메뉴 건너뛰기




Volumn 40, Issue 8, 2013, Pages 2799-2806

The solution algorithms for the multiprocessor scheduling with workspan criterion

Author keywords

Deteriorating; Learning; Makespan; Multiprocessors; Scheduling; Workspan

Indexed keywords

DETERIORATING; LEARNING; MAKESPAN; MULTIPROCESSORS; WORKSPAN;

EID: 84874655634     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2012.11.005     Document Type: Article
Times cited : (9)

References (22)
  • 2
    • 72049123751 scopus 로고    scopus 로고
    • A fast metaheuristic for scheduling independent tasks with multiple modes
    • M. Caramia, and S. Giordani A fast metaheuristic for scheduling independent tasks with multiple modes Computers & Operations Research 58 2010 64 69
    • (2010) Computers & Operations Research , vol.58 , pp. 64-69
    • Caramia, M.1    Giordani, S.2
  • 7
    • 84862784973 scopus 로고    scopus 로고
    • An effective approximation algorithm for the malleable parallel task scheduling problem
    • L. Fan, F. Zhang, G. Wang, and Z. Liu An effective approximation algorithm for the malleable parallel task scheduling problem Journal of Parallel and Distributed Computing 72 2012 693 704
    • (2012) Journal of Parallel and Distributed Computing , vol.72 , pp. 693-704
    • Fan, L.1    Zhang, F.2    Wang, G.3    Liu, Z.4
  • 10
    • 0036794414 scopus 로고    scopus 로고
    • A multiprocessor task scheduling model for berth allocation: Heuristic and worst case analysis
    • Y. Guan, W.-Q. Xiao, R.-K. Cheung, and C.-L. Li A multiprocessor task scheduling model for berth allocation: Heuristic and worst case analysis Operations Research Letters 30 2002 343 350
    • (2002) Operations Research Letters , vol.30 , pp. 343-350
    • Guan, Y.1    Xiao, W.-Q.2    Cheung, R.-K.3    Li, C.-L.4
  • 11
    • 79151486009 scopus 로고    scopus 로고
    • A note on the learning effect in multi-agent optimization
    • A. Janiak, and R. Rudek A note on the learning effect in multi-agent optimization Expert Systems with Applications 38 2011 5974 5980
    • (2011) Expert Systems with Applications , vol.38 , pp. 5974-5980
    • Janiak, A.1    Rudek, R.2
  • 12
    • 34249306917 scopus 로고    scopus 로고
    • Single-machine scheduling problems with start-time dependent processing time
    • W.-H. Kuo, and D.-L. Yang Single-machine scheduling problems with start-time dependent processing time Computers and Mathematics with Applications 53 2007 1658 1664
    • (2007) Computers and Mathematics with Applications , vol.53 , pp. 1658-1664
    • Kuo, W.-H.1    Yang, D.-L.2
  • 13
    • 79955669952 scopus 로고    scopus 로고
    • Single-machine scheduling with a nonlinear deterioration function
    • P.-J. Lai, and W.-C. Lee Single-machine scheduling with a nonlinear deterioration function Information Processing Letters 110 2010 455 459
    • (2010) Information Processing Letters , vol.110 , pp. 455-459
    • Lai, P.-J.1    Lee, W.-C.2
  • 15
    • 0020699921 scopus 로고
    • A heuristic algorithm for m-machine, n-jobs Flow-shop sequencing problem
    • M. Nawaz Jr.; E.E. Enscore, and I.A. Ham A heuristic algorithm for m-machine, n-jobs Flow-shop sequencing problem Omega 11 1983 91 95
    • (1983) Omega , vol.11 , pp. 91-95
    • Nawaz, Jr.M.1    Enscore, E.E.2    Ham, I.A.3
  • 16
    • 70349470781 scopus 로고    scopus 로고
    • The common due-date early/tardy scheduling problem on a parallel machine under the effects of time-dependent learning and linear and nonlinear deterioration
    • M.D. Toksari, and E. Güner The common due-date early/tardy scheduling problem on a parallel machine under the effects of time-dependent learning and linear and nonlinear deterioration Expert Systems with Applications 37 2010 92 112
    • (2010) Expert Systems with Applications , vol.37 , pp. 92-112
    • Toksari, M.D.1    Güner, E.2
  • 18
    • 0041330400 scopus 로고
    • About schedules observing deadlines (in Russian)
    • V.G. Vizing About schedules observing deadlines (in Russian) Kibernetika 1 1981 128 135
    • (1981) Kibernetika , vol.1 , pp. 128-135
    • Vizing, V.G.1
  • 19
    • 65649091354 scopus 로고    scopus 로고
    • Single machine scheduling with decreasing linear deterioration under precedence constraints
    • J.-B. Wang Single machine scheduling with decreasing linear deterioration under precedence constraints Computers and Mathematics with Applications 58 2009 95 103
    • (2009) Computers and Mathematics with Applications , vol.58 , pp. 95-103
    • Wang, J.-B.1
  • 21
    • 35448998982 scopus 로고    scopus 로고
    • Single-machine scheduling with an actual time-dependent learning effect
    • D.-L. Yang, and W.-H. Kuo Single-machine scheduling with an actual time-dependent learning effect Journal of the Operational Research Society 58 2007 1348 1353
    • (2007) Journal of the Operational Research Society , vol.58 , pp. 1348-1353
    • Yang, D.-L.1    Kuo, W.-H.2
  • 22
    • 80052273366 scopus 로고    scopus 로고
    • Scheduling with deteriorating jobs and learning effects
    • D.-L. Yang, and W.-H. Kuo Scheduling with deteriorating jobs and learning effects Applied Mathematics and Computation 218 2011 2069 2073
    • (2011) Applied Mathematics and Computation , vol.218 , pp. 2069-2073
    • Yang, D.-L.1    Kuo, W.-H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.