 3-15
-
-
Butazzo, G.C.1
Bertogna, M.2
Gang, Y.3
-
16
-
-
78049296921
-
A constraint programming approach to tool allocation and production scheduling in flexible manufacturing systems
-
Dec
-
L. J. Zeballos, "A constraint programming approach to tool allocation and production scheduling in flexible manufacturing systems," Robot. Comput.-Integr. Manuf., vol. 26, no. 6, pp. 725-743, Dec. 2010
-
(2010)
Robot. Comput.-Integr. Manuf
, vol.26
, Issue.6
, pp. 725-743
-
-
Zeballos, L.J.1
-
17
-
-
84855766616
-
Optimum loading of machines in a flexible manufacturing system using a mixed-integer linear mathematical programming model and genetic algorithm
-
Mar
-
A. M. Abazari, M. Solimanpur, and H. Sattari, "Optimum loading of machines in a flexible manufacturing system using a mixed-integer linear mathematical programming model and genetic algorithm," Comput. Ind. Eng., vol. 62, no. 2, pp. 469-478, Mar. 2012
-
(2012)
Comput. Ind. Eng
, vol.62
, Issue.2
, pp. 469-478
-
-
Abazari, A.M.1
Solimanpur, M.2
Sattari, H.3
-
18
-
-
84857124013
-
Simultaneous solving of balancing and sequencing problems with station-dependent assembly times for mixed-model assembly lines
-
Apr
-
H. Mosadegh, M. Zandieh, and S. M. T. Fatemi Ghomi, "Simultaneous solving of balancing and sequencing problems with station-dependent assembly times for mixed-model assembly lines," Appl. Soft Computing, vol. 12, no. 4, pp. 1359-1370, Apr. 2012
-
(2012)
Appl. Soft Computing
, vol.12
, Issue.4
, pp. 1359-1370
-
-
Mosadegh, H.1
Zandieh, M.2
Fatemi Ghomi, S.M.T.3
-
19
-
-
78049391572
-
Solving the single-machine sequencing problem using integer programming
-
Nov
-
K. R. Bakerm and B. Keller, "Solving the single-machine sequencing problem using integer programming," Comput. Ind. Eng., vol. 59, no. 4, pp. 730-735, Nov. 2010
-
(2010)
Comput. Ind. Eng
, vol.59
, Issue.4
, pp. 730-735
-
-
Bakerm, K.R.1
Keller, B.2
-
20
-
-
77950593573
-
Evaluation of mixed integer programming formulations for non-preemptive parallel machine scheduling problems
-
Mar
-
Y. Unlu and S. J. Mason, "Evaluation of mixed integer programming formulations for non-preemptive parallel machine scheduling problems," Comput. Ind. Eng., vol. 58, no. 4, pp. 785-800, Mar. 2012
-
(2012)
Comput. Ind. Eng
, vol.58
, Issue.4
, pp. 785-800
-
-
Unlu, Y.1
Mason, S.J.2
-
21
-
-
84855800871
-
Enhanced mixed integer programming model for a transfer line design problem
-
Mar
-
A. Dolgui, N. Guschinsky, and G. Levin, "Enhanced mixed integer programming model for a transfer line design problem," Comput. Ind. Eng., vol. 62, no. 2, pp. 570-578, Mar. 2012
-
(2012)
Comput. Ind. Eng
, vol.62
, Issue.2
, pp. 570-578
-
-
Dolgui, A.1
Guschinsky, N.2
Levin, G.3
-
22
-
-
78649477677
-
Advanced resource planning as a decision support module for ERP
-
Jan
-
I. V. Nieuwenhuyse, L. D. Boeck, M. Lambrecht, and N. J. Vandaele, "Advanced resource planning as a decision support module for ERP," Comput. Industry, vol. 62, no. 1, pp. 1-8, Jan. 2011
-
(2011)
Comput. Industry
, vol.62
, Issue.1
, pp. 1-8
-
-
Nieuwenhuyse, I.V.1
Boeck, L.D.2
Lambrecht, M.3
Vandaele, N.J.4
-
23
-
-
84871741730
-
Deadlock-free control of automated manufacturing systems with flexible routes and assembly operations using petri nets
-
Feb
-
H. Hesuan, Z.Mengchu, L. Zhiwu, and T.Ying, "Deadlock-free control of automated manufacturing systems with flexible routes and assembly operations using petri nets," IEEE Trans. Ind. Inf., vol. 9, no. 1, pp. 109-121, Feb. 2013
-
(2013)
IEEE Trans. Ind. Inf
, vol.9
, Issue.1
, pp. 109-121
-
-
Hesuan, H.1
Mengchu, Z.2
Zhiwu, L.3
Ying, T.4
-
24
-
-
33847734738
-
Intelligent control and integration software for flexible manufacturing cells
-
DOI 10.1109/TII.2006.890529
-
A. Ferrolho and M. Crisostomo, "Intelligent control and integration software for flexible manufacturing cells," IEEE Trans. Ind. Inf., vol. 3, no. 1, pp. 3-11, Feb. 2007 (Pubitemid 46384624)
-
(2007)
IEEE Transactions on Industrial Informatics
, vol.3
, Issue.1
, pp. 3-11
-
-
Ferrolho, A.1
Crisostomo, M.2
-
26
-
-
80855147909
-
Design and implementation of an OLE for process control unified architecture aggregating server for a group of flexible manufacturing systems
-
Aug
-
A.Girbea, S.Nechifor, F. Sisak, andL. Perniu, "Design and implementation of an OLE for process control unified architecture aggregating server for a group of flexible manufacturing systems," IET Software, vol. 5, no. 4, pp. 406-414, Aug. 2011
-
(2011)
IET Software
, vol.5
, Issue.4
, pp. 406-414
-
-
Girbea, A.1
Nechifor, S.2
Sisak, F.3
Perniu, L.4
-
27
-
-
84890940064
-
OPC UA Specification: Part 1-11
-
"OPC UA Specification: Part 1-11," OPC Foundation
-
OPC Foundation
-
-
-
28
-
-
84890910648
-
-
Online] Available:
-
[Online]. Available: http://opcfoundation.org/
-
-
-
-
29
-
-
84859440607
-
Efficient address space generation for an OPC UA server
-
A. Girbea, S. Nechifor, F. Sisak, and L. Perniu, "Efficient address space generation for an OPC UA server," Software-Practice and Experience, vol. 42, no. 5, pp. 543-557, 2012
-
(2012)
Software-Practice and Experience
, vol.42
, Issue.5
, pp. 543-557
-
-
Girbea, A.1
Nechifor, S.2
Sisak, F.3
Perniu, L.4
-
30
-
-
84859894562
-
Methods for reliable simulation-based PLC code verification
-
May
-
H. Carlsson, B. Svensson, F. Danielsson, and B. Lennartson, "Methods for reliable simulation-based PLC code verification," IEEE Trans. Iind. Inf., vol. 8, no. 2, pp. 267-278, May 2012
-
(2012)
IEEE Trans. Iind. Inf
, vol.8
, Issue.2
, pp. 267-278
-
-
Carlsson, H.1
Svensson, B.2
Danielsson, F.3
Lennartson, B.4
-
32
-
-
84869505568
-
Integration of scheduling and control with online closed-loop implementation: Fast computational strategy and largescale global optimization algorithm
-
Y. Chu and F. You, "Integration of scheduling and control with online closed-loop implementation: Fast computational strategy and largescale global optimization algorithm," Comput. Chem. Eng., vol. 47, no. 20, pp. 248-268, 2012
-
(2012)
Comput. Chem. Eng
, vol.47
, Issue.20
, pp. 248-268
-
-
Chu, Y.1
You, F.2
-
33
-
-
84871797848
-
Distance bounding: A practical security solution for real-time location systems
-
Feb
-
A. Abu-Mahfouz and G. Hancke, "Distance bounding: A practical security solution for real-time location systems?," IEEE Trans. Ind. Inf., vol. 9, no. 1, pp. 16-27, Feb. 2013.
-
(2013)
IEEE Trans. Ind. Inf
, vol.9
, Issue.1
, pp. 16-27
-
-
Abu-Mahfouz, A.1
Hancke, G.2
|