-
1
-
-
0017416997
-
An integrated inventory model for a single supplier–single customer problem
-
Goyal SK (1976) An integrated inventory model for a single supplier–single customer problem. Int J Prod Res 15(1):107–111
-
(1976)
Int J Prod Res
, vol.15
, Issue.1
, pp. 107-111
-
-
Goyal, S.K.1
-
2
-
-
84985846646
-
A joint economic-lot-size model for purchaser and vendor
-
Banerjee A (1986) A joint economic-lot-size model for purchaser and vendor. Decis Sci 17(3):292–311
-
(1986)
Decis Sci
, vol.17
, Issue.3
, pp. 292-311
-
-
Banerjee, A.1
-
3
-
-
84985781712
-
A joint economic-lot-size model for purchaser and vendor: A comment
-
Goyal SK (1988) A joint economic-lot-size model for purchaser and vendor: a comment. Decis Sci 19(1):236–241
-
(1988)
Decis Sci
, vol.19
, Issue.1
, pp. 236-241
-
-
Goyal, S.K.1
-
4
-
-
0029632685
-
A one-vendor multi-buyer integrated inventory model
-
Lu L (1995) A one-vendor multi-buyer integrated inventory model. Eur J Oper Res 81:312–23
-
(1995)
Eur J Oper Res
, vol.81
, pp. 312-323
-
-
Lu, L.1
-
5
-
-
34248376605
-
Computational algorithmic procedure for optimal inventory policy involving ordering cost reduction and back-order discounts when lead time demand is controllable
-
Lee WC, Wu JW, Lei CL (2007) Computational algorithmic procedure for optimal inventory policy involving ordering cost reduction and back-order discounts when lead time demand is controllable. Appl Math Comput 189(1):186–200
-
(2007)
Appl Math Comput
, vol.189
, Issue.1
, pp. 186-200
-
-
Lee, W.C.1
Wu, J.W.2
Lei, C.L.3
-
6
-
-
0002505095
-
An analytical determination of lead time with normal demand
-
Liao CJ, Shyu CH (1991) An analytical determination of lead time with normal demand. Int J Oper Prod Manag 11(9):72–78
-
(1991)
Int J Oper Prod Manag
, vol.11
, Issue.9
, pp. 72-78
-
-
Liao, C.J.1
Shyu, C.H.2
-
7
-
-
0028439401
-
Inventory models involving lead time as a decision variable
-
Ben-Daya M, Raouf A (1994) Inventory models involving lead time as a decision variable. J Oper Res Soc 45(5):579–582
-
(1994)
J Oper Res Soc
, vol.45
, Issue.5
, pp. 579-582
-
-
Ben-Daya, M.1
Raouf, A.2
-
8
-
-
0030170083
-
Mixture inventory model with backorders and lost sales for variable lead time
-
Ouyang LY, Yeh NC, Wu KS (1996) Mixture inventory model with backorders and lost sales for variable lead time. J Oper Res Soc 47:829–832
-
(1996)
J Oper Res Soc
, vol.47
, pp. 829-832
-
-
Ouyang, L.Y.1
Yeh, N.C.2
Wu, K.S.3
-
9
-
-
0031232606
-
Mixture inventory model involving variable lead time with a service level constraint
-
Ouyang LY, Wu KS (1997) Mixture inventory model involving variable lead time with a service level constraint. Comput Oper Res 24(9):875–882
-
(1997)
Comput Oper Res
, vol.24
, Issue.9
, pp. 875-882
-
-
Ouyang, L.Y.1
Wu, K.S.2
-
10
-
-
0037139670
-
A study of an integrated inventory with controllable lead time
-
Pan JCH, Yang JS (2002) A study of an integrated inventory with controllable lead time. Int J Prod Res 40(5):1263–1273
-
(2002)
Int J Prod Res
, vol.40
, Issue.5
, pp. 1263-1273
-
-
Pan, J.1
Yang, J.S.2
-
11
-
-
0037142693
-
Lot size reorder point inventory model with controllable lead time and set-up cost
-
Ouyang LY, Chang HC (2002) Lot size reorder point inventory model with controllable lead time and set-up cost. Int J Syst Sci 33 (8):635–642
-
(2002)
Int J Syst Sci
, vol.33
, Issue.8
, pp. 635-642
-
-
Ouyang, L.Y.1
Chang, H.C.2
-
12
-
-
35348994976
-
Theory of exchange
-
Sharma S (2008) Theory of exchange. Eur J Oper Res 186:128–136
-
(2008)
Eur J Oper Res
, vol.186
, pp. 128-136
-
-
Sharma, S.1
-
13
-
-
64949110911
-
A composite model in the context of a production-inventory system
-
Sharma S (2009) A composite model in the context of a production-inventory system. Optim Lett 3(2):239–251
-
(2009)
Optim Lett
, vol.3
, Issue.2
, pp. 239-251
-
-
Sharma, S.1
-
14
-
-
59749099512
-
Single/multiple parameter swapping in the context of Sanjay Sharma's Theory of Exchange
-
Sharma S (2009) Single/multiple parameter swapping in the context of Sanjay Sharma's Theory of Exchange. Int J Adv Manuf Tech 40:629–635
-
(2009)
Int J Adv Manuf Tech
, vol.40
, pp. 629-635
-
-
Sharma, S.1
-
15
-
-
9544241347
-
Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time
-
Ouyang LY, Wu KS, Ho CH (2004) Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time. Int J Prod Econ 92(3):255–266
-
(2004)
Int J Prod Econ
, vol.92
, Issue.3
, pp. 255-266
-
-
Ouyang, L.Y.1
Wu, K.S.2
Ho, C.H.3
-
16
-
-
26844537321
-
Integrated vendor– buyer cooperative inventory models with controllable lead time and ordering cost reduction
-
Chang HC, Ouyang LY, Wu KS, Ho CH (2006) Integrated vendor– buyer cooperative inventory models with controllable lead time and ordering cost reduction. Eur J Oper Res 170(2):481–495
-
(2006)
Eur J Oper Res
, vol.170
, Issue.2
, pp. 481-495
-
-
Chang, H.C.1
Ouyang, L.Y.2
Wu, K.S.3
Ho, C.H.4
-
17
-
-
69649098598
-
Two-echelon supply chain inventory model with controllable lead time and service level constraint
-
Jha JK, Shanker K (2009) Two-echelon supply chain inventory model with controllable lead time and service level constraint. Comput Ind Eng 57:1096–1104
-
(2009)
Comput Ind Eng
, vol.57
, pp. 1096-1104
-
-
Jha, J.K.1
Shanker, K.2
-
18
-
-
84962496062
-
Ordering cost reduction in probabilistic inventory model with controllable lead time and a service level
-
Annadurai A, Uthayakumar R (2010) Ordering cost reduction in probabilistic inventory model with controllable lead time and a service level. Int J Manag Sci Eng Manag 5(6):403–410
-
(2010)
Int J Manag Sci Eng Manag
, vol.5
, Issue.6
, pp. 403-410
-
-
Annadurai, A.1
Uthayakumar, R.2
-
20
-
-
0000752798
-
Investing in reduced setups in the EOQ model
-
Porteus EL (1985) Investing in reduced setups in the EOQ model. Manag Sci 31:998–1010
-
(1985)
Manag Sci
, vol.31
, pp. 998-1010
-
-
Porteus, E.L.1
-
21
-
-
0025258126
-
Setup cost reduction in an inventory model with finite-range stochastic lead times
-
Nasri F, Affisco JF, Paknejad MJ (1990) Setup cost reduction in an inventory model with finite-range stochastic lead times. Int J Prod Res 28:199–212
-
(1990)
Int J Prod Res
, vol.28
, pp. 199-212
-
-
Nasri, F.1
Affisco, J.F.2
Paknejad, M.J.3
-
22
-
-
84985788519
-
Set-up reduction in economic production quantity model
-
Kim KL, Hayya JC, Hong JD (1992) Set-up reduction in economic production quantity model. Decis Sci 23:500–508
-
(1992)
Decis Sci
, vol.23
, pp. 500-508
-
-
Kim, K.L.1
Hayya, J.C.2
Hong, J.D.3
-
23
-
-
0000341101
-
Defective units in a continuous review (S, Q) system
-
Paknejad M.J., Nasri F., Affisco J.F. (1995) Defective units in a continuous review (s, Q) system. Int J Prod Res 33(10):2767– 2777
-
(1995)
Int J Prod Res
, vol.33
, Issue.10
-
-
Paknejad1
Nasri, M.J.F.2
Affisco, J.F.3
|