메뉴 건너뛰기




Volumn 52, Issue 19, 2014, Pages 5764-5779

A scheduling model for systems with task and health dependent remaining useful life prognostics

Author keywords

inspection; maintenance; prognostics; remaining useful life; scheduling

Indexed keywords

INSPECTION; MAINTENANCE; PROFITABILITY; SYSTEMS ENGINEERING;

EID: 84906789063     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2014.910629     Document Type: Article
Times cited : (5)

References (33)
  • 1
    • 60749128979 scopus 로고    scopus 로고
    • Single machine scheduling with preventive maintenances
    • Batun, S., and, M. Azizoǧlu. 2009. " Single Machine Scheduling with Preventive Maintenances." International Journal of Production Research 47 (7): 1753-1771
    • (2009) International Journal of Production Research , vol.47 , Issue.7 , pp. 1753-1771
    • Batun, S.1    Azizoǧlu, M.2
  • 2
    • 84859059479 scopus 로고    scopus 로고
    • Reassessing tradeoffs inherent to simultaneous maintenance and production planning
    • Batun, S., and, L. M. Maillart. 2012. " Reassessing Tradeoffs Inherent to Simultaneous Maintenance and Production Planning." Production and Operations Management 21 (2): 396-403
    • (2012) Production and Operations Management , vol.21 , Issue.2 , pp. 396-403
    • Batun, S.1    Maillart, L.M.2
  • 3
    • 0345201636 scopus 로고    scopus 로고
    • Single-machine scheduling with learning considerations
    • Biskup, D. 1999. " Single-machine Scheduling with Learning Considerations." European Journal of Operational Research 115: 173-178
    • (1999) European Journal of Operational Research , vol.115 , pp. 173-178
    • Biskup, D.1
  • 5
    • 22444439337 scopus 로고    scopus 로고
    • Integrating preventive maintenance planning and production scheduling for a single machine
    • Cassady, C. R., and, E. Kutanoglu. 2005. " Integrating Preventive Maintenance Planning and Production Scheduling for a Single Machine." IEEE Transactions on Reliability 54 (2): 304-309
    • (2005) IEEE Transactions on Reliability , vol.54 , Issue.2 , pp. 304-309
    • Cassady, C.R.1    Kutanoglu, E.2
  • 6
    • 84882449514 scopus 로고    scopus 로고
    • Maintenance schedule optimisation for a railway power supply system
    • Chen, S., T. Ho, and, B. Mao. 2013. " Maintenance Schedule Optimisation for a Railway Power Supply System." International Journal of Production Research 51 (16): 4896-4910
    • (2013) International Journal of Production Research , vol.51 , Issue.16 , pp. 4896-4910
    • Chen, S.1    Ho, T.2    Mao, B.3
  • 9
    • 0035401340 scopus 로고    scopus 로고
    • The robustness of the semi-markov and delay time single-component inspection models to the markov assumption
    • Christer, A. H., W. Wang, K. Choi, and, F. A. Schouten. 2001. " The Robustness of the Semi-Markov and Delay Time Single-component Inspection Models to the Markov Assumption." IMA Journal of Management Mathematics 12: 75-88
    • (2001) IMA Journal of Management Mathematics , vol.12 , pp. 75-88
    • Christer, A.H.1    Wang, W.2    Choi, K.3    Schouten, F.A.4
  • 10
    • 77953157188 scopus 로고    scopus 로고
    • Preventive replacement models: An overview and their application in Process industries
    • Das, A. N., and, S. P. Sarmah. 2010. " Preventive Replacement Models: An Overview and Their Application in Process Industries." European J. of Industrial Engineering 4 (3): 280-307
    • (2010) European J. of Industrial Engineering , vol.4 , Issue.3 , pp. 280-307
    • Das, A.N.1    Sarmah, S.P.2
  • 11
    • 84861413180 scopus 로고    scopus 로고
    • Guidelines for the deployment and implementation of manufacturing scheduling systems
    • Framinan, J. M., and, R. Ruiz. 2012. " Guidelines for the Deployment and Implementation of Manufacturing Scheduling Systems." International Journal of Production Research 50 (7): 1799-1812
    • (2012) International Journal of Production Research , vol.50 , Issue.7 , pp. 1799-1812
    • Framinan, J.M.1    Ruiz, R.2
  • 13
    • 51849129175 scopus 로고    scopus 로고
    • Single machine scheduling models with deterioration and learning: Handling precedence constraints via priority generation
    • Gordon, V. S., C. N. Potts, V. A. Strusevich, and, J. D. Whitehead. 2008. " Single Machine Scheduling Models with Deterioration and Learning: Handling Precedence Constraints via priority Generation." Journal of Scheduling 11: 357-370
    • (2008) Journal of Scheduling , vol.11 , pp. 357-370
    • Gordon, V.S.1    Potts, C.N.2    Strusevich, V.A.3    Whitehead, J.D.4
  • 14
    • 77953872383 scopus 로고    scopus 로고
    • A survey of variants and extensions of the resource-constrained project scheduling problem
    • Hartmann, S., and, D. Briskorn. 2010. " A Survey of Variants and Extensions of the Resource-constrained Project Scheduling Problem." European Journal of Operational Research 207: 1-14
    • (2010) European Journal of Operational Research , vol.207 , pp. 1-14
    • Hartmann, S.1    Briskorn, D.2
  • 15
    • 84884973541 scopus 로고    scopus 로고
    • Reliability of manufacturing equipment in complex environments
    • Kharoufeh, J. P., S. M. Cox, and, M. E. Oxley. 2013. " Reliability of Manufacturing Equipment in Complex Environments." Annals of Operations Research 209: 231-254.
    • (2013) Annals of Operations Research , vol.209 , pp. 231-254
    • Kharoufeh, J.P.1    Cox, S.M.2    Oxley, M.E.3
  • 16
    • 7544243413 scopus 로고    scopus 로고
    • Evaluating failure time probabilities for a markovian wear process
    • Kharoufeh, J. P., and, J. A. Sipe. 2005. " Evaluating Failure Time Probabilities for a Markovian Wear Process." Computers & Operations Research 32 (5): 1131-1145
    • (2005) Computers & Operations Research , vol.32 , Issue.5 , pp. 1131-1145
    • Kharoufeh, J.P.1    Sipe, J.A.2
  • 17
    • 0037000841 scopus 로고    scopus 로고
    • Availability of periodically inspected systems subject to markovian degradation
    • Kiessler, P. C., G. A. Klutke, and, Y. Yang. 2002. " Availability of Periodically Inspected Systems Subject to Markovian Degradation." Journal of Applied Probability 39 (4): 700-711.
    • (2002) Journal of Applied Probability , vol.39 , Issue.4 , pp. 700-711
    • Kiessler, P.C.1    Klutke, G.A.2    Yang, Y.3
  • 19
    • 33646112386 scopus 로고    scopus 로고
    • Manufacturing operations manuscripts published in the first 52 issues of POM: Review, trends, and opportunities
    • Kouvelis, P., C. Chambers, and, D. Z. Yu. 2005. " Manufacturing Operations Manuscripts Published in the First 52 Issues of POM: Review, Trends, and Opportunities." Production and Operation Management 14 (4): 450-467.
    • (2005) Production and Operation Management , vol.14 , Issue.4 , pp. 450-467
    • Kouvelis, P.1    Chambers, C.2    Yu, D.Z.3
  • 20
    • 84905503645 scopus 로고    scopus 로고
    • Fubini Theorem." In, edited by Michiel Hazewinkel. London: Springer
    • Kudryavtsev, L. D. 2001. " Fubini Theorem." In Encyclopedia of Mathematics, edited by Michiel Hazewinkel. London: Springer.
    • (2001) Encyclopedia of Mathematics
    • Kudryavtsev, L.D.1
  • 21
    • 77950371029 scopus 로고    scopus 로고
    • A unified approach for scheduling with convex resource consumption functions using positional penalties
    • Leyvand, Y., D. Shabtay, and, G. Steiner. 2010. " A Unified Approach for Scheduling with Convex Resource Consumption Functions Using Positional Penalties." European Journal of Operational Research 206: 301-312
    • (2010) European Journal of Operational Research , vol.206 , pp. 301-312
    • Leyvand, Y.1    Shabtay, D.2    Steiner, G.3
  • 22
    • 84951776319 scopus 로고    scopus 로고
    • Complex system maintenance handbook
    • edited by D. N. P. Murthy and A. K. S. Kobbacy. Amsterdam: Springer
    • Nicolai, R. P., and, R. Dekker. 2008. " Optimal Maintenance of Multi-component Systems: A Review." In Complex System Maintenance Handbook, edited by D. N. P. Murthy and A. K. S. Kobbacy., 263-286. Amsterdam: Springer.
    • (2008) Optimal Maintenance of Multi-component Systems: A Review , pp. 263-286
    • Nicolai, R.P.1    Dekker, R.2
  • 25
    • 83955161111 scopus 로고    scopus 로고
    • Power-aware scheduling of preemptable jobs on identical parallel processors to meet deadlines
    • Rózycki, R., and, J. Weglarz. 2012. " Power-aware Scheduling of Preemptable Jobs on Identical Parallel Processors to Meet Deadlines." European Journal of Operational Research 218 (1): 68-75
    • (2012) European Journal of Operational Research , vol.218 , Issue.1 , pp. 68-75
    • Rózycki, R.1    Weglarz, J.2
  • 26
    • 34547404222 scopus 로고    scopus 로고
    • A survey of scheduling with controllable processing times
    • Shabtay, D., and, G. Steiner. 2007. " A Survey of Scheduling with Controllable Processing times." Discrete Applied Mathematics 155: 1643-1666
    • (2007) Discrete Applied Mathematics , vol.155 , pp. 1643-1666
    • Shabtay, D.1    Steiner, G.2
  • 27
    • 79955584653 scopus 로고    scopus 로고
    • Remaining useful life estimation-A review on the statistical data driven approaches
    • Si, X. S., W. Wang, C. H. Hu, and, D. H. Zhou. 2011. " Remaining Useful Life Estimation-A Review on the Statistical Data Driven Approaches." European Journal of Operational Research 213 (1): 1-14
    • (2011) European Journal of Operational Research , vol.213 , Issue.1 , pp. 1-14
    • Si, X.S.1    Wang, W.2    Hu, C.H.3    Zhou, D.H.4
  • 28
    • 0008193301 scopus 로고    scopus 로고
    • Combined production and maintenance scheduling for a multiple-product, single machine production system
    • Sloan, T. W., and, J. G. Shanthikumar. 2000. " Combined Production and Maintenance Scheduling for a Multiple-Product, Single Machine Production System." Production and Operations Management 9 (4): 379-399.
    • (2000) Production and Operations Management , vol.9 , Issue.4 , pp. 379-399
    • Sloan, T.W.1    Shanthikumar, J.G.2
  • 29
    • 84873895598 scopus 로고    scopus 로고
    • Complex system maintenance handbook
    • In, edited by D. N. P. Murthy and A. K. S. Kobbacy. Amsterdam: Springer
    • Wang, W. 2008. " Delay Time Modelling." In Complex System Maintenance Handbook, edited by D. N. P. Murthy and A. K. S. Kobbacy., 345-372. Amsterdam: Springer.
    • (2008) Delay Time Modelling , pp. 345-372
    • Wang, W.1
  • 30
    • 84856014887 scopus 로고    scopus 로고
    • A case study of condition based maintenance modelling based upon the oil analysis data of marine diesel engines using stochastic filtering
    • Wang, W., B. Hussin, and, T. Jefferis. 2012. " A Case Study of Condition Based Maintenance Modelling Based upon the Oil Analysis Data of Marine Diesel Engines Using Stochastic Filtering." International Journal of Production Economics. 136 (1): 84-92
    • (2012) International Journal of Production Economics , vol.136 , Issue.1 , pp. 84-92
    • Wang, W.1    Hussin, B.2    Jefferis, T.3
  • 33
    • 84871252419 scopus 로고    scopus 로고
    • A joint production scheduling approach considering multiple resources and preventive maintenance tasks
    • Wong, C. S., F. T. S. Chan, and, S. H. Chung. 2013. " A Joint Production Scheduling Approach Considering Multiple Resources and Preventive Maintenance Tasks." International Journal of Production Research 51 (3): 883-896
    • (2013) International Journal of Production Research , vol.51 , Issue.3 , pp. 883-896
    • Wong, C.S.1    Chan, F.T.S.2    Chung, S.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.