메뉴 건너뛰기




Volumn 37, Issue 1, 1999, Pages 111-123

Dispatching rail-guided vehicles and scheduling jobs in a flexible manufacturing system

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; MATERIALS HANDLING EQUIPMENT; PRODUCTION CONTROL; RAILROAD ROLLING STOCK; STATISTICAL METHODS; THROUGHPUT;

EID: 0032783936     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075499191959     Document Type: Article
Times cited : (24)

References (18)
  • 3
    • 0023824587 scopus 로고
    • Evaluation of traditional work scheduling rules in a flexible manufacturing system with a physical simulator
    • Choi, R. H. and Malstrom, E. M., 1988, Evaluation of traditional work scheduling rules in a flexible manufacturing system with a physical simulator. Journal of Manufacturing Systems, 7, 33-45.
    • (1988) Journal of Manufacturing Systems , vol.7 , pp. 33-45
    • Choi, R.H.1    Malstrom, E.M.2
  • 5
    • 0029541620 scopus 로고
    • Scheduling of storage/retrieval order under a just-in-time environment
    • Lee, M.-K. and Kim, S.-Y., 1995, Scheduling of storage/retrieval order under a just-in-time environment. International Journal of Production Research, 33, 3331-3348.
    • (1995) International Journal of Production Research , vol.33 , pp. 3331-3348
    • Lee, M.-K.1    Im, S.-Y.2
  • 6
    • 0003094781 scopus 로고
    • A hybrid modeling approach to the design of an AGV-based material handling system for an FMS
    • Mahadevan, B. and Narendran, T. T., 1994, A hybrid modeling approach to the design of an AGV-based material handling system for an FMS. International Journal of Production Research, 32, 2015-2030.
    • (1994) International Journal of Production Research , vol.32 , pp. 2015-2030
    • Mahadevan, B.1    Narendran, T.T.2
  • 8
    • 0026907894 scopus 로고
    • Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system
    • O’ Keefe, R. M. and Kasirajan, T., 1992, Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system. International Journal of Production Research, 30, 1753-1772.
    • (1992) International Journal of Production Research , vol.30 , pp. 1753-1772
    • O’ Keefe, R.M.1    Kasirajan, T.2
  • 11
    • 0001242514 scopus 로고
    • Launching and dispatching strategies for multi-criteria control of closed manufacturing systems with flexible routing capability
    • Piplani, R. and Talavage, J., 1995, Launching and dispatching strategies for multi-criteria control of closed manufacturing systems with flexible routing capability. International Journal of Production Research, 33, 2181-2196.
    • (1995) International Journal of Production Research , vol.33 , pp. 2181-2196
    • Piplani, R.1    Talavage, J.2
  • 12
    • 0027594172 scopus 로고
    • Design and evaluation of automated guided vehicle systems for flexible manufacturing systems: An extended timed petri net-based approach
    • Raju, R. K. and Chetty, K. O. V., 1993, Design and evaluation of automated guided vehicle systems for flexible manufacturing systems: an extended timed petri net-based approach. International Journal of Production Research, 31, 1069-1096.
    • (1993) International Journal of Production Research , vol.31 , pp. 1069-1096
    • Raju, R.K.1    Chetty, K.O.V.2
  • 13
    • 0026898533 scopus 로고
    • Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion
    • Sabuncuoglu, I. and Hommertzheim, D. L., 1992, Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion. International Journal of Production Research, 30, 1617-1635.
    • (1992) International Journal of Production Research , vol.30 , pp. 1617-1635
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 14
    • 0042088700 scopus 로고
    • Experimental investigation of an FMS due-date scheduling problem: Evaluation of machine and AGV scheduling rules
    • Sabuncuoglu, I. and Hommertzheim, D. L., 1993, Experimental investigation of an FMS due-date scheduling problem: evaluation of machine and AGV scheduling rules. International Journal of Flexible Manufacturing System, 5, 301-323.
    • (1993) International Journal of Flexible Manufacturing System , vol.5 , pp. 301-323
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 16
    • 0027609316 scopus 로고
    • A study on decision rules of a scheduling model in an FMS
    • Tang, L., Yih, Y. and Liu, C., 1993, A study on decision rules of a scheduling model in an FMS. Computers in Industry, 22, 1-3.
    • (1993) Computers in Industry , vol.22 , pp. 1-3
    • Tang, L.1    Yih, Y.2    Liu, C.3
  • 17
    • 0027187520 scopus 로고
    • Push and Pull rules for dispatching automated guided vehicles in a flexible manufacturing system
    • Yim, D. and Linn, R. L., 1993, Push and Pull rules for dispatching automated guided vehicles in a flexible manufacturing system. International Journal of Production Research, 31, 4357.
    • (1993) International Journal of Production Research , vol.31 , pp. 4357
    • Yim, D.1    Linn, R.L.2
  • 18
    • 0342878597 scopus 로고    scopus 로고
    • Scheduling of rail-guided vehicles in the load/unload area of a flexible manufacturing system
    • Yingpunyachok, C., Chen, F. and Lee, J., 1996, Scheduling of rail-guided vehicles in the load/unload area of a flexible manufacturing system. International Journal of Industrial Engineering, 3, 11-20.
    • (1996) International Journal of Industrial Engineering , vol.3 , pp. 11-20
    • Yingpunyachok, C.1    Chen, F.2    Lee, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.