메뉴 건너뛰기




Volumn 41, Issue 2, 1998, Pages 276-278

Interactive decision system in stochastic multiobjective scheduling to minimize the expected value and variance of total flow time

Author keywords

[No Author keywords available]

Indexed keywords


EID: 28844495688     PISSN: 04534514     EISSN: None     Source Type: Journal    
DOI: 10.15807/jorsj.41.261     Document Type: Article
Times cited : (2)

References (20)
  • 2
    • 0025474221 scopus 로고
    • A State-of-the-Art Review of Parallel-Machine Scheduling Research
    • T. C. E. Cheng and C. C. S. Sin: A State-of-the-Art Review of Parallel-Machine Scheduling Research. European Journal of Operational Research, 47(1990) 271-292.
    • (1990) European Journal of Operational Research , vol.47 , pp. 271-292
    • Cheng, T.C.E.1    Sin, C.C.S.2
  • 4
    • 0029206513 scopus 로고
    • Bicriterion Stochastic Scheduling on One or More Machines
    • F. G. Forst: Bicriterion Stochastic Scheduling on One or More Machines. European Journal of Operational Research, 80(1995) 404-409.
    • (1995) European Journal of Operational Research , vol.80 , pp. 404-409
    • Forst, F.G.1
  • 5
    • 0029343603 scopus 로고
    • Minimizing the Number of Tardy Jobs for m Parallel Machines
    • J. C. Ho and Y. Chang: Minimizing the Number of Tardy Jobs for m Parallel Machines. European Journal of Operational Research, 84(1995) 343-355.
    • (1995) European Journal of Operational Research , vol.84 , pp. 343-355
    • Ho, J.C.1    Chang, Y.2
  • 6
    • 0018976963 scopus 로고
    • On the Interactive Solution to a Multicriteria Scheduling Problem
    • K. Huckert and R. O. Roglin: On the Interactive Solution to a Multicriteria Scheduling Problem. Zeitshrift für Operations Research, 24(1980) 47-60.
    • (1980) Zeitshrift für Operations Research , vol.24 , pp. 47-60
    • Huckert, K.1    Roglin, R.O.2
  • 7
    • 0029638856 scopus 로고
    • Single Machine Scheduling Problem with Fuzzy Precedence Relation
    • H. Ishii and M. Tada: Single Machine Scheduling Problem with Fuzzy Precedence Relation. European Journal of Operational Research, 87(1995) 284-288.
    • (1995) European Journal of Operational Research , vol.87 , pp. 284-288
    • Ishii, H.1    Tada, M.2
  • 8
    • 0029327050 scopus 로고
    • A New Approach to Stochastic Programming Problems: Discrete Model
    • R. R. Joshi: A New Approach to Stochastic Programming Problems: Discrete Model. European Journal of Operational Research, 83(1995) 514-529.
    • (1995) European Journal of Operational Research , vol.83 , pp. 514-529
    • Joshi, R.R.1
  • 9
    • 28844486630 scopus 로고
    • Bicriterion Single-Stage Scheduling to Minimize Both the Expected Value and the Variance of Total Flow Time
    • in Japanese
    • Y. S. Jung, H. Nagasawa and N. Nishiyama: Bicriterion Single-Stage Scheduling to Minimize Both the Expected Value and the Variance of Total Flow Time. Journal of Japan Industrial Management Association, 39(1990) 76-82, in Japanese.
    • (1990) Journal of Japan Industrial Management Association , vol.39 , pp. 76-82
    • Jung, Y.S.1    Nagasawa, H.2    Nishiyama, N.3
  • 13
    • 0030241820 scopus 로고    scopus 로고
    • Multiobjective Genetic Algorithm and Its Applications to Flowshop Scheduling
    • T. Murata, H. Ishibuchi and H. Tanaka: Multiobjective Genetic Algorithm and Its Applications to Flowshop Scheduling. Computers industrial Engineering, 30(1996) 957-968.
    • (1996) Computers Industrial Engineering , vol.30 , pp. 957-968
    • Murata, T.1    Ishibuchi, H.2    Tanaka, H.3
  • 14
    • 0022698428 scopus 로고
    • Scheduling with Multiple Performance Measures; One Machine Case
    • R. T. Nelson, R. K. Sarin and R. L. Daniels: Scheduling with Multiple Performance Measures; One Machine Case. Management Science, 32(1986) 464-479.
    • (1986) Management Science , vol.32 , pp. 464-479
    • Nelson, R.T.1    Sarin, R.K.2    Daniels, R.L.3
  • 16
    • 0026923562 scopus 로고
    • Two-Stage Flowshop Scheduling Problem with Bicriteria
    • C. Rajendran: Two-Stage Flowshop Scheduling Problem with Bicriteria. Journal of Operations Research Society, 43(1992) 871-884.
    • (1992) Journal of Operations Research Society , vol.43 , pp. 871-884
    • Rajendran, C.1
  • 17
    • 0029635352 scopus 로고
    • Heuristics for Scheduling in Flowshop with Multiple Objectives
    • C. Rajendran: Heuristics for Scheduling in Flowshop with Multiple Objectives. European Journal of Operational Research, 82(1995) 540-555.
    • (1995) European Journal of Operational Research , vol.82 , pp. 540-555
    • Rajendran, C.1
  • 18
    • 0001360524 scopus 로고
    • A Branch-and-Bound Approach to the Bicriterion Scheduling Problem involving Flow Time and Range of Lateness
    • T. Sen, F. M. E. Raiszadeh and P. Dileepan: A Branch-and-Bound Approach to the Bicriterion Scheduling Problem involving Flow Time and Range of Lateness. Management Science, 34(1988) 254-260.
    • (1988) Management Science , vol.34 , pp. 254-260
    • Sen, T.1    Raiszadeh, F.M.E.2    Dileepan, P.3
  • 19
    • 0002066821 scopus 로고
    • Narious Optimizers for single Stage Production
    • W. E. Smith: Narious Optimizers for single Stage Production. Naval Research Logistic Quarterly, 3(1956) 59-66.
    • (1956) Naval Research Logistic Quarterly , vol.3 , pp. 59-66
    • Smith, W.E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.