메뉴 건너뛰기




Volumn 52, Issue 24, 2014, Pages 7496-7512

Partial disassembly sequencing considering acquired end-of-life product age distributions

Author keywords

disassembly sequencing; end of life; partial disassembly

Indexed keywords

QUALITY CONTROL; STATISTICS;

EID: 84911986530     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2014.939237     Document Type: Article
Times cited : (50)

References (28)
  • 6
    • 34547662257 scopus 로고    scopus 로고
    • Disassembly planning of mechanical systems for service and recovery: A genetic algorithms based approach
    • Giudice, F., and G. Fargione. 2007. " Disassembly Planning of Mechanical Systems for Service and Recovery: A Genetic Algorithms Based Approach. " Journal of Intelligent Manufacturing 18 (3): 313-329.
    • (2007) Journal of Intelligent Manufacturing , vol.18 , Issue.3 , pp. 313-329
    • Giudice, F.1    Fargione, G.2
  • 7
    • 0034634819 scopus 로고    scopus 로고
    • Product acquisition management: Current industry practice and a proposed framework
    • Guide Jr V. D., and V. Jayaraman. 2000 Product Acquisition Management: Current Industry Practice and a Proposed Framework. " International Journal of Production Research 38 16 3779-3800.
    • (2000) International Journal of Production Research , vol.38 , Issue.16 , pp. 3779-3800
    • Guide, V.D.1    Jayaraman, V.2
  • 10
    • 72149096791 scopus 로고    scopus 로고
    • Environmentally conscious manufacturing and product recovery (ecmpro): A review of the state of the art
    • Ilgin, M. A., and S. M. Gupta. 2010. " Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): A Review of the State of the Art. " Journal of Environmental Management 91 (3): 563-591.
    • (2010) Journal of Environmental Management , vol.91 , Issue.3 , pp. 563-591
    • Ilgin, M.A.1    Gupta, S.M.2
  • 11
    • 28944452430 scopus 로고    scopus 로고
    • Heuristics for solving disassemble-To-order problems with stochastic yields
    • Inderfurth, K., and I. M. Langella. 2006. " Heuristics for Solving Disassemble-To-order Problems with Stochastic Yields. " OR Spectrum 28 (1): 73-99.
    • (2006) OR Spectrum , vol.28 , Issue.1 , pp. 73-99
    • Inderfurth, K.1    Langella, I.M.2
  • 15
    • 0001754245 scopus 로고    scopus 로고
    • Optimal disassembly configurations for single and multiple products
    • Meacham, A., R. Uzsoy, and U. Venkatadri. 1999. " Optimal Disassembly Configurations for Single and Multiple Products. " Journal of Manufacturing Systems 18 (5): 311-322.
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.5 , pp. 311-322
    • Meacham, A.1    Uzsoy, R.2    Venkatadri, U.3
  • 17
    • 84884314801 scopus 로고    scopus 로고
    • Preliminary evaluation of artificial bee colony algorithm when applied to multi-objective partial disassembly planning
    • Percoco, G., and M. Diella. 2013. " Preliminary Evaluation of Artificial Bee Colony Algorithm When Applied to Multi-objective Partial Disassembly Planning. " Research Journal of Applied Sciences, Engineering and Technology 6 (17): 3234-3243.
    • (2013) Research Journal of Applied Sciences, Engineering and Technology 6 , vol.17 , pp. 3234-3243
    • Percoco, G.1    Diella, M.2
  • 18
    • 33947652668 scopus 로고    scopus 로고
    • Uncertainty management in optimal disassembly planning through learning-based strategies
    • Reveliotis, S. A. 2007. " Uncertainty Management in Optimal Disassembly Planning through Learning-based Strategies. " IIE Transactions 39 (6): 645-658.
    • (2007) IIE Transactions , vol.39 , Issue.6 , pp. 645-658
    • Reveliotis, S.A.1
  • 19
    • 84911984779 scopus 로고    scopus 로고
    • Multi-objective partial disassembly optimization based on sequence feasibility
    • Rickli, J. L., and J. A. Camelio. 2013. " Multi-objective Partial Disassembly Optimization Based on Sequence Feasibility. " Journal of Manufacturing Systems 32 (1): 281-293.
    • (2013) Journal of Manufacturing Systems , vol.32 , Issue.1 , pp. 281-293
    • Rickli, J.L.1    Camelio, J.A.2
  • 20
    • 1642269093 scopus 로고    scopus 로고
    • Closed-loop supply chain models with product remanufacturing
    • Savaskan, R. C., S. Bhattacharya, and L. N. Van Wassenhove. 2004. " Closed-loop Supply Chain Models with Product Remanufacturing. " Management Science 50 (2): 239-252.
    • (2004) Management Science , vol.50 , Issue.2 , pp. 239-252
    • Savaskan, R.C.1    Bhattacharya, S.2    Van Wassenhove, L.N.3
  • 21
    • 0034808349 scopus 로고    scopus 로고
    • Optimal disassembly sequence using genetic algorithms considering economic and environmental aspects
    • Seo, K.-K., J.-H. Park, and D.-S. Jang. 2001. " Optimal Disassembly Sequence Using Genetic Algorithms Considering Economic and Environmental Aspects. " The International Journal of Advanced Manufacturing Technology 18 (5): 371-380.
    • (2001) The International Journal of Advanced Manufacturing Technology , vol.18 , Issue.5 , pp. 371-380
    • Seo, K.-K.1    Park, J.-H.2    Jang, D.-S.3
  • 23
    • 78650414341 scopus 로고    scopus 로고
    • Optimal core acquisition and remanufacturing policies under uncertain core quality fractions
    • Teunter, R. H., and S. D. P. Flapper. 2011. " Optimal Core Acquisition and Remanufacturing Policies under Uncertain Core Quality Fractions. " European Journal of Operational Research 210 (2): 241-248.
    • (2011) European Journal of Operational Research , vol.210 , Issue.2 , pp. 241-248
    • Teunter, R.H.1    Flapper, S.D.P.2
  • 24
    • 84862118118 scopus 로고    scopus 로고
    • Evaluation model and algorithm of product disassembly process with stochastic feature
    • Tian, G., Y. Liu, Q. Tian, and J. Chu. 2011. " Evaluation Model and Algorithm of Product Disassembly Process with Stochastic Feature. " Clean Technologies and Environmental Policy 14 (2): 345-356.
    • (2011) Clean Technologies and Environmental Policy , vol.14 , Issue.2 , pp. 345-356
    • Tian, G.1    Liu, Y.2    Tian, Q.3    Chu, J.4
  • 25
    • 61349137696 scopus 로고    scopus 로고
    • Real world disassembly modeling and sequencing problem: Optimization by algorithm of self-guided ants (asga)
    • Tripathi, M., S. Agrawal, M. K. Pandey, R. Shankar, and M. K. Tiwari. 2009. " Real World Disassembly Modeling and Sequencing Problem: Optimization by Algorithm of Self-guided Ants (ASGA). " Robotics and Computer Integrated Manufacturing 25 (3): 483-496.
    • (2009) Robotics and Computer Integrated Manufacturing , vol.25 , Issue.3 , pp. 483-496
    • Tripathi, M.1    Agrawal, S.2    Pandey, M.K.3    Shankar, R.4    Tiwari, M.K.5
  • 26
    • 84885657218 scopus 로고    scopus 로고
    • Flexible disassembly planning considering product conditions
    • Ullerich, C., and Udo Buscher. 2013. " Flexible Disassembly Planning Considering Product Conditions. " International Journal of Production Research 51 (20): 6209-6228.
    • (2013) International Journal of Production Research , vol.51 , Issue.20 , pp. 6209-6228
    • Ullerich, C.1    Buscher, U.2
  • 27
    • 84885655160 scopus 로고    scopus 로고
    • Disassembly planning and sequencing for end-of-life products with rfid enriched information
    • Wan, H., and V. K. Krishna Gonnuru. 2013. " Disassembly Planning and Sequencing for End-of-life Products with RFID Enriched Information. " Robotics and Computer Integrated Manufacturing 29 (3): 112-118.
    • (2013) Robotics and Computer Integrated Manufacturing , vol.29 , Issue.3 , pp. 112-118
    • Wan, H.1    Krishna Gonnuru, V.K.2
  • 28
    • 84874295596 scopus 로고    scopus 로고
    • Intelligent disassembly planning: A review on its fundamental methodology
    • Wang, H., D. Xiang, Y. Rong, and L. Zhang. 2013. " Intelligent Disassembly Planning: A Review on Its Fundamental Methodology. " Assembly Automation 33 (1): 78-85.
    • (2013) Assembly Automation , vol.33 , Issue.1 , pp. 78-85
    • Wang, H.1    Xiang, D.2    Rong, Y.3    Zhang, L.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.