메뉴 건너뛰기




Volumn 170, Issue 2, 2006, Pages 481-495

Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction

Author keywords

Integrated model; Inventory; Lead time reduction; Ordering cost reduction

Indexed keywords

COST EFFECTIVENESS; COSTS; INDUSTRIAL MANAGEMENT; MATHEMATICAL MODELS; OPERATIONS RESEARCH;

EID: 26844537321     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2004.06.029     Document Type: Article
Times cited : (158)

References (26)
  • 1
    • 84985846646 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor
    • A. Banerjee A joint economic-lot-size model for purchaser and vendor Decision Sciences 17 1986 292 311
    • (1986) Decision Sciences , vol.17 , pp. 292-311
    • Banerjee, A.1
  • 2
  • 5
    • 0017416997 scopus 로고
    • An integrated inventory model for a single supplier-single customer problem
    • S.K. Goyal An integrated inventory model for a single supplier-single customer problem International Journal of Production Research 15 1 1976 107 111
    • (1976) International Journal of Production Research , vol.15 , Issue.1 , pp. 107-111
    • Goyal, S.K.1
  • 6
    • 84985781712 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor: A comment
    • S.K. Goyal A joint economic-lot-size model for purchaser and vendor: A comment Decision Sciences 19 1988 236 241
    • (1988) Decision Sciences , vol.19 , pp. 236-241
    • Goyal, S.K.1
  • 7
    • 0001539415 scopus 로고
    • A one-vendor multi-buyer integrated inventory model: A comment
    • S.K. Goyal A one-vendor multi-buyer integrated inventory model: A comment European Journal of Operational Research 82 1995 209 210
    • (1995) European Journal of Operational Research , vol.82 , pp. 209-210
    • Goyal, S.K.1
  • 8
    • 0031103642 scopus 로고    scopus 로고
    • Implementation of JIT purchasing: An integrated approach
    • D. Ha, and S.L. Kim Implementation of JIT purchasing: An integrated approach Production Planning and Control 8 2 1997 152 157
    • (1997) Production Planning and Control , vol.8 , Issue.2 , pp. 152-157
    • Ha, D.1    Kim, S.L.2
  • 10
    • 0004102424 scopus 로고
    • Dow Jones-Irwin Homewood, Illinois
    • R.W. Hall Zero Inventories 1983 Dow Jones-Irwin Homewood, Illinois
    • (1983) Zero Inventories
    • Hall, R.W.1
  • 11
    • 0033079082 scopus 로고    scopus 로고
    • Some stochastic inventory models with deterministic variable lead time
    • M. Hariga, and M. Ben-Daya Some stochastic inventory models with deterministic variable lead time European Journal of Operational Research 113 1999 42 51
    • (1999) European Journal of Operational Research , vol.113 , pp. 42-51
    • Hariga, M.1    Ben-Daya, M.2
  • 12
    • 0031101243 scopus 로고    scopus 로고
    • The single-vendor single-buyer integrated production-inventory model with a generalized policy
    • R.M. Hill The single-vendor single-buyer integrated production-inventory model with a generalized policy European Journal of Operational Research 97 1997 493 499
    • (1997) European Journal of Operational Research , vol.97 , pp. 493-499
    • Hill, R.M.1
  • 13
    • 0032632360 scopus 로고    scopus 로고
    • The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem
    • R.M. Hill The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem International Journal of Production Research 37 11 1999 2463 2475
    • (1999) International Journal of Production Research , vol.37 , Issue.11 , pp. 2463-2475
    • Hill, R.M.1
  • 14
    • 0024069692 scopus 로고
    • Justifying new technology acquisition through its impact on the cost of running an inventory policy
    • G. Keller, and H. Noori Justifying new technology acquisition through its impact on the cost of running an inventory policy IIE Transitions 20 1988 284 291
    • (1988) IIE Transitions , vol.20 , pp. 284-291
    • Keller, G.1    Noori, H.2
  • 15
    • 84985788519 scopus 로고
    • Setup reduction in economic production quantity model
    • K.L. Kim, J.C. Hayya, and J.D. Hong Setup reduction in economic production quantity model Decision Sciences 23 1992 500 508
    • (1992) Decision Sciences , vol.23 , pp. 500-508
    • Kim, K.L.1    Hayya, J.C.2    Hong, J.D.3
  • 17
    • 0032210280 scopus 로고    scopus 로고
    • A note on lead time and distributional assumptions in continuous review inventory models
    • I. Moon, and S. Choi A note on lead time and distributional assumptions in continuous review inventory models Computers and Operations Research 25 1998 1007 1012
    • (1998) Computers and Operations Research , vol.25 , pp. 1007-1012
    • Moon, I.1    Choi, S.2
  • 19
    • 0037142693 scopus 로고    scopus 로고
    • Lot size reorder point inventory model with controllable lead time and set-up cost
    • L.Y. Ouyang, and H.C. Chang Lot size reorder point inventory model with controllable lead time and set-up cost International Journal of Systems Science 33 8 2002 635 642
    • (2002) International Journal of Systems Science , vol.33 , Issue.8 , pp. 635-642
    • Ouyang, L.Y.1    Chang, H.C.2
  • 20
    • 0033285739 scopus 로고    scopus 로고
    • Lead time and ordering cost reductions in continuous review inventory systems with partial backorders
    • L.Y. Ouyang, C.K. Chen, and H.C. Chang Lead time and ordering cost reductions in continuous review inventory systems with partial backorders Journal of the Operational Research Society 50 1999 1272 1279
    • (1999) Journal of the Operational Research Society , vol.50 , pp. 1272-1279
    • Ouyang, L.Y.1    Chen, C.K.2    Chang, H.C.3
  • 21
    • 0030170083 scopus 로고    scopus 로고
    • Mixture inventory model with backorders and lost sales for variable lead time
    • L.Y. Ouyang, N.C. Yeh, and K.S. Wu Mixture inventory model with backorders and lost sales for variable lead time Journal of the Operational Research Society 47 1996 829 832
    • (1996) Journal of the Operational Research Society , vol.47 , pp. 829-832
    • Ouyang, L.Y.1    Yeh, N.C.2    Wu, K.S.3
  • 23
    • 0036724782 scopus 로고    scopus 로고
    • Inventory models with fixed and variable lead time crash costs considerations
    • J.C. Pan, Y.C. Hsiao, and C.J. Lee Inventory models with fixed and variable lead time crash costs considerations Journal of the Operational Research Society 53 9 2002 1048 1053
    • (2002) Journal of the Operational Research Society , vol.53 , Issue.9 , pp. 1048-1053
    • Pan, J.C.1    Hsiao, Y.C.2    Lee, C.J.3
  • 24
    • 0037139670 scopus 로고    scopus 로고
    • A study of an integrated inventory with controllable lead time
    • J.C. Pan, and J.S. Yang A study of an integrated inventory with controllable lead time International Journal of Production Research 40 5 2002 1263 1273
    • (2002) International Journal of Production Research , vol.40 , Issue.5 , pp. 1263-1273
    • Pan, J.C.1    Yang, J.S.2
  • 25
    • 0000752798 scopus 로고
    • Investing in reduced setups in the EOQ model
    • E.L. Porteus Investing in reduced setups in the EOQ model Management Science 31 1985 998 1010
    • (1985) Management Science , vol.31 , pp. 998-1010
    • Porteus, E.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.