메뉴 건너뛰기




Volumn 112, Issue , 2016, Pages 2015-2028

Optimal production policy for a closed-loop hybrid system with uncertain demand and return under supply disruption

Author keywords

Closed loop supply chain; Hybrid system; Manufacturing; Remanufacturing; Supply disruption; Unreliable supplier

Indexed keywords

HYBRID SYSTEMS; LINEAR MATRIX INEQUALITIES; MANUFACTURE; SENSITIVITY ANALYSIS; STOCHASTIC SYSTEMS;

EID: 84953260587     PISSN: 09596526     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jclepro.2015.06.147     Document Type: Article
Times cited : (90)

References (64)
  • 1
    • 79551650944 scopus 로고    scopus 로고
    • Quantitative models for inventory and production planning in closed-loop supply chains
    • E. Akali, and S. Cetinkaya Quantitative models for inventory and production planning in closed-loop supply chains Int. J. Prod. Res. 49 8 2011 2373 2407
    • (2011) Int. J. Prod. Res. , vol.49 , Issue.8 , pp. 2373-2407
    • Akali, E.1    Cetinkaya, S.2
  • 2
    • 84872621211 scopus 로고    scopus 로고
    • A multi-objective facility location model for closed-loop supply chain network under uncertain demand and return
    • S.H. Amin, and G. Zhang A multi-objective facility location model for closed-loop supply chain network under uncertain demand and return Appl. Math. Model. 37 6 2013 4165 4176
    • (2013) Appl. Math. Model. , vol.37 , Issue.6 , pp. 4165-4176
    • Amin, S.H.1    Zhang, G.2
  • 3
    • 1642375700 scopus 로고    scopus 로고
    • The effect of categorizing returned products in remanufacturing
    • N. Aras, T. Boyaci, and V. Verter The effect of categorizing returned products in remanufacturing IIE Trans. 36 4 2004 319 331
    • (2004) IIE Trans. , vol.36 , Issue.4 , pp. 319-331
    • Aras, N.1    Boyaci, T.2    Verter, V.3
  • 4
    • 33846287029 scopus 로고    scopus 로고
    • Coordination and priority decisions in hybrid manufacturing/remanufacturing systems
    • N. Aras, V. Verter, and T. Boyaci Coordination and priority decisions in hybrid manufacturing/remanufacturing systems Prod. Oper. Manag. 15 4 2006 528 543
    • (2006) Prod. Oper. Manag. , vol.15 , Issue.4 , pp. 528-543
    • Aras, N.1    Verter, V.2    Boyaci, T.3
  • 5
    • 54349086605 scopus 로고    scopus 로고
    • Product reuse economics in closed-loop supply chain research
    • A. Atasu, V.D.R. Guide Jr., and L.N. Wassenhove Product reuse economics in closed-loop supply chain research Prod. Oper. Manag. 17 5 2008 483 496
    • (2008) Prod. Oper. Manag. , vol.17 , Issue.5 , pp. 483-496
    • Atasu, A.1    Guide, V.D.R.2    Wassenhove, L.N.3
  • 6
    • 84872977689 scopus 로고    scopus 로고
    • Design and planning of supply chains with integration of reverse logistics activities under demand uncertainty
    • S.R. Cardoso, A.P.F.D. Barbosa-Povoa, and S. Relvas Design and planning of supply chains with integration of reverse logistics activities under demand uncertainty Eur. J. Oper. Res. 226 3 2013 436 451
    • (2013) Eur. J. Oper. Res. , vol.226 , Issue.3 , pp. 436-451
    • Cardoso, S.R.1    Barbosa-Povoa, A.P.F.D.2    Relvas, S.3
  • 8
    • 34247556105 scopus 로고    scopus 로고
    • A generalized ordering and recovery policy for reusable items
    • D.W. Choi, H. Hwang, and S.G. Koh A generalized ordering and recovery policy for reusable items Eur. J. Oper. Res. 182 2 2007 764 774
    • (2007) Eur. J. Oper. Res. , vol.182 , Issue.2 , pp. 764-774
    • Choi, D.W.1    Hwang, H.2    Koh, S.G.3
  • 9
    • 34547673287 scopus 로고    scopus 로고
    • The importance of decoupling recurrent and disruption risks in a supply chain
    • S. Chopra, G. Reinhardt, and U. Mohan The importance of decoupling recurrent and disruption risks in a supply chain Nav. Res. Logist. 54 5 2007 544 555
    • (2007) Nav. Res. Logist. , vol.54 , Issue.5 , pp. 544-555
    • Chopra, S.1    Reinhardt, G.2    Mohan, U.3
  • 10
    • 47749115026 scopus 로고    scopus 로고
    • Optimal policy for a closed-loop supply chain inventory system with remanufacturing
    • S.L. Chung, H.M. Wee, and P.C. Yang Optimal policy for a closed-loop supply chain inventory system with remanufacturing Math. Comput. Model. 48 5 2008 867 881
    • (2008) Math. Comput. Model. , vol.48 , Issue.5 , pp. 867-881
    • Chung, S.L.1    Wee, H.M.2    Yang, P.C.3
  • 11
    • 84921369040 scopus 로고    scopus 로고
    • Managing supply uncertainty under supply chain Cournot competition
    • Y. Fang, and B. Shou Managing supply uncertainty under supply chain Cournot competition Eur. J. Oper. Res. 243 1 2014 156 176
    • (2014) Eur. J. Oper. Res. , vol.243 , Issue.1 , pp. 156-176
    • Fang, Y.1    Shou, B.2
  • 12
    • 0036532642 scopus 로고    scopus 로고
    • Controlling inventories with stochastic item returns: A basic model
    • M. Fleischmann, R. Kuik, and R. Dekker Controlling inventories with stochastic item returns: a basic model Eur. J. Oper. Res. 138 1 2002 63 75
    • (2002) Eur. J. Oper. Res. , vol.138 , Issue.1 , pp. 63-75
    • Fleischmann, M.1    Kuik, R.2    Dekker, R.3
  • 13
    • 56549125540 scopus 로고    scopus 로고
    • Manufacturing network configuration in supply chains with product recovery
    • D. Francas, and S. Minner Manufacturing network configuration in supply chains with product recovery Omega 37 4 2009 757 769
    • (2009) Omega , vol.37 , Issue.4 , pp. 757-769
    • Francas, D.1    Minner, S.2
  • 14
    • 84928712116 scopus 로고    scopus 로고
    • Optimizing a closed-loop supply chain with manufacturing defects and quality dependent return rate
    • B.C. Giri, and S. Sharma Optimizing a closed-loop supply chain with manufacturing defects and quality dependent return rate J. Manuf. Syst. 35 2015 92 111
    • (2015) J. Manuf. Syst. , vol.35 , pp. 92-111
    • Giri, B.C.1    Sharma, S.2
  • 15
    • 84907580954 scopus 로고    scopus 로고
    • Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future
    • K. Govindan, H. Soleimani, and D. Kannan Reverse logistics and closed-loop supply chain: a comprehensive review to explore the future Eur. J. Oper. Res. 240 1 2015 603 626
    • (2015) Eur. J. Oper. Res. , vol.240 , Issue.1 , pp. 603-626
    • Govindan, K.1    Soleimani, H.2    Kannan, D.3
  • 17
    • 0038967774 scopus 로고    scopus 로고
    • Managing product returns for remanufacturing
    • V.D.R. Guide Jr., and L.N.V. Wassenhove Managing product returns for remanufacturing Prod. Oper. Manag. 10 2 2001 142 155
    • (2001) Prod. Oper. Manag. , vol.10 , Issue.2 , pp. 142-155
    • Guide, V.D.R.1    Wassenhove, L.N.V.2
  • 18
    • 84947046047 scopus 로고    scopus 로고
    • Optimal strategies for manufacturing/remanufacturing system with the consideration of recycled products
    • J. Guo, and G. Ya Optimal strategies for manufacturing/remanufacturing system with the consideration of recycled products Comput. Ind. Eng. 2015 http://dx.doi.org/10.1016/j.cie.2014.11.020
    • (2015) Comput. Ind. Eng.
    • Guo, J.1    Ya, G.2
  • 19
    • 85018221185 scopus 로고    scopus 로고
    • Design for remanufacturing in China: A case study of electrical and electronic equipment
    • G.D. Hatcher, W.L. Ijomah, and J.F.C. Windmill Design for remanufacturing in China: a case study of electrical and electronic equipment J. Remanuf. 3 3 2013 1 11
    • (2013) J. Remanuf. , vol.3 , Issue.3 , pp. 1-11
    • Hatcher, G.D.1    Ijomah, W.L.2    Windmill, J.F.C.3
  • 20
    • 84896542713 scopus 로고    scopus 로고
    • A recovery mechanism for a two echelon supply chain system under supply disruption
    • H. Hishamuddin, R.A. Sarker, and D. Essam A recovery mechanism for a two echelon supply chain system under supply disruption Econ. Model. 38 2014 555 563
    • (2014) Econ. Model. , vol.38 , pp. 555-563
    • Hishamuddin, H.1    Sarker, R.A.2    Essam, D.3
  • 21
    • 77954311908 scopus 로고    scopus 로고
    • Coordination with a backup supplier through buy-back contract under supply disruption
    • J. Hou, A.Z. Zeng, and L. Zhao Coordination with a backup supplier through buy-back contract under supply disruption Transp. Res. E 46 6 2010 881 895
    • (2010) Transp. Res. E , vol.46 , Issue.6 , pp. 881-895
    • Hou, J.1    Zeng, A.Z.2    Zhao, L.3
  • 22
    • 80051551838 scopus 로고    scopus 로고
    • An inventory control model with consideration of remanufacturing and product life cycle
    • C.F. Hsueh An inventory control model with consideration of remanufacturing and product life cycle Int. J. Prod. Econ. 133 2 2011 645 652
    • (2011) Int. J. Prod. Econ. , vol.133 , Issue.2 , pp. 645-652
    • Hsueh, C.F.1
  • 23
    • 0035899631 scopus 로고    scopus 로고
    • Product recovery in stochastic remanufacturing systems with multiple reuse options
    • K. Inderfurth, A.G.D. Kok, and S.D.P. Flapper Product recovery in stochastic remanufacturing systems with multiple reuse options Eur. J. Oper. Res. 133 1 2001 130 152
    • (2001) Eur. J. Oper. Res. , vol.133 , Issue.1 , pp. 130-152
    • Inderfurth, K.1    Kok, A.G.D.2    Flapper, S.D.P.3
  • 24
    • 2942631362 scopus 로고    scopus 로고
    • Optimal policies in hybrid manufacturing/remanufacturing systems with product substitution
    • K. Inderfurth Optimal policies in hybrid manufacturing/remanufacturing systems with product substitution Int. J. Prod. Econ. 90 3 2004 325 343
    • (2004) Int. J. Prod. Econ. , vol.90 , Issue.3 , pp. 325-343
    • Inderfurth, K.1
  • 25
    • 21244492844 scopus 로고    scopus 로고
    • Impact of uncertainties on recovery behavior in a remanufacturing environment
    • K. Inderfurth Impact of uncertainties on recovery behavior in a remanufacturing environment Int. J. Phys. Distrib. Logist. Manag. 35 5 2005 318 336
    • (2005) Int. J. Phys. Distrib. Logist. Manag. , vol.35 , Issue.5 , pp. 318-336
    • Inderfurth, K.1
  • 27
    • 32644458769 scopus 로고    scopus 로고
    • Production planning for closed-loop supply chains with product recovery and reuse: An analytical approach
    • V. Jayaraman Production planning for closed-loop supply chains with product recovery and reuse: an analytical approach Int. J. Prod. Res. 44 5 2006 981 998
    • (2006) Int. J. Prod. Res. , vol.44 , Issue.5 , pp. 981-998
    • Jayaraman, V.1
  • 28
    • 84905978170 scopus 로고    scopus 로고
    • Price competition and co-operation in a duopoly closed-loop supply chain
    • S.K. Jena, and S.P. Sarmah Price competition and co-operation in a duopoly closed-loop supply chain Int. J. Prod. Econ. 156 1 2014 346 360
    • (2014) Int. J. Prod. Econ. , vol.156 , Issue.1 , pp. 346-360
    • Jena, S.K.1    Sarmah, S.P.2
  • 29
    • 1242332759 scopus 로고    scopus 로고
    • Model for the allocation of electronics components to reuse options
    • S. Jorjani, J. Leu, and C. Scott Model for the allocation of electronics components to reuse options Int. J. Prod. Res. 42 6 2004 1131 1145
    • (2004) Int. J. Prod. Res. , vol.42 , Issue.6 , pp. 1131-1145
    • Jorjani, S.1    Leu, J.2    Scott, C.3
  • 30
    • 80055031645 scopus 로고    scopus 로고
    • Production planning of a hybrid manufacturing-remanufacturing system under uncertainty within a closed-loop supply chain
    • J.P. Kenne, P. Dejax, and A. Gharbi Production planning of a hybrid manufacturing-remanufacturing system under uncertainty within a closed-loop supply chain Int. J. Prod. Econ. 135 1 2012 81 93
    • (2012) Int. J. Prod. Econ. , vol.135 , Issue.1 , pp. 81-93
    • Kenne, J.P.1    Dejax, P.2    Gharbi, A.3
  • 31
    • 47549113619 scopus 로고    scopus 로고
    • Corporate responsibility in the supply chain
    • G. Kovacs Corporate responsibility in the supply chain J. Clean. Prod. 16 15 2008 1571 1578
    • (2008) J. Clean. Prod. , vol.16 , Issue.15 , pp. 1571-1578
    • Kovacs, G.1
  • 32
    • 74449091492 scopus 로고    scopus 로고
    • Competition and cooperation in a single-retailer two-suppliers supply chain with supply disruption
    • J. Li, S. Wang, and T.C.E. Cheng Competition and cooperation in a single-retailer two-suppliers supply chain with supply disruption Int. J. Prod. Econ. 124 1 2010 137 150
    • (2010) Int. J. Prod. Econ. , vol.124 , Issue.1 , pp. 137-150
    • Li, J.1    Wang, S.2    Cheng, T.C.E.3
  • 33
    • 84912080742 scopus 로고    scopus 로고
    • Remanufacturing and pricing decisions with random yield and random demand
    • X. Li, Y. Li, and X. Cai Remanufacturing and pricing decisions with random yield and random demand Comput. Oper. Res. 54 2015 195 203
    • (2015) Comput. Oper. Res. , vol.54 , pp. 195-203
    • Li, X.1    Li, Y.2    Cai, X.3
  • 34
    • 84881545325 scopus 로고    scopus 로고
    • Robust optimal dynamic production/pricing policies in a closed-loop system
    • M. Mahmoudzadeh, S.J. Sadjadi, and S. Mansour Robust optimal dynamic production/pricing policies in a closed-loop system Appl. Math. Model. 37 16-17 2013 8141 8161
    • (2013) Appl. Math. Model. , vol.37 , Issue.16-17 , pp. 8141-8161
    • Mahmoudzadeh, M.1    Sadjadi, S.J.2    Mansour, S.3
  • 35
    • 84954058505 scopus 로고    scopus 로고
    • A closed loop supply chain under retail price and product quality dependent demand
    • T. Maiti, and B.C. Giri A closed loop supply chain under retail price and product quality dependent demand J. Manuf. Syst. 2014 http://dx.doi.org/10.1016/j.jmsy.2014.09.009
    • (2014) J. Manuf. Syst.
    • Maiti, T.1    Giri, B.C.2
  • 36
    • 33845232992 scopus 로고    scopus 로고
    • Revenue management for remanufactured products
    • S. Mitra Revenue management for remanufactured products Omega 35 5 2007 553 562
    • (2007) Omega , vol.35 , Issue.5 , pp. 553-562
    • Mitra, S.1
  • 37
    • 44949109044 scopus 로고    scopus 로고
    • Analysis of a two-echelon inventory system with returns
    • S. Mitra Analysis of a two-echelon inventory system with returns Omega 37 1 2009 106 115
    • (2009) Omega , vol.37 , Issue.1 , pp. 106-115
    • Mitra, S.1
  • 38
    • 84858698509 scopus 로고    scopus 로고
    • Inventory management in a two-echelon closed-loop supply chain with correlated demands and returns
    • S. Mitra Inventory management in a two-echelon closed-loop supply chain with correlated demands and returns Comput. Ind. Eng. 62 4 2012 870 879
    • (2012) Comput. Ind. Eng. , vol.62 , Issue.4 , pp. 870-879
    • Mitra, S.1
  • 39
    • 67649410319 scopus 로고    scopus 로고
    • Joint procurement and production decisions in remanufacturing under quality and demand uncertainty
    • S.K. Mukhopadhyay, and H. Ma Joint procurement and production decisions in remanufacturing under quality and demand uncertainty Int. J. Prod. Econ. 120 1 2009 5 17
    • (2009) Int. J. Prod. Econ. , vol.120 , Issue.1 , pp. 5-17
    • Mukhopadhyay, S.K.1    Ma, H.2
  • 40
    • 0000317841 scopus 로고    scopus 로고
    • Inventory models for future supply uncertainty with single and multiple suppliers
    • M. Parlar, and D. Perry Inventory models for future supply uncertainty with single and multiple suppliers Nav. Res. Logist. 43 2 1996 191 210
    • (1996) Nav. Res. Logist. , vol.43 , Issue.2 , pp. 191-210
    • Parlar, M.1    Perry, D.2
  • 41
    • 84867022368 scopus 로고    scopus 로고
    • The closed-loop supply chain network with competition, distribution channel investment, and uncertainties
    • Q. Qiang, K. Ke, T. Anderson, and J. Dong The closed-loop supply chain network with competition, distribution channel investment, and uncertainties Omega 41 2 2013 186 194
    • (2013) Omega , vol.41 , Issue.2 , pp. 186-194
    • Qiang, Q.1    Ke, K.2    Anderson, T.3    Dong, J.4
  • 42
    • 84865683306 scopus 로고    scopus 로고
    • Investing in reusability of products of uncertain remanufacturing cost: The role of inspection capabilities
    • A. Robotis, T. Boyaci, and V. Verter Investing in reusability of products of uncertain remanufacturing cost: the role of inspection capabilities Int. J. Prod. Econ. 140 1 2012 385 395
    • (2012) Int. J. Prod. Econ. , vol.140 , Issue.1 , pp. 385-395
    • Robotis, A.1    Boyaci, T.2    Verter, V.3
  • 43
    • 43449105121 scopus 로고    scopus 로고
    • Optimal manufacturing-remanufacturing policies in a lean production environment
    • S. Rubio, and A. Corominas Optimal manufacturing-remanufacturing policies in a lean production environment Comput. Ind. Eng. 55 1 2008 234 242
    • (2008) Comput. Ind. Eng. , vol.55 , Issue.1 , pp. 234-242
    • Rubio, S.1    Corominas, A.2
  • 44
    • 72149096540 scopus 로고    scopus 로고
    • Issues in reverse supply chains. Part II. Reverse distribution issues-an overview
    • P. Sasikumar, and G. Kannan Issues in reverse supply chains. Part II. Reverse distribution issues-an overview Int. J. Sustain. Eng. 1 4 2008 234 249
    • (2008) Int. J. Sustain. Eng. , vol.1 , Issue.4 , pp. 234-249
    • Sasikumar, P.1    Kannan, G.2
  • 45
    • 84921279023 scopus 로고    scopus 로고
    • Centralization versus decentralization: Risk pooling, risk diversification, and supply chain disruptions
    • A.J. Schmitt, S.A. Sun, L.V. Snyder, and Z.J.M. Shen Centralization versus decentralization: risk pooling, risk diversification, and supply chain disruptions Omega 52 2014 201 212
    • (2014) Omega , vol.52 , pp. 201-212
    • Schmitt, A.J.1    Sun, S.A.2    Snyder, L.V.3    Shen, Z.J.M.4
  • 46
    • 79956188582 scopus 로고    scopus 로고
    • Optimal production and pricing policy for a closed loop system
    • J. Shi, G. Zhang, and J. Sha Optimal production and pricing policy for a closed loop system Resour. Conserv. Recycl. 55 6 2011 639 647
    • (2011) Resour. Conserv. Recycl. , vol.55 , Issue.6 , pp. 639-647
    • Shi, J.1    Zhang, G.2    Sha, J.3
  • 47
    • 77957311584 scopus 로고    scopus 로고
    • Optimal production planning for a multi-product closed loop system with uncertain demand and return
    • J. Shi, G. Zhang, and J. Sha Optimal production planning for a multi-product closed loop system with uncertain demand and return Comput. Oper. Res. 38 3 2011 641 650
    • (2011) Comput. Oper. Res. , vol.38 , Issue.3 , pp. 641-650
    • Shi, J.1    Zhang, G.2    Sha, J.3
  • 48
    • 78650516234 scopus 로고    scopus 로고
    • Coordinating production and recycling decisions with stochastic demand and return
    • J. Shi, G. Zhang, J. Sha, and S.H. Amin Coordinating production and recycling decisions with stochastic demand and return J. Syst. Sci. Syst. Eng. 19 4 2010 385 407
    • (2010) J. Syst. Sci. Syst. Eng. , vol.19 , Issue.4 , pp. 385-407
    • Shi, J.1    Zhang, G.2    Sha, J.3    Amin, S.H.4
  • 49
    • 84893778524 scopus 로고    scopus 로고
    • A multiple sourcing inventory model under disruption risk
    • L. Silbermayr, and S. Minner A multiple sourcing inventory model under disruption risk Int. J. Prod. Econ. 149 2014 37 46
    • (2014) Int. J. Prod. Econ. , vol.149 , pp. 37-46
    • Silbermayr, L.1    Minner, S.2
  • 50
    • 84906230473 scopus 로고    scopus 로고
    • A tight approximation for an EOQ model with supply disruptions
    • L.V. Snyder A tight approximation for an EOQ model with supply disruptions Int. J. Prod. Econ. 155 2014 91 108
    • (2014) Int. J. Prod. Econ. , vol.155 , pp. 91-108
    • Snyder, L.V.1
  • 51
    • 78650414341 scopus 로고    scopus 로고
    • Optimal core acquisition and remanufacturing policies under uncertain core quality fractions
    • R.H. Teunter, and S.D.P. Flapper Optimal core acquisition and remanufacturing policies under uncertain core quality fractions Eur. J. Oper. Res. 210 2 2011 241 248
    • (2011) Eur. J. Oper. Res. , vol.210 , Issue.2 , pp. 241-248
    • Teunter, R.H.1    Flapper, S.D.P.2
  • 52
    • 1642393082 scopus 로고    scopus 로고
    • Strategic management of product recovery
    • M.W. Toffel Strategic management of product recovery Calif. Manag. Rev. 46 2 2004 120 141
    • (2004) Calif. Manag. Rev. , vol.46 , Issue.2 , pp. 120-141
    • Toffel, M.W.1
  • 53
    • 33646342992 scopus 로고    scopus 로고
    • On the value of mitigation and contingency strategies for managing supply chain disruption risk
    • B. Tomlin On the value of mitigation and contingency strategies for managing supply chain disruption risk Manag. Sci. 52 5 2006 639 657
    • (2006) Manag. Sci. , vol.52 , Issue.5 , pp. 639-657
    • Tomlin, B.1
  • 54
    • 84890496427 scopus 로고    scopus 로고
    • Close-loop or open hierarchical structures in green supply chain management under uncertainty
    • M.L. Tseng, R.J. Lin, Y.H. Lin, R.H. Chen, and K. Tan Close-loop or open hierarchical structures in green supply chain management under uncertainty Expert Syst. Appl. 41 7 2014 3250 3260
    • (2014) Expert Syst. Appl. , vol.41 , Issue.7 , pp. 3250-3260
    • Tseng, M.L.1    Lin, R.J.2    Lin, Y.H.3    Chen, R.H.4    Tan, K.5
  • 56
    • 79751526499 scopus 로고    scopus 로고
    • Optimum policy in hybrid manufacturing/remanufacturing system
    • J. Wang, J. Zhao, and X. Wang Optimum policy in hybrid manufacturing/remanufacturing system Comput. Ind. Eng. 60 3 2011 411 419
    • (2011) Comput. Ind. Eng. , vol.60 , Issue.3 , pp. 411-419
    • Wang, J.1    Zhao, J.2    Wang, X.3
  • 57
    • 78651307422 scopus 로고    scopus 로고
    • Robust optimal policies of production and inventory with uncertain returns and demand
    • C. Wei, Y. Li, and X. Cai Robust optimal policies of production and inventory with uncertain returns and demand Int. J. Prod. Econ. 134 2 2011 357 367
    • (2011) Int. J. Prod. Econ. , vol.134 , Issue.2 , pp. 357-367
    • Wei, C.1    Li, Y.2    Cai, X.3
  • 58
    • 84893877378 scopus 로고    scopus 로고
    • A business process management capabilities perspective on organization performance
    • Y.P. Wong, M.L. Tseng, and K. Tan A business process management capabilities perspective on organization performance Total Qual. Manag. Bus. Excell. 25 6 2014 602 627
    • (2014) Total Qual. Manag. Bus. Excell. , vol.25 , Issue.6 , pp. 602-627
    • Wong, Y.P.1    Tseng, M.L.2    Tan, K.3
  • 59
    • 70249101036 scopus 로고    scopus 로고
    • Collection pricing decision in a remanufacturing system considering random yield and random demand
    • L.I. Xiang, L.I. Yong-jian, and C.A.I. Xiao-qiang Collection pricing decision in a remanufacturing system considering random yield and random demand Syst. Eng. Theory Pract. 29 8 2009 19 27
    • (2009) Syst. Eng. Theory Pract. , vol.29 , Issue.8 , pp. 19-27
    • Xiang, L.I.1    Yong-Jian, L.I.2    Xiao-Qiang, C.A.I.3
  • 60
    • 77953132298 scopus 로고    scopus 로고
    • Sequential and global optimization for a closed-loop deteriorating inventory supply chain
    • P.C. Yang, H.M. Wee, S.L. Chung, and P.C. Ho Sequential and global optimization for a closed-loop deteriorating inventory supply chain Math. Comput. Model. 52 1 2010 161 176
    • (2010) Math. Comput. Model. , vol.52 , Issue.1 , pp. 161-176
    • Yang, P.C.1    Wee, H.M.2    Chung, S.L.3    Ho, P.C.4
  • 61
    • 84869488985 scopus 로고    scopus 로고
    • Addressing the uncertain quality and quantity of returns in closed-loop supply chains
    • L.J. Zeballos, M.I. Gomes, A.P. Barbosa-Povoa, and A.Q. Novais Addressing the uncertain quality and quantity of returns in closed-loop supply chains Comput. Chem. Eng. 47 2012 237 247
    • (2012) Comput. Chem. Eng. , vol.47 , pp. 237-247
    • Zeballos, L.J.1    Gomes, M.I.2    Barbosa-Povoa, A.P.3    Novais, A.Q.4
  • 62
    • 84900793304 scopus 로고    scopus 로고
    • A hybrid two-stock inventory control model for a reverse supply chain
    • H. Zolfagharinia, M. Hafezi, R.Z. Farahani, and B. Fahimnia A hybrid two-stock inventory control model for a reverse supply chain Transp. Res. E 67 2014 141 161
    • (2014) Transp. Res. E , vol.67 , pp. 141-161
    • Zolfagharinia, H.1    Hafezi, M.2    Farahani, R.Z.3    Fahimnia, B.4
  • 63
    • 31044432628 scopus 로고    scopus 로고
    • Dynamic performance of a hybrid inventory system with a Kanban policy in remanufacturing process
    • L. Zhou, M.M. Naim, Q. Tang, and Q.R. Towill Dynamic performance of a hybrid inventory system with a Kanban policy in remanufacturing process Omega 34 6 2006 585 598
    • (2006) Omega , vol.34 , Issue.6 , pp. 585-598
    • Zhou, L.1    Naim, M.M.2    Tang, Q.3    Towill, Q.R.4
  • 64
    • 79951911651 scopus 로고    scopus 로고
    • Optimal control of inventory systems with multiple types of remanufacturable products
    • S.X. Zhou, Z. Tao, and X. Chao Optimal control of inventory systems with multiple types of remanufacturable products Manuf. Serv. Oper. Manag. 13 1 2011 20 34
    • (2011) Manuf. Serv. Oper. Manag. , vol.13 , Issue.1 , pp. 20-34
    • Zhou, S.X.1    Tao, Z.2    Chao, X.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.