메뉴 건너뛰기




Volumn 78, Issue 5-8, 2015, Pages 947-959

Optimal policies for integrated inventory system under fuzzy random framework

Author keywords

Fuzzy random demand; Lead time reduction; Service level; Vendor buyer inventory system

Indexed keywords

CHAINS; FUZZY SYSTEMS; INVENTORY CONTROL; SUPPLY CHAINS;

EID: 84934912313     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-014-6695-5     Document Type: Article
Times cited : (11)

References (39)
  • 1
    • 34248666540 scopus 로고
    • Fuzzy sets
    • Zadeh LA (1965) Fuzzy sets. Inf Control 8:338–353
    • (1965) Inf Control , vol.8 , pp. 338-353
    • Zadeh, L.A.1
  • 2
    • 0023594008 scopus 로고
    • Fuzzy-set theoretic interpretation of economic order quantity
    • Park K (1987) Fuzzy-set theoretic interpretation of economic order quantity. IEEE Trans Syst Man Cybern 17:1082–1084
    • (1987) IEEE Trans Syst Man Cybern , vol.17 , pp. 1082-1084
    • Park, K.1
  • 4
    • 0000342075 scopus 로고    scopus 로고
    • Economic reorder point for fuzzy backorder quantity
    • Chang SC, Yao JS (1998) Economic reorder point for fuzzy backorder quantity. Eur J Oper Res 109:183–202
    • (1998) Eur J Oper Res , vol.109 , pp. 183-202
    • Chang, S.C.1    Yao, J.S.2
  • 5
    • 0032595412 scopus 로고    scopus 로고
    • Economic order quantity in fuzzy sense for inventory without backorder model
    • Lee HM, Yao JS (1999) Economic order quantity in fuzzy sense for inventory without backorder model. Fuzzy Sets Syst 105:13–31
    • (1999) Fuzzy Sets Syst , vol.105 , pp. 13-31
    • Lee, H.M.1    Yao, J.S.2
  • 6
    • 0036567711 scopus 로고    scopus 로고
    • Lot size-reorder point inventory model with fuzzy demand
    • Kao C, Hsu WK (2002) Lot size-reorder point inventory model with fuzzy demand. Comput Math Appl 43:1291–1302
    • (2002) Comput Math Appl , vol.43 , pp. 1291-1302
    • Kao, C.1    Hsu, W.K.2
  • 7
    • 0037449245 scopus 로고    scopus 로고
    • Inventory without backorder with fuzzy total cost and fuzzy storing cost defuzzified by centroid and sign distance
    • Yao JS, Chiang J (2003) Inventory without backorder with fuzzy total cost and fuzzy storing cost defuzzified by centroid and sign distance. Eur J Oper Res 148:401–409
    • (2003) Eur J Oper Res , vol.148 , pp. 401-409
    • Yao, J.S.1    Chiang, J.2
  • 8
    • 60849122814 scopus 로고    scopus 로고
    • Fuzzy economic order time models with random demand
    • Vijayan T, Kumaran M (2009) Fuzzy economic order time models with random demand. Int J Approx Reason 50:529–540
    • (2009) Int J Approx Reason , vol.50 , pp. 529-540
    • Vijayan, T.1    Kumaran, M.2
  • 9
    • 60949090604 scopus 로고    scopus 로고
    • An analytical solution to a fuzzy economic order quantity problem
    • Björk KM (2009) An analytical solution to a fuzzy economic order quantity problem. Int J Approx Reason 50:485–493
    • (2009) Int J Approx Reason , vol.50 , pp. 485-493
    • Björk, K.M.1
  • 10
    • 84155169406 scopus 로고    scopus 로고
    • An inventory model with backorders with fuzzy parameters and decision variables
    • Kazemi N, Ehsani E, Jaber MY (2010) An inventory model with backorders with fuzzy parameters and decision variables. Int J Approx Reason 51:964–972
    • (2010) Int J Approx Reason , vol.51 , pp. 964-972
    • Kazemi, N.1    Ehsani, E.2    Jaber, M.Y.3
  • 11
    • 1342267163 scopus 로고    scopus 로고
    • Fuzzy mixture inventory model with variable lead-time based on probabilistic fuzzy set and triangular fuzzy number
    • Chang HC, Yao JS, Ouyang LY (2004) Fuzzy mixture inventory model with variable lead-time based on probabilistic fuzzy set and triangular fuzzy number. Comput Math Model 39:287–304
    • (2004) Comput Math Model , vol.39 , pp. 287-304
    • Chang, H.C.1    Yao, J.S.2    Ouyang, L.Y.3
  • 12
    • 25144435119 scopus 로고    scopus 로고
    • Fuzzy mixture inventory model involving fuzzy random variable lead time demand and fuzzy total demand
    • Chang HC, Yao JS, Ouyang LY (2006) Fuzzy mixture inventory model involving fuzzy random variable lead time demand and fuzzy total demand. Eur J Oper Res 169:65–80
    • (2006) Eur J Oper Res , vol.169 , pp. 65-80
    • Chang, H.C.1    Yao, J.S.2    Ouyang, L.Y.3
  • 13
    • 34247604003 scopus 로고    scopus 로고
    • Continuous review inventory model in mixed fuzzy and stochastic environment
    • Dutta P, Chakraborty D, Roy AR (2007) Continuous review inventory model in mixed fuzzy and stochastic environment. Appl Math Comput 188:970–980
    • (2007) Appl Math Comput , vol.188 , pp. 970-980
    • Dutta, P.1    Chakraborty, D.2    Roy, A.R.3
  • 14
    • 84871321054 scopus 로고    scopus 로고
    • (Q, R) inventory model with service level constraint and variable lead time in fuzzy-stochastic environment
    • Joshi M, Soni H (2011) (Q, R) inventory model with service level constraint and variable lead time in fuzzy-stochastic environment. Int J Ind Eng Comput 2:901–912
    • (2011) Int J Ind Eng Comput , vol.2 , pp. 901-912
    • Joshi, M.1    Soni, H.2
  • 15
    • 79955624729 scopus 로고    scopus 로고
    • Continuous review inventory model with variable lead time in a fuzzy random environment
    • Wang X (2011) Continuous review inventory model with variable lead time in a fuzzy random environment. Expert Syst Appl 38:11715–11721
    • (2011) Expert Syst Appl , vol.38 , pp. 11715-11721
    • Wang, X.1
  • 16
    • 85019290524 scopus 로고    scopus 로고
    • Fuzzy inventory models
    • Jaber MY, (ed), CRC Press, Boca Raton:
    • Guiffrida AL (2009) Fuzzy inventory models. In: Jaber MY (ed) Inventory management: non-classical views. CRC Press, Boca Raton, pp 173–190
    • (2009) Inventory management: non-classical views , pp. 173-190
    • Guiffrida, A.L.1
  • 17
    • 34249930610 scopus 로고    scopus 로고
    • An integrated vendor-buyer inventory model with quality improvement and lead time reduction
    • Ouyang LY, Wu KS, Ho CH (2007) An integrated vendor-buyer inventory model with quality improvement and lead time reduction. Int J Prod Econ 108:349–358
    • (2007) Int J Prod Econ , vol.108 , pp. 349-358
    • Ouyang, L.Y.1    Wu, K.S.2    Ho, C.H.3
  • 18
    • 67349172139 scopus 로고    scopus 로고
    • An integrated vendor-buyer inventory model with backorder price discount and effective investment to reduce ordering cost
    • Lin YJ (2009) An integrated vendor-buyer inventory model with backorder price discount and effective investment to reduce ordering cost. Comput Ind Eng 56:1597–1606
    • (2009) Comput Ind Eng , vol.56 , pp. 1597-1606
    • Lin, Y.J.1
  • 19
    • 69649098598 scopus 로고    scopus 로고
    • Two-echelon supply chain inventory model with controllable lead time and service level constraint
    • Jha JK, Shanker K (2009) Two-echelon supply chain inventory model with controllable lead time and service level constraint. Comput Ind Eng 57:1096–1104
    • (2009) Comput Ind Eng , vol.57 , pp. 1096-1104
    • Jha, J.K.1    Shanker, K.2
  • 20
    • 77955280730 scopus 로고    scopus 로고
    • Cost allocation model for optimizing supply chain inventory with controllable lead time
    • Ye F, Xu X (2010) Cost allocation model for optimizing supply chain inventory with controllable lead time. Comput Ind Eng 59:93–99
    • (2010) Comput Ind Eng , vol.59 , pp. 93-99
    • Ye, F.1    Xu, X.2
  • 21
    • 80053219023 scopus 로고    scopus 로고
    • Supply chain coordination model with controllable lead time and service level constraint
    • Li Y, Xu X, Ye F (2011) Supply chain coordination model with controllable lead time and service level constraint. Comput Ind Eng 61:858–864
    • (2011) Comput Ind Eng , vol.61 , pp. 858-864
    • Li, Y.1    Xu, X.2    Ye, F.3
  • 22
    • 84855986210 scopus 로고    scopus 로고
    • Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand
    • Glock CH (2012) Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand. Int J Prod Econ 136:37–44
    • (2012) Int J Prod Econ , vol.136 , pp. 37-44
    • Glock, C.H.1
  • 23
    • 82755189344 scopus 로고    scopus 로고
    • Coordinating orders in a two echelon supply chain with controllable lead time and ordering cost using the credit period
    • Arkan A, Hejazi SR (2012) Coordinating orders in a two echelon supply chain with controllable lead time and ordering cost using the credit period. Comput Ind Eng 62:56–69
    • (2012) Comput Ind Eng , vol.62 , pp. 56-69
    • Arkan, A.1    Hejazi, S.R.2
  • 24
    • 84860695967 scopus 로고    scopus 로고
    • Integrated vendor-buyer cooperative inventory model with controllable lead time, ordering cost reduction, and service level constraint
    • Shahpouri S, Fattahi P, Arkan A, Parsa K (2013) Integrated vendor-buyer cooperative inventory model with controllable lead time, ordering cost reduction, and service level constraint. Int J Adv Manuf Technol 65:657–666
    • (2013) Int J Adv Manuf Technol , vol.65 , pp. 657-666
    • Shahpouri, S.1    Fattahi, P.2    Arkan, A.3    Parsa, K.4
  • 25
    • 28844490094 scopus 로고    scopus 로고
    • A joint economic-lot-size model for purchaser and vendor in fuzzy sense
    • Mahata GC, Goswami A, Gupta DK (2005) A joint economic-lot-size model for purchaser and vendor in fuzzy sense. Comput Math Appl 50:1767–1790
    • (2005) Comput Math Appl , vol.50 , pp. 1767-1790
    • Mahata, G.C.1    Goswami, A.2    Gupta, D.K.3
  • 26
    • 33746238732 scopus 로고    scopus 로고
    • Analysis of optimal vendor-buyer integrated inventory policy involving defective items
    • Ouyang LY, Wu KS, Ho CH (2006) Analysis of optimal vendor-buyer integrated inventory policy involving defective items. Int J Adv Manuf Technol 29:1232–1245
    • (2006) Int J Adv Manuf Technol , vol.29 , pp. 1232-1245
    • Ouyang, L.Y.1    Wu, K.S.2    Ho, C.H.3
  • 27
    • 34250763072 scopus 로고    scopus 로고
    • A two-echelon inventory model with fuzzy annual demand in a supply chain
    • Yang MF (2006) A two-echelon inventory model with fuzzy annual demand in a supply chain. J Inf Optim Sci 27:537–550
    • (2006) J Inf Optim Sci , vol.27 , pp. 537-550
    • Yang, M.F.1
  • 28
    • 34250730796 scopus 로고    scopus 로고
    • Optimal strategy for the integrated vendor-buyer inventory model with fuzzy annual demand and fuzzy adjustable production rate
    • Yang MF (2007) Optimal strategy for the integrated vendor-buyer inventory model with fuzzy annual demand and fuzzy adjustable production rate. J Appl Sci 7:1025–1029
    • (2007) J Appl Sci , vol.7 , pp. 1025-1029
    • Yang, M.F.1
  • 29
    • 36248952068 scopus 로고    scopus 로고
    • Integrated inventory models with fuzzy annual demand and fuzzy production rate in a supply chain
    • Pan JC, Yang MF (2008) Integrated inventory models with fuzzy annual demand and fuzzy production rate in a supply chain. Int J Prod Res 46:753–770
    • (2008) Int J Prod Res , vol.46 , pp. 753-770
    • Pan, J.C.1    Yang, M.F.2
  • 30
    • 84977815394 scopus 로고    scopus 로고
    • An application of fuzzy set theory for supply chain coordination
    • Sinha S, Sarmah SP (2008) An application of fuzzy set theory for supply chain coordination. Int J Manag Sci Eng Manag 3:19–32
    • (2008) Int J Manag Sci Eng Manag , vol.3 , pp. 19-32
    • Sinha, S.1    Sarmah, S.P.2
  • 31
    • 84977800057 scopus 로고    scopus 로고
    • Optimization of fuzzy integrated vendor-buyer inventory models
    • Ritha W, Kalaiarasi R, Jun YB (2011) Optimization of fuzzy integrated vendor-buyer inventory models. Ann Fuzzy Math Inf 2:239–257
    • (2011) Ann Fuzzy Math Inf , vol.2 , pp. 239-257
    • Ritha, W.1    Kalaiarasi, R.2    Jun, Y.B.3
  • 32
    • 84863755836 scopus 로고    scopus 로고
    • A new method for solving two stage supply chain fuzzy inventory problem
    • Gani AN, Sabarinathan G (2012) A new method for solving two stage supply chain fuzzy inventory problem. Appl Math Sci 6:2963–2978
    • (2012) Appl Math Sci , vol.6 , pp. 2963-2978
    • Gani, A.N.1    Sabarinathan, G.2
  • 34
    • 0000903516 scopus 로고    scopus 로고
    • Ranking fuzzy numbers based on decomposition principle and signed distance
    • Yao JS, We K (2000) Ranking fuzzy numbers based on decomposition principle and signed distance. Fuzzy Sets Syst 116:275–288
    • (2000) Fuzzy Sets Syst , vol.116 , pp. 275-288
    • Yao, J.S.1    We, K.2
  • 35
    • 6344232554 scopus 로고
    • Fuzzy random variables: definition and theorems
    • Kwakernaak H (1978) Fuzzy random variables: definition and theorems. Inf Sci 15:1–29
    • (1978) Inf Sci , vol.15 , pp. 1-29
    • Kwakernaak, H.1
  • 36
    • 0033328713 scopus 로고    scopus 로고
    • The central limit theorems for fuzzy random variables
    • Wu HC (1999) The central limit theorems for fuzzy random variables. Inf Sci 120:239–256
    • (1999) Inf Sci , vol.120 , pp. 239-256
    • Wu, H.C.1
  • 37
    • 0035467476 scopus 로고    scopus 로고
    • A continuous review inventory model with ordering cost dependent on lead time
    • Chen CK, Chang HC, Ouyan LY (2001) A continuous review inventory model with ordering cost dependent on lead time. Int J Inf Manag Sci 12:1–13
    • (2001) Int J Inf Manag Sci , vol.12 , pp. 1-13
    • Chen, C.K.1    Chang, H.C.2    Ouyan, L.Y.3
  • 38
    • 26844537321 scopus 로고    scopus 로고
    • Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction
    • Chang HC, Ouyang LY, Wu KS, Ho CH (2006) Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction. Eur J Oper Res 170:481–495
    • (2006) Eur J Oper Res , vol.170 , pp. 481-495
    • Chang, H.C.1    Ouyang, L.Y.2    Wu, K.S.3    Ho, C.H.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.