메뉴 건너뛰기




Volumn 9780521518512, Issue , 2012, Pages 1-191

Stochastic scheduling

Author keywords

[No Author keywords available]

Indexed keywords

ENGINEERING EDUCATION; PRODUCTION CONTROL; SCHEDULING; STUDENTS;

EID: 84925616349     PISSN: None     EISSN: None     Source Type: Book    
DOI: 10.1017/CBO9780511778032     Document Type: Book
Times cited : (5)

References (68)
  • 1
    • 0034745712 scopus 로고    scopus 로고
    • On computing the distribution function of the sum of independent random variables
    • Agrawal, M. K., and Elmaghraby, S. E. 2001. “On computing the distribution function of the sum of independent random variables.” Computers and Operations Research 28(5):473-483.
    • (2001) Computers and Operations Research , vol.28 , Issue.5 , pp. 473-483
    • Agrawal, M.K.1    Elmaghraby, S.E.2
  • 2
    • 0034179695 scopus 로고    scopus 로고
    • Scheduling of multiclass single server queues under nontraditional performance measures
    • Ayhan, H., and Olsen, T. L. 2000. “Scheduling of multiclass single server queues under nontraditional performance measures.” Operations Research 48(3):482-489.
    • (2000) Operations Research , vol.48 , Issue.3 , pp. 482-489
    • Ayhan, H.1    Olsen, T.L.2
  • 4
    • 0001310038 scopus 로고
    • The greatest of a finite set of random variables
    • Clark, C. E. 1961. “The greatest of a finite set of random variables.” Operations Research 9:145-162.
    • (1961) Operations Research , vol.9 , pp. 145-162
    • Clark, C.E.1
  • 6
    • 0029254356 scopus 로고
    • Robust scheduling to hedge against processing time uncertainty in single-stage production
    • Daniels, R. L., and Kouvelis, P. 1995. “Robust scheduling to hedge against processing time uncertainty in single-stage production.” Management Science 41(2):363-376.
    • (1995) Management Science , vol.41 , Issue.2 , pp. 363-376
    • Daniels, R.L.1    Kouvelis, P.2
  • 7
    • 0031268742 scopus 로고    scopus 로고
    • β-robust scheduling for single-machine systems with uncertain processing times
    • Daniels, R. L., and Carrillo, J. E. 1997. “β-Robust scheduling for single-machine systems with uncertain processing times.” IIE Transactions 29:977-985.
    • (1997) IIE Transactions , vol.29 , pp. 977-985
    • Daniels, R.L.1    Carrillo, J.E.2
  • 8
    • 0032628093 scopus 로고    scopus 로고
    • Conwip-based production lines with multiple bottlenecks: Performance and design implications
    • Dar-el, E. M., Herer, Y. T., and Masin, M. 1999. “CONWIP-based production lines with multiple bottlenecks: Performance and design implications.” IIE Transactions 31:99-111.
    • (1999) IIE Transactions , vol.31 , pp. 99-111
    • Dar-El, E.M.1    Herer, Y.T.2    Masin, M.3
  • 9
    • 0026980968 scopus 로고
    • Expectation-variance analysis of job sequences under processing time uncertainty
    • De, P., Ghosh, J. B., and Wells, C. E. 1992. “Expectation-variance analysis of job sequences under processing time uncertainty.” International Journal of Production Economics 28:289-297.
    • (1992) International Journal of Production Economics , vol.28 , pp. 289-297
    • De, P.1    Ghosh, J.B.2    Wells, C.E.3
  • 13
    • 0021822930 scopus 로고
    • Approximating the distribution function in stochastic networks
    • Dodin, B. 1985. “Approximating the distribution function in stochastic networks.” Computers and Operations Research 12(3):251-264.
    • (1985) Computers and Operations Research , vol.12 , Issue.3 , pp. 251-264
    • Dodin, B.1
  • 14
    • 0030241566 scopus 로고    scopus 로고
    • Determining the optimal sequences and the distributional properties of the completion times in stochastic flow shops
    • Dodin, B. 1996. “Determining the optimal sequences and the distributional properties of the completion times in stochastic flow shops.” Computers and Operations Research 23:829-843.
    • (1996) Computers and Operations Research , vol.23 , pp. 829-843
    • Dodin, B.1
  • 15
    • 0027647549 scopus 로고
    • Characterizing the output process of a conwip line with deterministic processing and random outages
    • Duenyas, I., Hopp, W. H., and Spearman, M. L. 1993. “Characterizing the output process of a CONWIP line with deterministic processing and random outages.” Management Science 39:975-988.
    • (1993) Management Science , vol.39 , pp. 975-988
    • Duenyas, I.1    Hopp, W.H.2    Spearman, M.L.3
  • 17
    • 0029206513 scopus 로고
    • Bicriteria stochastic scheduling on one or more machines
    • Forst, F. G. 1995. “Bicriteria stochastic scheduling on one or more machines.” European Journal of Operational Research 80:404-409.
    • (1995) European Journal of Operational Research , vol.80 , pp. 404-409
    • Forst, F.G.1
  • 18
    • 0016510894 scopus 로고
    • Surrogate constraint duality in mathematical programming
    • Glover, F. 1975. “Surrogate constraint duality in mathematical programming.” Operations Research 23:434-453.
    • (1975) Operations Research , vol.23 , pp. 434-453
    • Glover, F.1
  • 20
    • 0000000169 scopus 로고
    • The output processes of serial production lines of exponential machines with finite buffers
    • Hendricks, K. B. 1992. “The output processes of serial production lines of exponential machines with finite buffers.” Operations Research 40(6):1139-1147.
    • (1992) Operations Research , vol.40 , Issue.6 , pp. 1139-1147
    • Hendricks, K.B.1
  • 21
    • 0003075019 scopus 로고
    • Optimal two-and three-stage production schedules with setup times included
    • Johnson, S. M. 1954. “Optimal two-and three-stage production schedules with setup times included.” Naval Research Logistics Quarterly 1:61-67.
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-67
    • Johnson, S.M.1
  • 22
    • 28844486630 scopus 로고
    • Bicriteria single-stage scheduling to minimize both the expected value and the variance of the total flow time
    • (in Japanese)
    • Jung, Y. S., Nagasawa, H., and Nishiyama, N. 1990. “Bicriteria single-stage scheduling to minimize both the expected value and the variance of the total flow time.” Journal of Japan Industrial Management Association 39:76-82 (in Japanese).
    • (1990) Journal of Japan Industrial Management Association , vol.39 , pp. 76-82
    • Jung, Y.S.1    Nagasawa, H.2    Nishiyama, N.3
  • 23
    • 0033894477 scopus 로고    scopus 로고
    • Robust scheduling of a twomachine flow shop with uncertain processing times
    • Kouvelis, P., Daniels, R. L., and Vairaktarakis, G. 2000. “Robust scheduling of a twomachine flow shop with uncertain processing times.” IIE Transactions 32:421-432.
    • (2000) IIE Transactions , vol.32 , pp. 421-432
    • Kouvelis, P.1    Daniels, R.L.2    Vairaktarakis, G.3
  • 25
    • 0029290455 scopus 로고
    • Single-machine stochastic scheduling with dual criteria
    • Lin, C., and Lee, C. 1995. “Single-machine stochastic scheduling with dual criteria.” IIE Transactions 27:244-249.
    • (1995) IIE Transactions , vol.27 , pp. 244-249
    • Lin, C.1    Lee, C.2
  • 26
    • 0020496895 scopus 로고
    • Hybrid algorithm for sequencing with bicriteria
    • Lin, K. S. 1983. “Hybrid algorithm for sequencing with bicriteria.” Journal of Optimization Theory and Applications 39(1):105-124.
    • (1983) Journal of Optimization Theory and Applications , vol.39 , Issue.1 , pp. 105-124
    • Lin, K.S.1
  • 27
    • 84925687597 scopus 로고
    • Multiobjective discounted markov decision processes with expectation and variance criteria
    • Liu, Q., Ohno, K., and Nakayama, H. 1992. “Multiobjective discounted Markov decision processes with expectation and variance criteria.” International Journal of Systems Science 23(6):903-914.
    • (1992) International Journal of Systems Science , vol.23 , Issue.6 , pp. 903-914
    • Liu, Q.1    Ohno, K.2    Nakayama, H.3
  • 28
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants
    • Lu, S. C. H., Ramaswamy, D., and Kumar, P. R. 1994. “Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants.” IEEE Transactions on Semiconductor Manufacturing 7(3):374-385.
    • (1994) IEEE Transactions on Semiconductor Manufacturing , vol.7 , Issue.3 , pp. 374-385
    • Lu, S.1    Ramaswamy, D.2    Kumar, P.R.3
  • 29
    • 0022746883 scopus 로고
    • Resource-constrained assignment scheduling
    • Mazzola, J. B., and Neebe, A. W. 1986. “Resource-constrained assignment scheduling.” Operations Research 34:560-572.
    • (1986) Operations Research , vol.34 , pp. 560-572
    • Mazzola, J.B.1    Neebe, A.W.2
  • 30
    • 0002748923 scopus 로고
    • Job-shop scheduling theory: What is relevant?
    • McKay, K. N., Safayeni, F. R., and Buzacott, J. A. 1988. “Job-shop scheduling theory: What is relevant?” Interfaces 18:84-90.
    • (1988) Interfaces , vol.18 , pp. 84-90
    • McKay, K.N.1    Safayeni, F.R.2    Buzacott, J.A.3
  • 34
    • 0030241820 scopus 로고    scopus 로고
    • Multiobjective genetic algorithm and its applications to flowshop scheduling
    • Murata, T., Ishibuchi, H., and Tanaka, H. 1996. “Multiobjective genetic algorithm and its applications to flowshop scheduling.” Computers and Industrial Engineering 30:957-968.
    • (1996) Computers and Industrial Engineering , vol.30 , pp. 957-968
    • Murata, T.1    Ishibuchi, H.2    Tanaka, H.3
  • 36
    • 28844495688 scopus 로고    scopus 로고
    • Interactive decision system in stochastic multiobjective scheduling to minimize the expected value and variance of total flow time
    • Nagasawa, H., and Shing, C. 1998. “Interactive decision system in stochastic multiobjective scheduling to minimize the expected value and variance of total flow time.” Journal of the Operations Research Society of Japan 41(2):261-278.
    • (1998) Journal of the Operations Research Society of Japan , vol.41 , Issue.2 , pp. 261-278
    • Nagasawa, H.1    Shing, C.2
  • 37
    • 0022698428 scopus 로고
    • Scheduling with multiple performance measures: The one-machine case
    • Nelson, R. T., Sarin, R. K., and Daniels, R. L. 1986. “Scheduling with multiple performance measures: The one-machine case.” Management Science 32(4):464-479.
    • (1986) Management Science , vol.32 , Issue.4 , pp. 464-479
    • Nelson, R.T.1    Sarin, R.K.2    Daniels, R.L.3
  • 39
    • 0032204349 scopus 로고    scopus 로고
    • Makespan related criteria for comparing schedules in stochastic environments
    • Portougal, V., and Trietsch, D. 1998. “Makespan related criteria for comparing schedules in stochastic environments.” The Journal of the Operational Research Society. 49(11):1188-1195.
    • (1998) The Journal of the Operational Research Society , vol.49 , Issue.11 , pp. 1188-1195
    • Portougal, V.1    Trietsch, D.2
  • 40
    • 0029635352 scopus 로고
    • Heuristics for scheduling in flowshop with multiple objectives
    • Rajendran, C. 1995. “Heuristics for scheduling in flowshop with multiple objectives.” European Journal of Operational Research 82:540-555.
    • (1995) European Journal of Operational Research , vol.82 , pp. 540-555
    • Rajendran, C.1
  • 44
    • 4344713001 scopus 로고    scopus 로고
    • Equal processing time bicriteria scheduling on parallel machines
    • Sarin, S. C., and Prakash, D. 2004. “Equal processing time bicriteria scheduling on parallel machines.” Journal of Combinatorial Optimization 8:227-240.
    • (2004) Journal of Combinatorial Optimization , vol.8 , pp. 227-240
    • Sarin, S.C.1    Prakash, D.2
  • 47
    • 0030315228 scopus 로고    scopus 로고
    • Interactive decision support system in stochastic multi-objective scheduling
    • Shing, C., and Nagasawa, H. 1997. “Interactive decision support system in stochastic multi-objective scheduling.” Bulletin of Osaka Prefecture University, Series A, 45(2):133-142.
    • (1997) Bulletin of Osaka Prefecture University, Series A , vol.45 , Issue.2 , pp. 133-142
    • Shing, C.1    Nagasawa, H.2
  • 48
    • 0032678388 scopus 로고    scopus 로고
    • Interactive decision support system in stochastic multi-objective portfolio selection
    • Shing, C., and Nagasawa, H. 1999. “Interactive decision support system in stochastic multi-objective portfolio selection.” International Journal of Production Economics 60-61:187-193.
    • (1999) International Journal of Production Economics , vol.60-61 , pp. 187-193
    • Shing, C.1    Nagasawa, H.2
  • 49
    • 0017629555 scopus 로고
    • Bounding distributions for a stochastic pert network
    • Shogan, A. 1977. “Bounding distributions for a stochastic PERT network.” Networks 7(4):359-381.
    • (1977) Networks , vol.7 , Issue.4 , pp. 359-381
    • Shogan, A.1
  • 50
    • 0026119502 scopus 로고
    • Throughput of a constant work in process manufacturing line subject to failures
    • Spearman, M. L., and Hopp, W. H. 1991. “Throughput of a constant work in process manufacturing line subject to failures.” International Journal of Production Research 29:635-655.
    • (1991) International Journal of Production Research , vol.29 , pp. 635-655
    • Spearman, M.L.1    Hopp, W.H.2
  • 52
    • 0028517492 scopus 로고
    • The most critical path in apertnetwork:Aheuristic approach
    • Soroush, H. M. 1994. “The most critical path in aPERTnetwork:Aheuristic approach.” European Journal of Operational Research 78(1):93-105.
    • (1994) European Journal of Operational Research , vol.78 , Issue.1 , pp. 93-105
    • Soroush, H.M.1
  • 53
    • 0028768513 scopus 로고
    • The stochastic single machine scheduling problem with earliness and tardiness costs
    • Soroush, H. M., and Fredenhall, L. D. 1984. “The stochastic single machine scheduling problem with earliness and tardiness costs.” European Journal of Operational Research 77:187-302.
    • (1984) European Journal of Operational Research , vol.77 , pp. 187-302
    • Soroush, H.M.1    Fredenhall, L.D.2
  • 54
    • 0011717266 scopus 로고
    • Determination of part-delivery dates in a small lot stochastic assembly system
    • Srivastava, R. K., and Sarin, S. C. 1993. “Determination of part-delivery dates in a small lot stochastic assembly system.” Opsearch 30(4):281-312.
    • (1993) Opsearch , vol.30 , Issue.4 , pp. 281-312
    • Srivastava, R.K.1    Sarin, S.C.2
  • 55
    • 0031220337 scopus 로고    scopus 로고
    • Variance of the throughput of an n-station production line with no intermediate buffers and time dependent failures
    • Tan, B. 1997. “Variance of the throughput of an n-station production line with no intermediate buffers and time dependent failures.” European Journal of Operational Research 101:560-576.
    • (1997) European Journal of Operational Research , vol.101 , pp. 560-576
    • Tan, B.1
  • 56
    • 0034397419 scopus 로고    scopus 로고
    • Asymptotic variance rate of the output in production lines with finite buffers
    • Tan, B. 2000. “Asymptotic variance rate of the output in production lines with finite buffers.” Annals of Operations Research 93:385-403.
    • (2000) Annals of Operations Research , vol.93 , pp. 385-403
    • Tan, B.1
  • 58
    • 0000073296 scopus 로고    scopus 로고
    • Rates of convergence for the maximum likelihood estimator in mixture models
    • van de Geer, S. A. 1996. “Rates of convergence for the maximum likelihood estimator in mixture models.” Journal Nonparametric Statistics 6:293-310.
    • (1996) Journal Nonparametric Statistics , vol.6 , pp. 293-310
    • Van De Geer, S.A.1
  • 59
    • 0037469106 scopus 로고    scopus 로고
    • Asymptotic theory for maximum likelihood in nonparametric mixture models
    • van de Geer, S. A. 2004. “Asymptotic theory for maximum likelihood in nonparametric mixture models.” Computational Statistics & Data Analysis 41:453-464.
    • (2004) Computational Statistics & Data Analysis , vol.41 , pp. 453-464
    • Van De Geer, S.A.1
  • 60
    • 27944444072 scopus 로고    scopus 로고
    • Multivariate normal distribution based statistical timing analysis using global projection and local expansion
    • Wang, B., and Mazumder, P. 2005. “Multivariate normal distribution based statistical timing analysis using global projection and local expansion.” In: Proceedings of the 18th International Conference on VLSI Design, pp. 380-385.
    • (2005) Proceedings of the 18Th International Conference on VLSI Design , pp. 380-385
    • Wang, B.1    Mazumder, P.2
  • 62
    • 0022482238 scopus 로고
    • A model to approximate transient performance of the flowshop
    • Wilhelm, W. E. 1986. “A model to approximate transient performance of the flowshop.” International Journal of Production Research 24(1):33-50.
    • (1986) International Journal of Production Research , vol.24 , Issue.1 , pp. 33-50
    • Wilhelm, W.E.1
  • 63
    • 0022920547 scopus 로고
    • The application of lognormal models of transient operations in the flexible manufacturing environment
    • Wilhelm, W. E. 1986. “The application of lognormal models of transient operations in the flexible manufacturing environment.” Journal of Manufacturing Systems 5(4): 253-266.
    • (1986) Journal of Manufacturing Systems , vol.5 , Issue.4 , pp. 253-266
    • Wilhelm, W.E.1
  • 64
    • 0020178127 scopus 로고
    • A methodology to describe operating characteristics of assembly systems
    • Wilhelm, W. E., and Ahmadi-Marandi, S. 1982. “A methodology to describe operating characteristics of assembly systems.” IIE Transactions 14(3):204-214.
    • (1982) IIE Transactions , vol.14 , Issue.3 , pp. 204-214
    • Wilhelm, W.E.1    Ahmadi-Marandi, S.2
  • 66
    • 0002210265 scopus 로고
    • On the convergence properties of the em algorithm
    • Wu, C. F. J. 1983. “On the convergence properties of the EM algorithm.” Annals of Statistics 11:55-103.
    • (1983) Annals of Statistics , vol.11 , pp. 55-103
    • Wu, C.1
  • 67
    • 0036498099 scopus 로고    scopus 로고
    • On the robust single machine scheduling problem
    • Yang, J., and Yu, G. 2002. “On the robust single machine scheduling problem.” Journal of Combinatorial Optimization 6:17-33.
    • (2002) Journal of Combinatorial Optimization , vol.6 , pp. 17-33
    • Yang, J.1    Yu, G.2
  • 68
    • 34249865056 scopus 로고    scopus 로고
    • A new approximation algorithm for obtaining the probability distribution function for project completion time
    • Yao, M., and Chu, W. 2007. “A new approximation algorithm for obtaining the probability distribution function for project completion time.” Computers and Mathematics with Applications 54(2):282-295.
    • (2007) Computers and Mathematics with Applications , vol.54 , Issue.2 , pp. 282-295
    • Yao, M.1    Chu, W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.