-
1
-
-
0020013653
-
A state-of-the-art survey of dispatching rules for manufacturing job shop operations
-
Blackstone, J. H., Jr., Phillips, D. T. and Hogg, G. L., 1982, A state-of-the-art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research, 20, 27-45.
-
(1982)
International Journal of Production Research
, vol.20
, pp. 27-45
-
-
Blackstone, J.H.1
Phillips, D.T.2
Hogg, G.L.3
-
2
-
-
0026253933
-
Intelligent dispatching for flexible manufacturing
-
Chandra, J. and Talavage, J., 1991, Intelligent dispatching for flexible manufacturing. International Journal of Production Research, 29, 2259-2278.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 2259-2278
-
-
Chandra, J.1
Talavage, J.2
-
3
-
-
0023824587
-
Evaluation of traditional work scheduling rules in a flexible manufacturing system with a physical simulator
-
Choi, R. H. and Malstrom, E. M., 1988, Evaluation of traditional work scheduling rules in a flexible manufacturing system with a physical simulator. Journal of Manufacturing Systems, 7, 33-45.
-
(1988)
Journal of Manufacturing Systems
, vol.7
, pp. 33-45
-
-
Choi, R.H.1
Malstrom, E.M.2
-
4
-
-
0021423836
-
Characterization of automatic guided vehicle dispatching rules
-
Egbelu, P. J. and Tanchoco, J. M. A., 1984, Characterization of automatic guided vehicle dispatching rules. International Journal of Production Research, 22, 359-374.
-
(1984)
International Journal of Production Research
, vol.22
, pp. 359-374
-
-
Egbelu, P.J.1
Tanchoco, J.M.A.2
-
5
-
-
0029541620
-
Scheduling of storage/retrieval order under a just-in-time environment
-
Lee, M.-K. and Kim, S.-Y., 1995, Scheduling of storage/retrieval order under a just-in-time environment. International Journal of Production Research, 33, 3331-3348.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 3331-3348
-
-
Lee, M.-K.1
Im, S.-Y.2
-
6
-
-
0003094781
-
A hybrid modeling approach to the design of an AGV-based material handling system for an FMS
-
Mahadevan, B. and Narendran, T. T., 1994, A hybrid modeling approach to the design of an AGV-based material handling system for an FMS. International Journal of Production Research, 32, 2015-2030.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 2015-2030
-
-
Mahadevan, B.1
Narendran, T.T.2
-
7
-
-
0025416939
-
Analysis of scheduling rules for an FMS
-
Montazeri, M. and Van Wassenhove, L. N., 1990, Analysis of scheduling rules for an FMS. International Journal of Production Research, 28, 785-802.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 785-802
-
-
Montazeri, M.1
Vanwassenhove, L.N.2
-
8
-
-
0026907894
-
Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system
-
O’ Keefe, R. M. and Kasirajan, T., 1992, Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system. International Journal of Production Research, 30, 1753-1772.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 1753-1772
-
-
O’ Keefe, R.M.1
Kasirajan, T.2
-
9
-
-
0003054955
-
A survey of scheduling rules
-
Panwalkar, S. S. and Iskander, W., 1977, A survey of scheduling rules. Operations Research, 25, 45-61.
-
(1977)
Operations Research
, vol.25
, pp. 45-61
-
-
Panwalkar, S.S.1
Iskander, W.2
-
10
-
-
0004009033
-
-
Blacklick, OH: McGraw-Hill)
-
Pegden, C. D., Shannon, R. E. and Sadowski, R. P., 1995, Introduction to Simulation Using SIMAN (Blacklick, OH: McGraw-Hill).
-
(1995)
Introduction to Simulation Using SIMAN
-
-
Pegden, C.D.1
Shannon, R.E.2
Sadowski, R.P.3
-
11
-
-
0001242514
-
Launching and dispatching strategies for multi-criteria control of closed manufacturing systems with flexible routing capability
-
Piplani, R. and Talavage, J., 1995, Launching and dispatching strategies for multi-criteria control of closed manufacturing systems with flexible routing capability. International Journal of Production Research, 33, 2181-2196.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 2181-2196
-
-
Piplani, R.1
Talavage, J.2
-
12
-
-
0027594172
-
Design and evaluation of automated guided vehicle systems for flexible manufacturing systems: An extended timed petri net-based approach
-
Raju, R. K. and Chetty, K. O. V., 1993, Design and evaluation of automated guided vehicle systems for flexible manufacturing systems: an extended timed petri net-based approach. International Journal of Production Research, 31, 1069-1096.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 1069-1096
-
-
Raju, R.K.1
Chetty, K.O.V.2
-
13
-
-
0026898533
-
Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion
-
Sabuncuoglu, I. and Hommertzheim, D. L., 1992, Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion. International Journal of Production Research, 30, 1617-1635.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 1617-1635
-
-
Sabuncuoglu, I.1
Hommertzheim, D.L.2
-
14
-
-
0042088700
-
Experimental investigation of an FMS due-date scheduling problem: Evaluation of machine and AGV scheduling rules
-
Sabuncuoglu, I. and Hommertzheim, D. L., 1993, Experimental investigation of an FMS due-date scheduling problem: evaluation of machine and AGV scheduling rules. International Journal of Flexible Manufacturing System, 5, 301-323.
-
(1993)
International Journal of Flexible Manufacturing System
, vol.5
, pp. 301-323
-
-
Sabuncuoglu, I.1
Hommertzheim, D.L.2
-
15
-
-
84952242943
-
Loading and control policies for a flexible manufacturing system
-
Stecke, K. E. and Solberg, J. J., 1981, Loading and control policies for a flexible manufacturing system. International Journal of Production Research, 19, 481-490.
-
(1981)
International Journal of Production Research
, vol.19
, pp. 481-490
-
-
Stecke, K.E.1
Solberg, J.J.2
-
16
-
-
0027609316
-
A study on decision rules of a scheduling model in an FMS
-
Tang, L., Yih, Y. and Liu, C., 1993, A study on decision rules of a scheduling model in an FMS. Computers in Industry, 22, 1-3.
-
(1993)
Computers in Industry
, vol.22
, pp. 1-3
-
-
Tang, L.1
Yih, Y.2
Liu, C.3
-
17
-
-
0027187520
-
Push and Pull rules for dispatching automated guided vehicles in a flexible manufacturing system
-
Yim, D. and Linn, R. L., 1993, Push and Pull rules for dispatching automated guided vehicles in a flexible manufacturing system. International Journal of Production Research, 31, 4357.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 4357
-
-
Yim, D.1
Linn, R.L.2
-
18
-
-
0342878597
-
Scheduling of rail-guided vehicles in the load/unload area of a flexible manufacturing system
-
Yingpunyachok, C., Chen, F. and Lee, J., 1996, Scheduling of rail-guided vehicles in the load/unload area of a flexible manufacturing system. International Journal of Industrial Engineering, 3, 11-20.
-
(1996)
International Journal of Industrial Engineering
, vol.3
, pp. 11-20
-
-
Yingpunyachok, C.1
Chen, F.2
Lee, J.3
|