1
-
-
0034745712
-
On computing the distribution function of the sum of independent random variables
-
Agrawal, M. K., and Elmaghraby, S. E. 2001. “On computing the distribution function of the sum of independent random variables.” Computers and Operations Research 28(5):473-483.
-
(2001)
Computers and Operations Research
, vol.28
, Issue.5
, pp. 473-483
-
-
Agrawal, M.K.1
Elmaghraby, S.E.2
-
2
-
-
0034179695
-
Scheduling of multiclass single server queues under nontraditional performance measures
-
Ayhan, H., and Olsen, T. L. 2000. “Scheduling of multiclass single server queues under nontraditional performance measures.” Operations Research 48(3):482-489.
-
(2000)
Operations Research
, vol.48
, Issue.3
, pp. 482-489
-
-
Ayhan, H.1
Olsen, T.L.2
-
4
-
-
0001310038
-
The greatest of a finite set of random variables
-
Clark, C. E. 1961. “The greatest of a finite set of random variables.” Operations Research 9:145-162.
-
(1961)
Operations Research
, vol.9
, pp. 145-162
-
-
Clark, C.E.1
-
6
-
-
0029254356
-
Robust scheduling to hedge against processing time uncertainty in single-stage production
-
Daniels, R. L., and Kouvelis, P. 1995. “Robust scheduling to hedge against processing time uncertainty in single-stage production.” Management Science 41(2):363-376.
-
(1995)
Management Science
, vol.41
, Issue.2
, pp. 363-376
-
-
Daniels, R.L.1
Kouvelis, P.2
-
7
-
-
0031268742
-
β-robust scheduling for single-machine systems with uncertain processing times
-
Daniels, R. L., and Carrillo, J. E. 1997. “β-Robust scheduling for single-machine systems with uncertain processing times.” IIE Transactions 29:977-985.
-
(1997)
IIE Transactions
, vol.29
, pp. 977-985
-
-
Daniels, R.L.1
Carrillo, J.E.2
-
8
-
-
0032628093
-
Conwip-based production lines with multiple bottlenecks: Performance and design implications
-
Dar-el, E. M., Herer, Y. T., and Masin, M. 1999. “CONWIP-based production lines with multiple bottlenecks: Performance and design implications.” IIE Transactions 31:99-111.
-
(1999)
IIE Transactions
, vol.31
, pp. 99-111
-
-
Dar-El, E.M.1
Herer, Y.T.2
Masin, M.3
-
9
-
-
0026980968
-
Expectation-variance analysis of job sequences under processing time uncertainty
-
De, P., Ghosh, J. B., and Wells, C. E. 1992. “Expectation-variance analysis of job sequences under processing time uncertainty.” International Journal of Production Economics 28:289-297.
-
(1992)
International Journal of Production Economics
, vol.28
, pp. 289-297
-
-
De, P.1
Ghosh, J.B.2
Wells, C.E.3
-
10
-
-
0002629270
-
Maximum likelihood from incomplete data via the emalgorithm
-
Dempster, A. P., Laird, N. M., and Rubin, D. B. 1977. “Maximum likelihood from incomplete data via the EMalgorithm.” Journal of the Royal Statistical Society, Series B (Methodological) 39(1):1-38.
-
(1977)
Journal of the Royal Statistical Society, Series B (Methodological)
, vol.39
, Issue.1
, pp. 1-38
-
-
Dempster, A.P.1
Laird, N.M.2
Rubin, D.B.3
-
13
-
-
0021822930
-
Approximating the distribution function in stochastic networks
-
Dodin, B. 1985. “Approximating the distribution function in stochastic networks.” Computers and Operations Research 12(3):251-264.
-
(1985)
Computers and Operations Research
, vol.12
, Issue.3
, pp. 251-264
-
-
Dodin, B.1
-
14
-
-
0030241566
-
Determining the optimal sequences and the distributional properties of the completion times in stochastic flow shops
-
Dodin, B. 1996. “Determining the optimal sequences and the distributional properties of the completion times in stochastic flow shops.” Computers and Operations Research 23:829-843.
-
(1996)
Computers and Operations Research
, vol.23
, pp. 829-843
-
-
Dodin, B.1
-
15
-
-
0027647549
-
Characterizing the output process of a conwip line with deterministic processing and random outages
-
Duenyas, I., Hopp, W. H., and Spearman, M. L. 1993. “Characterizing the output process of a CONWIP line with deterministic processing and random outages.” Management Science 39:975-988.
-
(1993)
Management Science
, vol.39
, pp. 975-988
-
-
Duenyas, I.1
Hopp, W.H.2
Spearman, M.L.3
-
17
-
-
0029206513
-
Bicriteria stochastic scheduling on one or more machines
-
Forst, F. G. 1995. “Bicriteria stochastic scheduling on one or more machines.” European Journal of Operational Research 80:404-409.
-
(1995)
European Journal of Operational Research
, vol.80
, pp. 404-409
-
-
Forst, F.G.1
-
18
-
-
0016510894
-
Surrogate constraint duality in mathematical programming
-
Glover, F. 1975. “Surrogate constraint duality in mathematical programming.” Operations Research 23:434-453.
-
(1975)
Operations Research
, vol.23
, pp. 434-453
-
-
Glover, F.1
-
20
-
-
0000000169
-
The output processes of serial production lines of exponential machines with finite buffers
-
Hendricks, K. B. 1992. “The output processes of serial production lines of exponential machines with finite buffers.” Operations Research 40(6):1139-1147.
-
(1992)
Operations Research
, vol.40
, Issue.6
, pp. 1139-1147
-
-
Hendricks, K.B.1
-
21
-
-
0003075019
-
Optimal two-and three-stage production schedules with setup times included
-
Johnson, S. M. 1954. “Optimal two-and three-stage production schedules with setup times included.” Naval Research Logistics Quarterly 1:61-67.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 61-67
-
-
Johnson, S.M.1
-
22
-
-
28844486630
-
Bicriteria single-stage scheduling to minimize both the expected value and the variance of the total flow time
-
(in Japanese)
-
Jung, Y. S., Nagasawa, H., and Nishiyama, N. 1990. “Bicriteria single-stage scheduling to minimize both the expected value and the variance of the total flow time.” Journal of Japan Industrial Management Association 39:76-82 (in Japanese).
-
(1990)
Journal of Japan Industrial Management Association
, vol.39
, pp. 76-82
-
-
Jung, Y.S.1
Nagasawa, H.2
Nishiyama, N.3
-
23
-
-
0033894477
-
Robust scheduling of a twomachine flow shop with uncertain processing times
-
Kouvelis, P., Daniels, R. L., and Vairaktarakis, G. 2000. “Robust scheduling of a twomachine flow shop with uncertain processing times.” IIE Transactions 32:421-432.
-
(2000)
IIE Transactions
, vol.32
, pp. 421-432
-
-
Kouvelis, P.1
Daniels, R.L.2
Vairaktarakis, G.3
-
25
-
-
0029290455
-
Single-machine stochastic scheduling with dual criteria
-
Lin, C., and Lee, C. 1995. “Single-machine stochastic scheduling with dual criteria.” IIE Transactions 27:244-249.
-
(1995)
IIE Transactions
, vol.27
, pp. 244-249
-
-
Lin, C.1
Lee, C.2
-
26
-
-
0020496895
-
Hybrid algorithm for sequencing with bicriteria
-
Lin, K. S. 1983. “Hybrid algorithm for sequencing with bicriteria.” Journal of Optimization Theory and Applications 39(1):105-124.
-
(1983)
Journal of Optimization Theory and Applications
, vol.39
, Issue.1
, pp. 105-124
-
-
Lin, K.S.1
-
27
-
-
84925687597
-
Multiobjective discounted markov decision processes with expectation and variance criteria
-
Liu, Q., Ohno, K., and Nakayama, H. 1992. “Multiobjective discounted Markov decision processes with expectation and variance criteria.” International Journal of Systems Science 23(6):903-914.
-
(1992)
International Journal of Systems Science
, vol.23
, Issue.6
, pp. 903-914
-
-
Liu, Q.1
Ohno, K.2
Nakayama, H.3
-
28
-
-
0028481114
-
Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants
-
Lu, S. C. H., Ramaswamy, D., and Kumar, P. R. 1994. “Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants.” IEEE Transactions on Semiconductor Manufacturing 7(3):374-385.
-
(1994)
IEEE Transactions on Semiconductor Manufacturing
, vol.7
, Issue.3
, pp. 374-385
-
-
Lu, S.1
Ramaswamy, D.2
Kumar, P.R.3
-
29
-
-
0022746883
-
Resource-constrained assignment scheduling
-
Mazzola, J. B., and Neebe, A. W. 1986. “Resource-constrained assignment scheduling.” Operations Research 34:560-572.
-
(1986)
Operations Research
, vol.34
, pp. 560-572
-
-
Mazzola, J.B.1
Neebe, A.W.2
-
30
-
-
0002748923
-
Job-shop scheduling theory: What is relevant?
-
McKay, K. N., Safayeni, F. R., and Buzacott, J. A. 1988. “Job-shop scheduling theory: What is relevant?” Interfaces 18:84-90.
-
(1988)
Interfaces
, vol.18
, pp. 84-90
-
-
McKay, K.N.1
Safayeni, F.R.2
Buzacott, J.A.3
-
33
-
-
28844485584
-
Aninteractive approach for searching a preferred schedule
-
Morizawa, K., Ono, T., Nagasawa H., and Nishiyama, N. 1993. “Aninteractive approach for searching a preferred schedule.” Journal of Japan Industrial Management Association 39:76-82.
-
(1993)
Journal of Japan Industrial Management Association
, vol.39
, pp. 76-82
-
-
Morizawa, K.1
Ono, T.2
Nagasawa, H.3
Nishiyama, N.4
-
34
-
-
0030241820
-
Multiobjective genetic algorithm and its applications to flowshop scheduling
-
Murata, T., Ishibuchi, H., and Tanaka, H. 1996. “Multiobjective genetic algorithm and its applications to flowshop scheduling.” Computers and Industrial Engineering 30:957-968.
-
(1996)
Computers and Industrial Engineering
, vol.30
, pp. 957-968
-
-
Murata, T.1
Ishibuchi, H.2
Tanaka, H.3
-
35
-
-
84897977009
-
Interactive decision system in parallel-machine stochastic multi-objective scheduling
-
Bangkok, Thailand
-
Nagasawa, H., and Shing, C. 1997. “Interactive decision system in parallel-machine stochastic multi-objective scheduling.” In: Proceedings of the 1st International Conference on Engineering Design and Automation, Bangkok, Thailand, pp. 421-424.
-
(1997)
Proceedings of the 1St International Conference on Engineering Design and Automation
, pp. 421-424
-
-
Nagasawa, H.1
Shing, C.2
-
36
-
-
28844495688
-
Interactive decision system in stochastic multiobjective scheduling to minimize the expected value and variance of total flow time
-
Nagasawa, H., and Shing, C. 1998. “Interactive decision system in stochastic multiobjective scheduling to minimize the expected value and variance of total flow time.” Journal of the Operations Research Society of Japan 41(2):261-278.
-
(1998)
Journal of the Operations Research Society of Japan
, vol.41
, Issue.2
, pp. 261-278
-
-
Nagasawa, H.1
Shing, C.2
-
37
-
-
0022698428
-
Scheduling with multiple performance measures: The one-machine case
-
Nelson, R. T., Sarin, R. K., and Daniels, R. L. 1986. “Scheduling with multiple performance measures: The one-machine case.” Management Science 32(4):464-479.
-
(1986)
Management Science
, vol.32
, Issue.4
, pp. 464-479
-
-
Nelson, R.T.1
Sarin, R.K.2
Daniels, R.L.3
-
39
-
-
0032204349
-
Makespan related criteria for comparing schedules in stochastic environments
-
Portougal, V., and Trietsch, D. 1998. “Makespan related criteria for comparing schedules in stochastic environments.” The Journal of the Operational Research Society. 49(11):1188-1195.
-
(1998)
The Journal of the Operational Research Society
, vol.49
, Issue.11
, pp. 1188-1195
-
-
Portougal, V.1
Trietsch, D.2
-
40
-
-
0029635352
-
Heuristics for scheduling in flowshop with multiple objectives
-
Rajendran, C. 1995. “Heuristics for scheduling in flowshop with multiple objectives.” European Journal of Operational Research 82:540-555.
-
(1995)
European Journal of Operational Research
, vol.82
, pp. 540-555
-
-
Rajendran, C.1
-
44
-
-
4344713001
-
Equal processing time bicriteria scheduling on parallel machines
-
Sarin, S. C., and Prakash, D. 2004. “Equal processing time bicriteria scheduling on parallel machines.” Journal of Combinatorial Optimization 8:227-240.
-
(2004)
Journal of Combinatorial Optimization
, vol.8
, pp. 227-240
-
-
Sarin, S.C.1
Prakash, D.2
-
47
-
-
0030315228
-
Interactive decision support system in stochastic multi-objective scheduling
-
Shing, C., and Nagasawa, H. 1997. “Interactive decision support system in stochastic multi-objective scheduling.” Bulletin of Osaka Prefecture University, Series A, 45(2):133-142.
-
(1997)
Bulletin of Osaka Prefecture University, Series A
, vol.45
, Issue.2
, pp. 133-142
-
-
Shing, C.1
Nagasawa, H.2
-
48
-
-
0032678388
-
Interactive decision support system in stochastic multi-objective portfolio selection
-
Shing, C., and Nagasawa, H. 1999. “Interactive decision support system in stochastic multi-objective portfolio selection.” International Journal of Production Economics 60-61:187-193.
-
(1999)
International Journal of Production Economics
, vol.60-61
, pp. 187-193
-
-
Shing, C.1
Nagasawa, H.2
-
49
-
-
0017629555
-
Bounding distributions for a stochastic pert network
-
Shogan, A. 1977. “Bounding distributions for a stochastic PERT network.” Networks 7(4):359-381.
-
(1977)
Networks
, vol.7
, Issue.4
, pp. 359-381
-
-
Shogan, A.1
-
50
-
-
0026119502
-
Throughput of a constant work in process manufacturing line subject to failures
-
Spearman, M. L., and Hopp, W. H. 1991. “Throughput of a constant work in process manufacturing line subject to failures.” International Journal of Production Research 29:635-655.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 635-655
-
-
Spearman, M.L.1
Hopp, W.H.2
-
51
-
-
0025430443
-
Conwip:Apull alternative to kanban
-
Spearman, M. L., Woodruff, D. L., and Hopp, W.H. 1980. “CONWIP:Apull alternative to kanban.” International Journal of Production Research 28(5):879-894.
-
(1980)
International Journal of Production Research
, vol.28
, Issue.5
, pp. 879-894
-
-
Spearman, M.L.1
Woodruff, D.L.2
Hopp, W.H.3
-
52
-
-
0028517492
-
The most critical path in apertnetwork:Aheuristic approach
-
Soroush, H. M. 1994. “The most critical path in aPERTnetwork:Aheuristic approach.” European Journal of Operational Research 78(1):93-105.
-
(1994)
European Journal of Operational Research
, vol.78
, Issue.1
, pp. 93-105
-
-
Soroush, H.M.1
-
53
-
-
0028768513
-
The stochastic single machine scheduling problem with earliness and tardiness costs
-
Soroush, H. M., and Fredenhall, L. D. 1984. “The stochastic single machine scheduling problem with earliness and tardiness costs.” European Journal of Operational Research 77:187-302.
-
(1984)
European Journal of Operational Research
, vol.77
, pp. 187-302
-
-
Soroush, H.M.1
Fredenhall, L.D.2
-
54
-
-
0011717266
-
Determination of part-delivery dates in a small lot stochastic assembly system
-
Srivastava, R. K., and Sarin, S. C. 1993. “Determination of part-delivery dates in a small lot stochastic assembly system.” Opsearch 30(4):281-312.
-
(1993)
Opsearch
, vol.30
, Issue.4
, pp. 281-312
-
-
Srivastava, R.K.1
Sarin, S.C.2
-
55
-
-
0031220337
-
Variance of the throughput of an n-station production line with no intermediate buffers and time dependent failures
-
Tan, B. 1997. “Variance of the throughput of an n-station production line with no intermediate buffers and time dependent failures.” European Journal of Operational Research 101:560-576.
-
(1997)
European Journal of Operational Research
, vol.101
, pp. 560-576
-
-
Tan, B.1
-
56
-
-
0034397419
-
Asymptotic variance rate of the output in production lines with finite buffers
-
Tan, B. 2000. “Asymptotic variance rate of the output in production lines with finite buffers.” Annals of Operations Research 93:385-403.
-
(2000)
Annals of Operations Research
, vol.93
, pp. 385-403
-
-
Tan, B.1
-
58
-
-
0000073296
-
Rates of convergence for the maximum likelihood estimator in mixture models
-
van de Geer, S. A. 1996. “Rates of convergence for the maximum likelihood estimator in mixture models.” Journal Nonparametric Statistics 6:293-310.
-
(1996)
Journal Nonparametric Statistics
, vol.6
, pp. 293-310
-
-
Van De Geer, S.A.1
-
59
-
-
0037469106
-
Asymptotic theory for maximum likelihood in nonparametric mixture models
-
van de Geer, S. A. 2004. “Asymptotic theory for maximum likelihood in nonparametric mixture models.” Computational Statistics & Data Analysis 41:453-464.
-
(2004)
Computational Statistics & Data Analysis
, vol.41
, pp. 453-464
-
-
Van De Geer, S.A.1
-
60
-
-
27944444072
-
Multivariate normal distribution based statistical timing analysis using global projection and local expansion
-
Wang, B., and Mazumder, P. 2005. “Multivariate normal distribution based statistical timing analysis using global projection and local expansion.” In: Proceedings of the 18th International Conference on VLSI Design, pp. 380-385.
-
(2005)
Proceedings of the 18Th International Conference on VLSI Design
, pp. 380-385
-
-
Wang, B.1
Mazumder, P.2
-
62
-
-
0022482238
-
A model to approximate transient performance of the flowshop
-
Wilhelm, W. E. 1986. “A model to approximate transient performance of the flowshop.” International Journal of Production Research 24(1):33-50.
-
(1986)
International Journal of Production Research
, vol.24
, Issue.1
, pp. 33-50
-
-
Wilhelm, W.E.1
-
63
-
-
0022920547
-
The application of lognormal models of transient operations in the flexible manufacturing environment
-
Wilhelm, W. E. 1986. “The application of lognormal models of transient operations in the flexible manufacturing environment.” Journal of Manufacturing Systems 5(4): 253-266.
-
(1986)
Journal of Manufacturing Systems
, vol.5
, Issue.4
, pp. 253-266
-
-
Wilhelm, W.E.1
-
64
-
-
0020178127
-
A methodology to describe operating characteristics of assembly systems
-
Wilhelm, W. E., and Ahmadi-Marandi, S. 1982. “A methodology to describe operating characteristics of assembly systems.” IIE Transactions 14(3):204-214.
-
(1982)
IIE Transactions
, vol.14
, Issue.3
, pp. 204-214
-
-
Wilhelm, W.E.1
Ahmadi-Marandi, S.2
-
66
-
-
0002210265
-
On the convergence properties of the em algorithm
-
Wu, C. F. J. 1983. “On the convergence properties of the EM algorithm.” Annals of Statistics 11:55-103.
-
(1983)
Annals of Statistics
, vol.11
, pp. 55-103
-
-
Wu, C.1
-
67
-
-
0036498099
-
On the robust single machine scheduling problem
-
Yang, J., and Yu, G. 2002. “On the robust single machine scheduling problem.” Journal of Combinatorial Optimization 6:17-33.
-
(2002)
Journal of Combinatorial Optimization
, vol.6
, pp. 17-33
-
-
Yang, J.1
Yu, G.2
-
68
-
-
34249865056
-
A new approximation algorithm for obtaining the probability distribution function for project completion time
-
Yao, M., and Chu, W. 2007. “A new approximation algorithm for obtaining the probability distribution function for project completion time.” Computers and Mathematics with Applications 54(2):282-295.
-
(2007)
Computers and Mathematics with Applications
, vol.54
, Issue.2
, pp. 282-295
-
-
Yao, M.1
Chu, W.2
|