메뉴 건너뛰기




Volumn 223, Issue 1, 2014, Pages 217-237

Benchmarking non-first-come-first-served component allocation in an assemble-to-order system

Author keywords

Assemble to order; Benchmark; Non first come first served; Periodic review; Service differentiation

Indexed keywords


EID: 84939896605     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1007/s10479-014-1629-z     Document Type: Article
Times cited : (5)

References (39)
  • 1
    • 0035426460 scopus 로고    scopus 로고
    • Optimal material control in an assembly system with component commonality
    • Agrawal, N., & Cohen, M. (2001). Optimal material control in an assembly system with component commonality. Naval Research Logistics, 48, 409–429.
    • (2001) Naval Research Logistics , vol.48 , pp. 409-429
    • Agrawal, N.1    Cohen, M.2
  • 3
    • 17344394414 scopus 로고    scopus 로고
    • Joint inventory replenishment and component allocation optimization in an assemble-to-order system
    • Akcay, Y., & Xu, S. (2004). Joint inventory replenishment and component allocation optimization in an assemble-to-order system. Management Science, 50(1), 99–116.
    • (2004) Management Science , vol.50 , Issue.1 , pp. 99-116
    • Akcay, Y.1    Xu, S.2
  • 6
    • 33845541662 scopus 로고    scopus 로고
    • Production and inventory control of a single product assemble-to-order system with multiple customer classes
    • Benjaafar, S., & ElHafsi, M. (2006). Production and inventory control of a single product assemble-to-order system with multiple customer classes. Manufacturing and Service Operations Management, 52(12), 1896–1912.
    • (2006) Manufacturing and Service Operations Management , vol.52 , Issue.12 , pp. 1896-1912
    • Benjaafar, S.1    ElHafsi, M.2
  • 8
    • 0037769039 scopus 로고    scopus 로고
    • A threshold inventory rationing policy for service-differentiated demand classes
    • Deshpande, V., Cohen, M., & Donohue, K. (2003). A threshold inventory rationing policy for service-differentiated demand classes. Management Science, 49(6), 683–703.
    • (2003) Management Science , vol.49 , Issue.6 , pp. 683-703
    • Deshpande, V.1    Cohen, M.2    Donohue, K.3
  • 9
    • 77953560961 scopus 로고    scopus 로고
    • A stochastic programming based inventory policy for assemble-to-order systems with application to the w model
    • Dogru, M., Reiman, M., & Wang, Q. (2010). A stochastic programming based inventory policy for assemble-to-order systems with application to the w model. Operations Research, 58(4), 849–864.
    • (2010) Operations Research , vol.58 , Issue.4 , pp. 849-864
    • Dogru, M.1    Reiman, M.2    Wang, Q.3
  • 10
    • 54049092532 scopus 로고    scopus 로고
    • Optimal integrated production and inventory control of an assemble-to-order system with multiple non-unitary demand classes
    • ElHafsi, M. (2009). Optimal integrated production and inventory control of an assemble-to-order system with multiple non-unitary demand classes. European Journal of Operational Research, 194(1), 127–142.
    • (2009) European Journal of Operational Research , vol.194 , Issue.1 , pp. 127-142
    • ElHafsi, M.1
  • 11
    • 33847070855 scopus 로고    scopus 로고
    • Inventory and production decisions for an assemble-to-order system with uncertain demand and limited assembly capacity
    • Fu, K., Hsu, V., & Lee, C. (2006). Inventory and production decisions for an assemble-to-order system with uncertain demand and limited assembly capacity. Operations Research, 54(6), 1137–1150.
    • (2006) Operations Research , vol.54 , Issue.6 , pp. 1137-1150
    • Fu, K.1    Hsu, V.2    Lee, C.3
  • 12
    • 0032169180 scopus 로고    scopus 로고
    • Order response time reliablity in a multi-item inventory system
    • Hausman, W., Lee, H., & Zhang, A. (1998). Order response time reliablity in a multi-item inventory system. European Journal of Operational Research, 109, 646–659.
    • (1998) European Journal of Operational Research , vol.109 , pp. 646-659
    • Hausman, W.1    Lee, H.2    Zhang, A.3
  • 13
    • 33644931174 scopus 로고    scopus 로고
    • Optimal component stocking policy for assemble-to-order systems with lead-time-dependent component and product pricing
    • Hsu, V., Lee, C., & So, K. (2006). Optimal component stocking policy for assemble-to-order systems with lead-time-dependent component and product pricing. Management Science, 52(3), 337–351.
    • (2006) Management Science , vol.52 , Issue.3 , pp. 337-351
    • Hsu, V.1    Lee, C.2    So, K.3
  • 14
    • 84939879281 scopus 로고    scopus 로고
    • Cost minimization in a periodic review assemble-to-order system
    • Huang, K., & de Kok, T. (2014). Cost minimization in a periodic review assemble-to-order system. Working paper (pp. 1–22).
    • (2014) Working paper , pp. 1-22
    • Huang, K.1    de Kok, T.2
  • 17
    • 0031996860 scopus 로고    scopus 로고
    • Variability reduction through operations reversal
    • Lee, H., & Tang, C. (1998). Variability reduction through operations reversal. Management Science, 44(2), 162–172.
    • (1998) Management Science , vol.44 , Issue.2 , pp. 162-172
    • Lee, H.1    Tang, C.2
  • 18
    • 0032204975 scopus 로고    scopus 로고
    • A bibliographical survey on some well-known non-standard knapsack problems
    • Lin, E. H. (1998). A bibliographical survey on some well-known non-standard knapsack problems. Information Systems and Operational Research, 36(4), 274–317.
    • (1998) Information Systems and Operational Research , vol.36 , Issue.4 , pp. 274-317
    • Lin, E.H.1
  • 19
    • 33846699374 scopus 로고    scopus 로고
    • Estimation of average backordres for an assemble-to-order sytem with random batch demands through extreme statistics
    • Lu, Y. (2006). Estimation of average backordres for an assemble-to-order sytem with random batch demands through extreme statistics. Naval Reserach Logistics, 54(1), 33–45.
    • (2006) Naval Reserach Logistics , vol.54 , Issue.1 , pp. 33-45
    • Lu, Y.1
  • 20
    • 14644436351 scopus 로고    scopus 로고
    • Order-based cost minimization in assemble-to-order systems
    • Lu, Y., & Song, J. (2005). Order-based cost minimization in assemble-to-order systems. Operations Research, 53(1), 151–169.
    • (2005) Operations Research , vol.53 , Issue.1 , pp. 151-169
    • Lu, Y.1    Song, J.2
  • 21
    • 4344612887 scopus 로고    scopus 로고
    • Order fill rate, lead time variability, and advance demand information in an assemble-to-order system
    • Lu, Y., Song, J., & Yao, D. (2003). Order fill rate, lead time variability, and advance demand information in an assemble-to-order system. Operations Research, 51(2), 292–308.
    • (2003) Operations Research , vol.51 , Issue.2 , pp. 292-308
    • Lu, Y.1    Song, J.2    Yao, D.3
  • 22
    • 77953575916 scopus 로고    scopus 로고
    • No-holdback allocation rules for continuous-time assemble-to-order systems
    • Lu, Y., Song, J., & Zhao, Y. (2010). No-holdback allocation rules for continuous-time assemble-to-order systems. Operations Research, 58(3), 691–705.
    • (2010) Operations Research , vol.58 , Issue.3 , pp. 691-705
    • Lu, Y.1    Song, J.2    Zhao, Y.3
  • 23
    • 84939893894 scopus 로고    scopus 로고
    • Integer programming approaches to two nonconvex optimization problems. Ph.D
    • Luedtke, J. (2007). Integer programming approaches to two nonconvex optimization problems. Ph.D., Georgia Institute of Technology.
    • (2007) Georgia Institute of Technology
    • Luedtke, J.1
  • 24
    • 67649566847 scopus 로고    scopus 로고
    • A sample approximation approach for optimization with probabilistic constraints
    • Luedtke, J., & Ahmed, S. (2008). A sample approximation approach for optimization with probabilistic constraints. SIAM Journal on Optimization, 19(2), 674–699.
    • (2008) SIAM Journal on Optimization , vol.19 , Issue.2 , pp. 674-699
    • Luedtke, J.1    Ahmed, S.2
  • 25
    • 11244335426 scopus 로고    scopus 로고
    • Component commonality: Models with product-specific service constraints
    • Mirchandani, P., & Mishra, A. (2002). Component commonality: Models with product-specific service constraints. Production and Operations Management, 11(2), 199–215.
    • (2002) Production and Operations Management , vol.11 , Issue.2 , pp. 199-215
    • Mirchandani, P.1    Mishra, A.2
  • 26
    • 20344396080 scopus 로고    scopus 로고
    • The impact of component commonality in an asseble-to-order environment under supply and demand uncertainty
    • Mohebbi, E., & Choobineh, F. (2005). The impact of component commonality in an asseble-to-order environment under supply and demand uncertainty. Omega, 33, 472–482.
    • (2005) Omega , vol.33 , pp. 472-482
    • Mohebbi, E.1    Choobineh, F.2
  • 27
    • 84939897898 scopus 로고    scopus 로고
    • Inventory control in an assemble-to-order production system with lost sales
    • Nadar, E., Akan, M., & Scheller-Wolf, A. (2014). Inventory control in an assemble-to-order production system with lost sales. Working paper (pp. 1–27).
    • (2014) Working paper , pp. 1-27
    • Nadar, E.1    Akan, M.2    Scheller-Wolf, A.3
  • 28
    • 0003312808 scopus 로고
    • Logarithmic concave measures and related topics
    • Dempster M, (ed), Academic Press, New York:
    • Prkopa, A. (1980). Logarithmic concave measures and related topics. In M. Dempster (Ed.), Stochastic programming (pp. 63–82). New York: Academic Press.
    • (1980) Stochastic programming , pp. 63-82
    • Prkopa, A.1
  • 30
    • 0002779268 scopus 로고    scopus 로고
    • Order-fullfillment performance measures in an assemble-to-order system with stochastic leadtimes
    • Song, J., Xu, S., & Liu, B. (1999). Order-fullfillment performance measures in an assemble-to-order system with stochastic leadtimes. Operations Research, 47(1), 131–149.
    • (1999) Operations Research , vol.47 , Issue.1 , pp. 131-149
    • Song, J.1    Xu, S.2    Liu, B.3
  • 31
    • 0036758161 scopus 로고    scopus 로고
    • Peformance analsyis and optimization of assemble-to-order systems with random lead times
    • Song, J., & Yao, D. (2002). Peformance analsyis and optimization of assemble-to-order systems with random lead times. Operations Research, 50(5), 889–903.
    • (2002) Operations Research , vol.50 , Issue.5 , pp. 889-903
    • Song, J.1    Yao, D.2
  • 32
    • 68349089214 scopus 로고    scopus 로고
    • The value of component commonality in a dynamic inventory system with lead times
    • Song, J., & Zhao, Y. (2009). The value of component commonality in a dynamic inventory system with lead times. Operations Research, 11(3), 493–508.
    • (2009) Operations Research , vol.11 , Issue.3 , pp. 493-508
    • Song, J.1    Zhao, Y.2
  • 34
    • 0032292446 scopus 로고    scopus 로고
    • Managing broader production lines through delayed differentiation using vallina boxes
    • Swaminathan, J., & Tayur, S. (1998). Managing broader production lines through delayed differentiation using vallina boxes. Management Science, 44(12), 161–172.
    • (1998) Management Science , vol.44 , Issue.12 , pp. 161-172
    • Swaminathan, J.1    Tayur, S.2
  • 37
    • 0000301836 scopus 로고    scopus 로고
    • Demand fulfillment rates in an assemble-to-order system with multiple products and dependent demands
    • Zhang, A. (1997). Demand fulfillment rates in an assemble-to-order system with multiple products and dependent demands. Production and Operations Management, 6(3), 309–324.
    • (1997) Production and Operations Management , vol.6 , Issue.3 , pp. 309-324
    • Zhang, A.1
  • 38
    • 33749502763 scopus 로고    scopus 로고
    • Peformance analsyis and evaluaation of assemble-to-order systems with stochastic sequential lead times
    • Zhao, Y., & Simchi-Levi, D. (2006). Peformance analsyis and evaluaation of assemble-to-order systems with stochastic sequential lead times. Operations Research, 54(4), 706–724.
    • (2006) Operations Research , vol.54 , Issue.4 , pp. 706-724
    • Zhao, Y.1    Simchi-Levi, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.