-
2
-
-
0025474221
-
A State-of-the-Art Review of Parallel-Machine Scheduling Research
-
T. C. E. Cheng and C. C. S. Sin: A State-of-the-Art Review of Parallel-Machine Scheduling Research. European Journal of Operational Research, 47(1990) 271-292.
-
(1990)
European Journal of Operational Research
, vol.47
, pp. 271-292
-
-
Cheng, T.C.E.1
Sin, C.C.S.2
-
4
-
-
0029206513
-
Bicriterion Stochastic Scheduling on One or More Machines
-
F. G. Forst: Bicriterion Stochastic Scheduling on One or More Machines. European Journal of Operational Research, 80(1995) 404-409.
-
(1995)
European Journal of Operational Research
, vol.80
, pp. 404-409
-
-
Forst, F.G.1
-
5
-
-
0029343603
-
Minimizing the Number of Tardy Jobs for m Parallel Machines
-
J. C. Ho and Y. Chang: Minimizing the Number of Tardy Jobs for m Parallel Machines. European Journal of Operational Research, 84(1995) 343-355.
-
(1995)
European Journal of Operational Research
, vol.84
, pp. 343-355
-
-
Ho, J.C.1
Chang, Y.2
-
6
-
-
0018976963
-
On the Interactive Solution to a Multicriteria Scheduling Problem
-
K. Huckert and R. O. Roglin: On the Interactive Solution to a Multicriteria Scheduling Problem. Zeitshrift für Operations Research, 24(1980) 47-60.
-
(1980)
Zeitshrift für Operations Research
, vol.24
, pp. 47-60
-
-
Huckert, K.1
Roglin, R.O.2
-
7
-
-
0029638856
-
Single Machine Scheduling Problem with Fuzzy Precedence Relation
-
H. Ishii and M. Tada: Single Machine Scheduling Problem with Fuzzy Precedence Relation. European Journal of Operational Research, 87(1995) 284-288.
-
(1995)
European Journal of Operational Research
, vol.87
, pp. 284-288
-
-
Ishii, H.1
Tada, M.2
-
8
-
-
0029327050
-
A New Approach to Stochastic Programming Problems: Discrete Model
-
R. R. Joshi: A New Approach to Stochastic Programming Problems: Discrete Model. European Journal of Operational Research, 83(1995) 514-529.
-
(1995)
European Journal of Operational Research
, vol.83
, pp. 514-529
-
-
Joshi, R.R.1
-
9
-
-
28844486630
-
Bicriterion Single-Stage Scheduling to Minimize Both the Expected Value and the Variance of Total Flow Time
-
in Japanese
-
Y. S. Jung, H. Nagasawa and N. Nishiyama: Bicriterion Single-Stage Scheduling to Minimize Both the Expected Value and the Variance of Total Flow Time. Journal of Japan Industrial Management Association, 39(1990) 76-82, in Japanese.
-
(1990)
Journal of Japan Industrial Management Association
, vol.39
, pp. 76-82
-
-
Jung, Y.S.1
Nagasawa, H.2
Nishiyama, N.3
-
12
-
-
28844485584
-
An Interactive Approach for searching a Preferred schedule
-
in Japanese
-
K. Morizawa, T. Ono, H. Nagasawa and N. Nishiyama: An Interactive Approach for searching a Preferred schedule. Journal of Japan Industrial Management Association, 39(1993) 76-82, in Japanese.
-
(1993)
Journal of Japan Industrial Management Association
, vol.39
, pp. 76-82
-
-
Morizawa, K.1
Ono, T.2
Nagasawa, H.3
Nishiyama, N.4
-
13
-
-
0030241820
-
Multiobjective Genetic Algorithm and Its Applications to Flowshop Scheduling
-
T. Murata, H. Ishibuchi and H. Tanaka: Multiobjective Genetic Algorithm and Its Applications to Flowshop Scheduling. Computers industrial Engineering, 30(1996) 957-968.
-
(1996)
Computers Industrial Engineering
, vol.30
, pp. 957-968
-
-
Murata, T.1
Ishibuchi, H.2
Tanaka, H.3
-
14
-
-
0022698428
-
Scheduling with Multiple Performance Measures; One Machine Case
-
R. T. Nelson, R. K. Sarin and R. L. Daniels: Scheduling with Multiple Performance Measures; One Machine Case. Management Science, 32(1986) 464-479.
-
(1986)
Management Science
, vol.32
, pp. 464-479
-
-
Nelson, R.T.1
Sarin, R.K.2
Daniels, R.L.3
-
16
-
-
0026923562
-
Two-Stage Flowshop Scheduling Problem with Bicriteria
-
C. Rajendran: Two-Stage Flowshop Scheduling Problem with Bicriteria. Journal of Operations Research Society, 43(1992) 871-884.
-
(1992)
Journal of Operations Research Society
, vol.43
, pp. 871-884
-
-
Rajendran, C.1
-
17
-
-
0029635352
-
Heuristics for Scheduling in Flowshop with Multiple Objectives
-
C. Rajendran: Heuristics for Scheduling in Flowshop with Multiple Objectives. European Journal of Operational Research, 82(1995) 540-555.
-
(1995)
European Journal of Operational Research
, vol.82
, pp. 540-555
-
-
Rajendran, C.1
-
18
-
-
0001360524
-
A Branch-and-Bound Approach to the Bicriterion Scheduling Problem involving Flow Time and Range of Lateness
-
T. Sen, F. M. E. Raiszadeh and P. Dileepan: A Branch-and-Bound Approach to the Bicriterion Scheduling Problem involving Flow Time and Range of Lateness. Management Science, 34(1988) 254-260.
-
(1988)
Management Science
, vol.34
, pp. 254-260
-
-
Sen, T.1
Raiszadeh, F.M.E.2
Dileepan, P.3
-
19
-
-
0002066821
-
Narious Optimizers for single Stage Production
-
W. E. Smith: Narious Optimizers for single Stage Production. Naval Research Logistic Quarterly, 3(1956) 59-66.
-
(1956)
Naval Research Logistic Quarterly
, vol.3
, pp. 59-66
-
-
Smith, W.E.1
|