-
1
-
-
0035426460
-
Optimal material control in an assembly system with component commonality
-
Agrawal, N., & Cohen, M. (2001). Optimal material control in an assembly system with component commonality. Naval Research Logistics, 48, 409–429.
-
(2001)
Naval Research Logistics
, vol.48
, pp. 409-429
-
-
Agrawal, N.1
Cohen, M.2
-
3
-
-
17344394414
-
Joint inventory replenishment and component allocation optimization in an assemble-to-order system
-
Akcay, Y., & Xu, S. (2004). Joint inventory replenishment and component allocation optimization in an assemble-to-order system. Management Science, 50(1), 99–116.
-
(2004)
Management Science
, vol.50
, Issue.1
, pp. 99-116
-
-
Akcay, Y.1
Xu, S.2
-
5
-
-
84890245567
-
-
Wiley-Interscience, Hoboken, NJ:
-
Bazaraa, M., Sherali, H., & Shetty, C. (2006). Nonlinear programming: Theory and algorithms. Hoboken, NJ: Wiley-Interscience.
-
(2006)
Nonlinear programming: Theory and algorithms
-
-
Bazaraa, M.1
Sherali, H.2
Shetty, C.3
-
6
-
-
33845541662
-
Production and inventory control of a single product assemble-to-order system with multiple customer classes
-
Benjaafar, S., & ElHafsi, M. (2006). Production and inventory control of a single product assemble-to-order system with multiple customer classes. Manufacturing and Service Operations Management, 52(12), 1896–1912.
-
(2006)
Manufacturing and Service Operations Management
, vol.52
, Issue.12
, pp. 1896-1912
-
-
Benjaafar, S.1
ElHafsi, M.2
-
7
-
-
0036520077
-
Inventory-service optimizaiton in configure-to-order systems
-
Cheng, F., Ettl, M., Lin, G., & Yao, D. (2002). Inventory-service optimizaiton in configure-to-order systems. Manufacturing and Service Operations Management, 4(2), 114–132.
-
(2002)
Manufacturing and Service Operations Management
, vol.4
, Issue.2
, pp. 114-132
-
-
Cheng, F.1
Ettl, M.2
Lin, G.3
Yao, D.4
-
8
-
-
0037769039
-
A threshold inventory rationing policy for service-differentiated demand classes
-
Deshpande, V., Cohen, M., & Donohue, K. (2003). A threshold inventory rationing policy for service-differentiated demand classes. Management Science, 49(6), 683–703.
-
(2003)
Management Science
, vol.49
, Issue.6
, pp. 683-703
-
-
Deshpande, V.1
Cohen, M.2
Donohue, K.3
-
9
-
-
77953560961
-
A stochastic programming based inventory policy for assemble-to-order systems with application to the w model
-
Dogru, M., Reiman, M., & Wang, Q. (2010). A stochastic programming based inventory policy for assemble-to-order systems with application to the w model. Operations Research, 58(4), 849–864.
-
(2010)
Operations Research
, vol.58
, Issue.4
, pp. 849-864
-
-
Dogru, M.1
Reiman, M.2
Wang, Q.3
-
10
-
-
54049092532
-
Optimal integrated production and inventory control of an assemble-to-order system with multiple non-unitary demand classes
-
ElHafsi, M. (2009). Optimal integrated production and inventory control of an assemble-to-order system with multiple non-unitary demand classes. European Journal of Operational Research, 194(1), 127–142.
-
(2009)
European Journal of Operational Research
, vol.194
, Issue.1
, pp. 127-142
-
-
ElHafsi, M.1
-
11
-
-
33847070855
-
Inventory and production decisions for an assemble-to-order system with uncertain demand and limited assembly capacity
-
Fu, K., Hsu, V., & Lee, C. (2006). Inventory and production decisions for an assemble-to-order system with uncertain demand and limited assembly capacity. Operations Research, 54(6), 1137–1150.
-
(2006)
Operations Research
, vol.54
, Issue.6
, pp. 1137-1150
-
-
Fu, K.1
Hsu, V.2
Lee, C.3
-
12
-
-
0032169180
-
Order response time reliablity in a multi-item inventory system
-
Hausman, W., Lee, H., & Zhang, A. (1998). Order response time reliablity in a multi-item inventory system. European Journal of Operational Research, 109, 646–659.
-
(1998)
European Journal of Operational Research
, vol.109
, pp. 646-659
-
-
Hausman, W.1
Lee, H.2
Zhang, A.3
-
13
-
-
33644931174
-
Optimal component stocking policy for assemble-to-order systems with lead-time-dependent component and product pricing
-
Hsu, V., Lee, C., & So, K. (2006). Optimal component stocking policy for assemble-to-order systems with lead-time-dependent component and product pricing. Management Science, 52(3), 337–351.
-
(2006)
Management Science
, vol.52
, Issue.3
, pp. 337-351
-
-
Hsu, V.1
Lee, C.2
So, K.3
-
14
-
-
84939879281
-
Cost minimization in a periodic review assemble-to-order system
-
Huang, K., & de Kok, T. (2014). Cost minimization in a periodic review assemble-to-order system. Working paper (pp. 1–22).
-
(2014)
Working paper
, pp. 1-22
-
-
Huang, K.1
de Kok, T.2
-
15
-
-
3042853813
-
Inventory decisions in dells supply chain
-
Kapuscinski, R., Zhang, R., Carbonneau, P., Moore, R., & Reeves, B. (2004). Inventory decisions in dells supply chain. Interfaces, 34(3), 191–205.
-
(2004)
Interfaces
, vol.34
, Issue.3
, pp. 191-205
-
-
Kapuscinski, R.1
Zhang, R.2
Carbonneau, P.3
Moore, R.4
Reeves, B.5
-
17
-
-
0031996860
-
Variability reduction through operations reversal
-
Lee, H., & Tang, C. (1998). Variability reduction through operations reversal. Management Science, 44(2), 162–172.
-
(1998)
Management Science
, vol.44
, Issue.2
, pp. 162-172
-
-
Lee, H.1
Tang, C.2
-
18
-
-
0032204975
-
A bibliographical survey on some well-known non-standard knapsack problems
-
Lin, E. H. (1998). A bibliographical survey on some well-known non-standard knapsack problems. Information Systems and Operational Research, 36(4), 274–317.
-
(1998)
Information Systems and Operational Research
, vol.36
, Issue.4
, pp. 274-317
-
-
Lin, E.H.1
-
19
-
-
33846699374
-
Estimation of average backordres for an assemble-to-order sytem with random batch demands through extreme statistics
-
Lu, Y. (2006). Estimation of average backordres for an assemble-to-order sytem with random batch demands through extreme statistics. Naval Reserach Logistics, 54(1), 33–45.
-
(2006)
Naval Reserach Logistics
, vol.54
, Issue.1
, pp. 33-45
-
-
Lu, Y.1
-
20
-
-
14644436351
-
Order-based cost minimization in assemble-to-order systems
-
Lu, Y., & Song, J. (2005). Order-based cost minimization in assemble-to-order systems. Operations Research, 53(1), 151–169.
-
(2005)
Operations Research
, vol.53
, Issue.1
, pp. 151-169
-
-
Lu, Y.1
Song, J.2
-
21
-
-
4344612887
-
Order fill rate, lead time variability, and advance demand information in an assemble-to-order system
-
Lu, Y., Song, J., & Yao, D. (2003). Order fill rate, lead time variability, and advance demand information in an assemble-to-order system. Operations Research, 51(2), 292–308.
-
(2003)
Operations Research
, vol.51
, Issue.2
, pp. 292-308
-
-
Lu, Y.1
Song, J.2
Yao, D.3
-
22
-
-
77953575916
-
No-holdback allocation rules for continuous-time assemble-to-order systems
-
Lu, Y., Song, J., & Zhao, Y. (2010). No-holdback allocation rules for continuous-time assemble-to-order systems. Operations Research, 58(3), 691–705.
-
(2010)
Operations Research
, vol.58
, Issue.3
, pp. 691-705
-
-
Lu, Y.1
Song, J.2
Zhao, Y.3
-
23
-
-
84939893894
-
Integer programming approaches to two nonconvex optimization problems. Ph.D
-
Luedtke, J. (2007). Integer programming approaches to two nonconvex optimization problems. Ph.D., Georgia Institute of Technology.
-
(2007)
Georgia Institute of Technology
-
-
Luedtke, J.1
-
24
-
-
67649566847
-
A sample approximation approach for optimization with probabilistic constraints
-
Luedtke, J., & Ahmed, S. (2008). A sample approximation approach for optimization with probabilistic constraints. SIAM Journal on Optimization, 19(2), 674–699.
-
(2008)
SIAM Journal on Optimization
, vol.19
, Issue.2
, pp. 674-699
-
-
Luedtke, J.1
Ahmed, S.2
-
25
-
-
11244335426
-
Component commonality: Models with product-specific service constraints
-
Mirchandani, P., & Mishra, A. (2002). Component commonality: Models with product-specific service constraints. Production and Operations Management, 11(2), 199–215.
-
(2002)
Production and Operations Management
, vol.11
, Issue.2
, pp. 199-215
-
-
Mirchandani, P.1
Mishra, A.2
-
26
-
-
20344396080
-
The impact of component commonality in an asseble-to-order environment under supply and demand uncertainty
-
Mohebbi, E., & Choobineh, F. (2005). The impact of component commonality in an asseble-to-order environment under supply and demand uncertainty. Omega, 33, 472–482.
-
(2005)
Omega
, vol.33
, pp. 472-482
-
-
Mohebbi, E.1
Choobineh, F.2
-
27
-
-
84939897898
-
Inventory control in an assemble-to-order production system with lost sales
-
Nadar, E., Akan, M., & Scheller-Wolf, A. (2014). Inventory control in an assemble-to-order production system with lost sales. Working paper (pp. 1–27).
-
(2014)
Working paper
, pp. 1-27
-
-
Nadar, E.1
Akan, M.2
Scheller-Wolf, A.3
-
28
-
-
0003312808
-
Logarithmic concave measures and related topics
-
Dempster M, (ed), Academic Press, New York:
-
Prkopa, A. (1980). Logarithmic concave measures and related topics. In M. Dempster (Ed.), Stochastic programming (pp. 63–82). New York: Academic Press.
-
(1980)
Stochastic programming
, pp. 63-82
-
-
Prkopa, A.1
-
30
-
-
0002779268
-
Order-fullfillment performance measures in an assemble-to-order system with stochastic leadtimes
-
Song, J., Xu, S., & Liu, B. (1999). Order-fullfillment performance measures in an assemble-to-order system with stochastic leadtimes. Operations Research, 47(1), 131–149.
-
(1999)
Operations Research
, vol.47
, Issue.1
, pp. 131-149
-
-
Song, J.1
Xu, S.2
Liu, B.3
-
31
-
-
0036758161
-
Peformance analsyis and optimization of assemble-to-order systems with random lead times
-
Song, J., & Yao, D. (2002). Peformance analsyis and optimization of assemble-to-order systems with random lead times. Operations Research, 50(5), 889–903.
-
(2002)
Operations Research
, vol.50
, Issue.5
, pp. 889-903
-
-
Song, J.1
Yao, D.2
-
32
-
-
68349089214
-
The value of component commonality in a dynamic inventory system with lead times
-
Song, J., & Zhao, Y. (2009). The value of component commonality in a dynamic inventory system with lead times. Operations Research, 11(3), 493–508.
-
(2009)
Operations Research
, vol.11
, Issue.3
, pp. 493-508
-
-
Song, J.1
Zhao, Y.2
-
33
-
-
77950476024
-
Supply chain operations: Assemble-to-order systems
-
Amsterdam: North-Holland
-
Song, J., & Zipkin, P. (2003). Supply chain operations: Assemble-to-order systems. In: S. Graves, A. de Kok (eds.) Supply Chain Management. Handbooks in Operations Research and Management Science (vol. 30, chap. 11). Amsterdam: North-Holland.
-
(2003)
Supply Chain Management. Handbooks in Operations Research and Management Science (vol. 30, chap
, pp. 11
-
-
Song, J.1
Zipkin, P.2
Graves, S.3
de Kok, A.4
-
34
-
-
0032292446
-
Managing broader production lines through delayed differentiation using vallina boxes
-
Swaminathan, J., & Tayur, S. (1998). Managing broader production lines through delayed differentiation using vallina boxes. Management Science, 44(12), 161–172.
-
(1998)
Management Science
, vol.44
, Issue.12
, pp. 161-172
-
-
Swaminathan, J.1
Tayur, S.2
-
36
-
-
67649995252
-
Benefits of reevaluating real-time order fulfillment decisions
-
Xu, P., Allgor, R., & Graves, S. (2009). Benefits of reevaluating real-time order fulfillment decisions. Manufacturing and Service Operations Management, 11(2), 340–355.
-
(2009)
Manufacturing and Service Operations Management
, vol.11
, Issue.2
, pp. 340-355
-
-
Xu, P.1
Allgor, R.2
Graves, S.3
-
37
-
-
0000301836
-
Demand fulfillment rates in an assemble-to-order system with multiple products and dependent demands
-
Zhang, A. (1997). Demand fulfillment rates in an assemble-to-order system with multiple products and dependent demands. Production and Operations Management, 6(3), 309–324.
-
(1997)
Production and Operations Management
, vol.6
, Issue.3
, pp. 309-324
-
-
Zhang, A.1
-
38
-
-
33749502763
-
Peformance analsyis and evaluaation of assemble-to-order systems with stochastic sequential lead times
-
Zhao, Y., & Simchi-Levi, D. (2006). Peformance analsyis and evaluaation of assemble-to-order systems with stochastic sequential lead times. Operations Research, 54(4), 706–724.
-
(2006)
Operations Research
, vol.54
, Issue.4
, pp. 706-724
-
-
Zhao, Y.1
Simchi-Levi, D.2
|