-
1
-
-
0242301536
-
Lead-time reduction in a stochastic inventory system with learning consideration
-
M. Ben-Daya, and M. Hariga Lead-time reduction in a stochastic inventory system with learning consideration International Journal of Production Research 41 2003 571 579
-
(2003)
International Journal of Production Research
, vol.41
, pp. 571-579
-
-
Ben-Daya, M.1
Hariga, M.2
-
2
-
-
4644312239
-
Integrated single vendor single buyer model with stochastic demand and variable lead time
-
M. Ben-Daya, and M. Hariga Integrated single vendor single buyer model with stochastic demand and variable lead time International Journal of Production Economics 92 2004 75 80
-
(2004)
International Journal of Production Economics
, vol.92
, pp. 75-80
-
-
Ben-Daya, M.1
Hariga, M.2
-
4
-
-
38649130709
-
Inventory management with variable lead-time dependent procurement cost
-
C. Chandra, and J. Grabis Inventory management with variable lead-time dependent procurement cost Omega 36 2008 877 887
-
(2008)
Omega
, vol.36
, pp. 877-887
-
-
Chandra, C.1
Grabis, J.2
-
5
-
-
26844537321
-
Integrated vendorbuyer cooperative inventory models with controllable lead time and ordering cost reduction
-
H.C. Chang, L.Y. Ouyang, K.S. Wu, and C.H. Ho Integrated vendorbuyer cooperative inventory models with controllable lead time and ordering cost reduction European Journal of Operational Research 170 2006 481 495
-
(2006)
European Journal of Operational Research
, vol.170
, pp. 481-495
-
-
Chang, H.C.1
Ouyang, L.Y.2
Wu, K.S.3
Ho, C.H.4
-
6
-
-
34548412254
-
Variance vs average: Supply chain lead-time as a predictor of financial performance
-
W.J. Christensen, R.N. Germain, and L. Birou Variance vs average: supply chain lead-time as a predictor of financial performance Journal of Supply Chain Management 12 2007 349 357
-
(2007)
Journal of Supply Chain Management
, vol.12
, pp. 349-357
-
-
Christensen, W.J.1
Germain, R.N.2
Birou, L.3
-
7
-
-
70350566557
-
A comment: 'Integrated single vendor single buyer model with stochastic demand and variable lead time'
-
C.H. Glock A comment: 'integrated single vendor single buyer model with stochastic demand and variable lead time' International Journal of Production Economics 122 2009 790 792
-
(2009)
International Journal of Production Economics
, vol.122
, pp. 790-792
-
-
Glock, C.H.1
-
9
-
-
80052174893
-
Batch sizing with controllable production rates in a multi-stage production system
-
C.H. Glock Batch sizing with controllable production rates in a multi-stage production system International Journal of Production Research 49 2011 6017 6039
-
(2011)
International Journal of Production Research
, vol.49
, pp. 6017-6039
-
-
Glock, C.H.1
-
11
-
-
0032639797
-
A stochastic inventory model with lead time and lot size interaction
-
M. Hariga A stochastic inventory model with lead time and lot size interaction Production Planning and Control 10 1999 434 438
-
(1999)
Production Planning and Control
, vol.10
, pp. 434-438
-
-
Hariga, M.1
-
14
-
-
34249670231
-
An alternative model for integrated vendor-buyer inventory under controllable lead time and its heuristic solution
-
DOI 10.1080/00207720701358966, PII 779088469
-
M.A. Hoque An alternative model for integrated vendorbuyer inventory under controllable lead time and its heuristic solution International Journal of Systems Science 38 2007 501 509 (Pubitemid 46842759)
-
(2007)
International Journal of Systems Science
, vol.38
, Issue.6
, pp. 501-509
-
-
Hoque, M.A.1
-
15
-
-
33646107382
-
A heuristic procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer
-
M.A. Hoque, and S.K. Goyal A heuristic procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer International Journal of Production Economics 102 2006 217 225
-
(2006)
International Journal of Production Economics
, vol.102
, pp. 217-225
-
-
Hoque, M.A.1
Goyal, S.K.2
-
16
-
-
45049085486
-
A note on integrated single vendor single buyer model with stochastic demand and variable lead time
-
Y.-C. Hsiao A note on integrated single vendor single buyer model with stochastic demand and variable lead time International Journal of Production Economics 114 2008 294 297
-
(2008)
International Journal of Production Economics
, vol.114
, pp. 294-297
-
-
Hsiao, Y.-C.1
-
17
-
-
0000972493
-
Comments on 'a quantity discount pricing model to increase vendor profits'
-
P.N. Joglekar Comments on 'a quantity discount pricing model to increase vendor profits' Management Science 34 1988 1391 1398
-
(1988)
Management Science
, vol.34
, pp. 1391-1398
-
-
Joglekar, P.N.1
-
19
-
-
0023310940
-
Lot sizes, lead times and in-process inventories
-
U.S. Karmarker Lot sizes, lead times and in-process inventories Management Science 33 1987 409 418
-
(1987)
Management Science
, vol.33
, pp. 409-418
-
-
Karmarker, U.S.1
-
20
-
-
0028698197
-
Economic production lot size model with variable production rate and imperfect quality
-
M. Khouja, and A. Mehrez Economic production lot size model with variable production rate and imperfect quality Journal of the Operational Research Society 45 1994 1405 1417
-
(1994)
Journal of the Operational Research Society
, vol.45
, pp. 1405-1417
-
-
Khouja, M.1
Mehrez, A.2
-
23
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production system
-
H.L. Lee, and M.J. Rosenblatt Simultaneous determination of production cycle and inspection schedules in a production system Management Science 33 1987 1125 1136
-
(1987)
Management Science
, vol.33
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
24
-
-
33751409590
-
Two-storage inventory model with lot-size dependent fuzzy lead-time under possibility constraints via genetic algorithm
-
DOI 10.1016/j.ejor.2006.03.029, PII S0377221706002165
-
M.K. Maiti, and M. Maiti Two-storage inventory model with lot-size dependent fuzzy lead-time under possibility constraints via genetic algorithm European Journal of Operational Research 179 2007 352 371 (Pubitemid 44821625)
-
(2007)
European Journal of Operational Research
, vol.179
, Issue.2
, pp. 352-371
-
-
Maiti, M.K.1
Maiti, M.2
-
25
-
-
0037142693
-
Lot size reorder point inventory model with controllable lead time and set-up cost
-
L.Y. Ouyang, and H.C. Chang Lot size reorder point inventory model with controllable lead time and set-up cost International Journal of Systems Science 33 2002 635 642
-
(2002)
International Journal of Systems Science
, vol.33
, pp. 635-642
-
-
Ouyang, L.Y.1
Chang, H.C.2
-
27
-
-
9544241347
-
Integrated vendorbuyer cooperative models with stochastic demand in controllable lead time
-
L.Y. Ouyang, K.S. Wu, and C.H. Ho Integrated vendorbuyer cooperative models with stochastic demand in controllable lead time International Journal of Production Economics 92 2004 255 266
-
(2004)
International Journal of Production Economics
, vol.92
, pp. 255-266
-
-
Ouyang, L.Y.1
Wu, K.S.2
Ho, C.H.3
-
28
-
-
51949101193
-
The learning effect on setup cost reduction for mixture inventory models with variable lead time
-
J.C.-H. Pan, and M.C. Lo The learning effect on setup cost reduction for mixture inventory models with variable lead time Asia Pacific Journal of Operational Research 25 2008 513 529
-
(2008)
Asia Pacific Journal of Operational Research
, vol.25
, pp. 513-529
-
-
Pan, J.C.-H.1
Lo, M.C.2
-
29
-
-
0037139670
-
A study of an integrated inventory with controllable lead time
-
DOI 10.1080/00207540110105680
-
J.C.-H. Pan, and J.S. Yang A study of an integrated inventory with controllable lead time International Journal of Production Research 40 2002 1263 1273 (Pubitemid 34593797)
-
(2002)
International Journal of Production Research
, vol.40
, Issue.5
, pp. 1263-1273
-
-
Pan, J.C.-H.1
Yang, J.-S.2
-
30
-
-
0000752798
-
Investing in reduced setups in the EOQ model
-
E.L. Portheus Investing in reduced setups in the EOQ model Management Science 31 1985 998 1010
-
(1985)
Management Science
, vol.31
, pp. 998-1010
-
-
Portheus, E.L.1
-
35
-
-
26844524646
-
Setup time reduction for electronics assembly: Combining simple (SMED) and IT-based methods
-
S.C. Trovinger, and R.E. Bohn Setup time reduction for electronics assembly: combining simple (SMED) and IT-based methods Production and Operations Management 14 2005 205 217 (Pubitemid 41452504)
-
(2005)
Production and Operations Management
, vol.14
, Issue.2
, pp. 205-217
-
-
Trovinger, S.C.1
Bohn, R.E.2
-
36
-
-
34250886305
-
Integrated vendorbuyer inventory system with sublot sampling inspection policy and controllable lead time
-
K.S. Wu, L.Y. Ouyang, and C.H. Ho Integrated vendorbuyer inventory system with sublot sampling inspection policy and controllable lead time International Journal of Systems Science 38 2007 339 350
-
(2007)
International Journal of Systems Science
, vol.38
, pp. 339-350
-
-
Wu, K.S.1
Ouyang, L.Y.2
Ho, C.H.3
-
37
-
-
1342266030
-
Just-in-time purchasing: An integrated inventory model involving deterministic variable lead time and quality improvement investment
-
J.S. Yang, and Y.C.-H. Pan Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment International Journal of Production Research 42 2004 853 863
-
(2004)
International Journal of Production Research
, vol.42
, pp. 853-863
-
-
Yang, J.S.1
Pan, Y.C.-H.2
-
38
-
-
27944501669
-
A mixed inventory model with variable lead time and random back-order rate
-
DOI 10.1080/00207720500089465
-
R. Zequeira, A. Durán, and G. Gutiérrez A mixed inventory model with variable lead time and random back-order rate International Journal of Systems Science 36 2005 329 339 (Pubitemid 41663594)
-
(2005)
International Journal of Systems Science
, vol.36
, Issue.6
, pp. 329-339
-
-
Zequeira, R.I.1
Duran, A.2
Gutierrez, G.3
-
39
-
-
34247524138
-
Pushing quality improvement along supply chains
-
DOI 10.1287/mnsc.1060.0634
-
K. Zhu, R.Q. Zhang, and F. Tsung Pushing quality improvement along the supply chain Management Science 53 2007 421 436 (Pubitemid 46652842)
-
(2007)
Management Science
, vol.53
, Issue.3
, pp. 421-436
-
-
Zhu, K.1
Zhang, R.Q.2
Tsung, F.3
|