Makespan-related criteria for comparing schedules in stochastic environments

Author keywords

Scheduling; Stochastic schedules

Indexed keywords

COMPUTATIONAL COMPLEXITY; MATHEMATICAL MODELS; PROCESS CONTROL; RANDOM PROCESSES; SCHEDULING; STATISTICAL METHODS; STRATEGIC PLANNING;

EID: 0032204349     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2600639     Document Type: Article
Times cited : (17)

References (8)
  • 2
    • 0002748923 scopus 로고
    • Job-shop scheduling theory: What is relevant?
    • McKay KN, Safayeni FR and Buzacott JA (1988). Job-shop scheduling theory: What is relevant? Interfaces 18: 84-90.
    • (1988) Interfaces , vol.18 , pp. 84-90
    • McKay, K.N.1    Safayeni, F.R.2    Buzacott, J.A.3
  • 3
    • 0022099676 scopus 로고
    • Bounding the project completion time distribution in PERT Networks
    • Dodin B (1985). Bounding the project completion time distribution in PERT Networks, Opns Res 33: 862-881.
    • (1985) Opns Res , vol.33 , pp. 862-881
    • Dodin, B.1
  • 4
    • 0030241566 scopus 로고    scopus 로고
    • Determining the optimal sequences and the distributional properties of their completion times in stochastic flow shops
    • Dodin B (1996). Determining the optimal sequences and the distributional properties of their completion times in stochastic flow shops. Computers Ops Res 23: 829-843.
    • (1996) Computers Ops Res , vol.23 , pp. 829-843
    • Dodin, B.1
  • 6
    • 84986938726 scopus 로고
    • Production control of cyclic schedules with demand and process variability
    • Bowman RA and Muckstadt JA (1995). Production control of cyclic schedules with demand and process variability, Prod Opns Mgm 4: 145-162.
    • (1995) Prod Opns Mgm , vol.4 , pp. 145-162
    • Bowman, R.A.1    Muckstadt, J.A.2
  • 7
    • 0023170104 scopus 로고
    • Deterministic and random single machine sequencing with variance minimisation
    • Vani V and Raghavachari M (1987). Deterministic and random single machine sequencing with variance minimisation, Opns Res 35: 111-126.
    • (1987) Opns Res , vol.35 , pp. 111-126
    • Vani, V.1    Raghavachari, M.2
  • 8
    • 0028768513 scopus 로고
    • The Stochastic Single Machine Scheduling Problem with Earliness and Tardiness Costs
    • Soroush HM and Fredendall LD (1984). The Stochastic Single Machine Scheduling Problem with Earliness and Tardiness Costs. Eur J Op Res 77: 187-302.
    • (1984) Eur J Op Res , vol.77 , pp. 187-302
    • Soroush, H.M.1    Fredendall, L.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.