메뉴 건너뛰기




Volumn 40, Issue 4, 2015, Pages 1239-1253

Development of an agent-based collaborative production system based on real-time order-driven approach

Author keywords

Multi agent system; Production planning; Real time order; Scheduling; Semiconductor manufacturing

Indexed keywords


EID: 84938077484     PISSN: 2193567X     EISSN: 21914281     Source Type: Journal    
DOI: 10.1007/s13369-015-1572-6     Document Type: Article
Times cited : (4)

References (20)
  • 1
    • 21144477219 scopus 로고
    • Re-entrant lines
    • Kumar P.R.: Re-entrant lines. Queueing Syst. 13(2), 87–110 (1993)
    • (1993) Queueing Syst , vol.13 , Issue.2 , pp. 87-110
    • Kumar, P.R.1
  • 2
    • 53949094990 scopus 로고    scopus 로고
    • Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system
    • Lee Y.F.; Jiang Z.B.; Liu H.R.: Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system. Comput. Oper. Res. 26(6), 866–884 (2009)
    • (2009) Comput. Oper. Res , vol.26 , Issue.6 , pp. 866-884
    • Lee, Y.F.1    Jiang, Z.B.2    Liu, H.R.3
  • 3
    • 79957495235 scopus 로고    scopus 로고
    • Integration of process planning and scheduling: a state-of-the-art review
    • Phanden R.K.; Jain A.; Verma R.: Integration of process planning and scheduling: a state-of-the-art review. Integr. J. Comput. Integr. Manuf. 24(6), 517–534 (2011)
    • (2011) Integr. J. Comput. Integr. Manuf , vol.24 , Issue.6 , pp. 517-534
    • Phanden, R.K.1    Jain, A.2    Verma, R.3
  • 4
    • 78650628488 scopus 로고    scopus 로고
    • Policies for allocating product lots to customer orders in semiconductor manufacturing supply chains
    • Sun Y.; Fowler J.W.; Shunk D.L.: Policies for allocating product lots to customer orders in semiconductor manufacturing supply chains. Prod. Plan. Control 22(1), 69–80 (2011)
    • (2011) Prod. Plan. Control , vol.22 , Issue.1 , pp. 69-80
    • Sun, Y.1    Fowler, J.W.2    Shunk, D.L.3
  • 5
    • 84874655634 scopus 로고    scopus 로고
    • The solution algorithms for the multiprocessor scheduling with work span criterion
    • Rudek R.; Rudek A.; Kozik A.: The solution algorithms for the multiprocessor scheduling with work span criterion. Expert Syst. Appl. 40, 2799–2806 (2013)
    • (2013) Expert Syst. Appl , vol.40 , pp. 2799-2806
    • Rudek, R.1    Rudek, A.2    Kozik, A.3
  • 6
    • 84871280484 scopus 로고    scopus 로고
    • Production planning of mixed-model assembly lines: a heuristic mixed integer programming based approach
    • Tonellia F.; Paoluccib M.; Anghinolfi D.; Taticchic P.: Production planning of mixed-model assembly lines: a heuristic mixed integer programming based approach. Prod. Plan. Control 24(1), 110–127 (2013)
    • (2013) Prod. Plan. Control , vol.24 , Issue.1 , pp. 110-127
    • Tonellia, F.1    Paoluccib, M.2    Anghinolfi, D.3    Taticchic, P.4
  • 7
    • 78650612970 scopus 로고    scopus 로고
    • Agent-based dynamic integrated process planning and scheduling in flexible manufacturing systems
    • Nejad H.T.N.; Nobuhiro S.; Koji I.: Agent-based dynamic integrated process planning and scheduling in flexible manufacturing systems. Int. J. Prod. Res. 49(5), 1373–1389 (2011)
    • (2011) Int. J. Prod. Res , vol.49 , Issue.5 , pp. 1373-1389
    • Nejad, H.T.N.1    Nobuhiro, S.2    Koji, I.3
  • 8
    • 84876531277 scopus 로고    scopus 로고
    • An approach for integration of process planning and scheduling
    • Phanden R.K.; Jain A.; Verma R.: An approach for integration of process planning and scheduling. Integr. J. Comput. Integr. Manuf. 26(4), 284–302 (2013)
    • (2013) Integr. J. Comput. Integr. Manuf , vol.26 , Issue.4 , pp. 284-302
    • Phanden, R.K.1    Jain, A.2    Verma, R.3
  • 9
    • 84876444672 scopus 로고    scopus 로고
    • Multiperiodicity and attractivity analysis for discrete-time second order delayed recurrent neural networks
    • Qiu F.: Multiperiodicity and attractivity analysis for discrete-time second order delayed recurrent neural networks. Arab. J. Sci. Eng. 38, 1269–1280 (2013)
    • (2013) Arab. J. Sci. Eng , vol.38 , pp. 1269-1280
    • Qiu, F.1
  • 10
    • 27944490887 scopus 로고    scopus 로고
    • Agent-based collaborative product design engineering: an industrial case study
    • Hao Q.; et al.: Agent-based collaborative product design engineering: an industrial case study. Comput. Ind. 57(1), 26–38 (2006)
    • (2006) Comput. Ind , vol.57 , Issue.1 , pp. 26-38
    • Hao, Q.1
  • 11
    • 78650601922 scopus 로고    scopus 로고
    • Agent-based simulation environment for intelligent manufacturing and warehouse management systems
    • Ruiz N.; et al.: Agent-based simulation environment for intelligent manufacturing and warehouse management systems. Int. J. Prod. Res. 49(5), 1469–1482 (2011)
    • (2011) Int. J. Prod. Res , vol.49 , Issue.5 , pp. 1469-1482
    • Ruiz, N.1
  • 12
    • 85133749042 scopus 로고    scopus 로고
    • Agent-based systems for intelligent manufacturing: a state of the art survey
    • Shen W.; Norrie D.H.: Agent-based systems for intelligent manufacturing: a state of the art survey. Knowl. Inf. Syst. 1, 129–156 (1999)
    • (1999) Knowl. Inf. Syst , vol.1 , pp. 129-156
    • Shen, W.1    Norrie, D.H.2
  • 13
    • 1642602945 scopus 로고    scopus 로고
    • Multi-agent systems in construction-state of the art and prospects
    • Ren Z.; Anumba C.J.: Multi-agent systems in construction-state of the art and prospects. Autom. Constr. 13, 421–434 (2004)
    • (2004) Autom. Constr , vol.13 , pp. 421-434
    • Ren, Z.1    Anumba, C.J.2
  • 14
    • 84867015880 scopus 로고    scopus 로고
    • An agent-based collaborative design framework for feature-based design of aircraft structural parts
    • Wang W.; Li Y.; Li H.; Liu C.: An agent-based collaborative design framework for feature-based design of aircraft structural parts. Int. J. Comput. Integr. Manuf. 25(10), 888–900 (2012)
    • (2012) Int. J. Comput. Integr. Manuf , vol.25 , Issue.10 , pp. 888-900
    • Wang, W.1    Li, Y.2    Li, H.3    Liu, C.4
  • 15
    • 84859976532 scopus 로고    scopus 로고
    • Multi-agent job shop scheduling system based on co-operative approach of idle time minimization
    • Kouider A.; Bouzouia B.: Multi-agent job shop scheduling system based on co-operative approach of idle time minimization. Int. J. Prod. Res. 50(2), 409–424 (2012)
    • (2012) Int. J. Prod. Res , vol.50 , Issue.2 , pp. 409-424
    • Kouider, A.1    Bouzouia, B.2
  • 16
    • 78650600811 scopus 로고    scopus 로고
    • Multi-agent based scheduling in manufacturing cells in a dynamic environment
    • Renna P.: Multi-agent based scheduling in manufacturing cells in a dynamic environment. Int. J. Prod. Res. 49(5), 1285–1301 (2011)
    • (2011) Int. J. Prod. Res , vol.49 , Issue.5 , pp. 1285-1301
    • Renna, P.1
  • 17
    • 77951108931 scopus 로고    scopus 로고
    • Agent-based knowledge management system with APQP: implementation of semiconductor manufacturing services industry
    • Wang K.J.; et al.: Agent-based knowledge management system with APQP: implementation of semiconductor manufacturing services industry. Int. J. Prod. Res. 48(10), 2913–2936 (2010)
    • (2010) Int. J. Prod. Res , vol.48 , Issue.10 , pp. 2913-2936
    • Wang, K.J.1
  • 18
    • 0031621768 scopus 로고    scopus 로고
    • A survey of factory control algorithms which can be implemented in a multi-agent hierarchy: dispatching, scheduling, and Pull
    • Baker A.D.: A survey of factory control algorithms which can be implemented in a multi-agent hierarchy: dispatching, scheduling, and Pull. J. Manuf. Syst. 17(4), 297–320 (1998)
    • (1998) J. Manuf. Syst , vol.17 , Issue.4 , pp. 297-320
    • Baker, A.D.1
  • 19
    • 36248975240 scopus 로고    scopus 로고
    • Multi-agent systems applications in manufacturing systems and supply chain management: a review paper
    • Lee J.H.; Kim C.O.: Multi-agent systems applications in manufacturing systems and supply chain management: a review paper. Int. J. Prod. Res. 46(1), 233–265 (2008)
    • (2008) Int. J. Prod. Res , vol.46 , Issue.1 , pp. 233-265
    • Lee, J.H.1    Kim, C.O.2
  • 20
    • 79151471513 scopus 로고    scopus 로고
    • Development of a multi-agent-based distributed simulation platform for semiconductor manufacturing
    • Lin J.; Long Q.Q.: Development of a multi-agent-based distributed simulation platform for semiconductor manufacturing. Expert Syst. Appl. 38, 5231–5239 (2011)
    • (2011) Expert Syst. Appl , vol.38 , pp. 5231-5239
    • Lin, J.1    Long, Q.Q.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.