메뉴 건너뛰기




Volumn 2, Issue 1, 2005, Pages 32-39

Automated generation of assembly system-design solutions

Author keywords

Assembly; Configuration; Sequence

Indexed keywords

ASSEMBLY; COMPUTER WORKSTATIONS; OPTIMIZATION; PROBLEM SOLVING; SET THEORY; VEHICLES;

EID: 12844277355     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2004.840072     Document Type: Article
Times cited : (48)

References (14)
  • 1
    • 0026111068 scopus 로고
    • An integrated computer aid for generating and evaluating assembly sequences for mechanical products
    • Feb.
    • D. F. Baldwin, T. E. Abell, M. C. M. Lui, T. L. De Fazio, and D. E. Whitney, "An integrated computer aid for generating and evaluating assembly sequences for mechanical products," IEEE Trans. Robot, Autom., vol. 7, pp. 78-93, Feb. 1991.
    • (1991) IEEE Trans. Robot, Autom. , vol.7 , pp. 78-93
    • Baldwin, D.F.1    Abell, T.E.2    Lui, M.C.M.3    De Fazio, T.L.4    Whitney, D.E.5
  • 2
    • 0025457839 scopus 로고
    • On the optimal allocation of servers and workloads in closed queueing networks
    • Y. Dallery and K. E. Stecke, "On the optimal allocation of servers and workloads in closed queueing networks," Oper. Res., vol. 38, no. 4, pp. 694-703, 1990.
    • (1990) Oper. Res. , vol.38 , Issue.4 , pp. 694-703
    • Dallery, Y.1    Stecke, K.E.2
  • 3
    • 0023537240 scopus 로고
    • Simplified generation of all mechanical assembly sequences
    • Dec.
    • T. L. De Fazio and D. E. Whitney, "Simplified generation of all mechanical assembly sequences," IEEE J. Robot. Autom., vol. RA-3, pp. 640-658, Dec. 1987.
    • (1987) IEEE J. Robot. Autom. , vol.RA-3 , pp. 640-658
    • De Fazio, T.L.1    Whitney, D.E.2
  • 4
    • 0141556412 scopus 로고
    • On the efficiency of imbalance in multi-facility multi-server service systems
    • L. V. Green and D. Guha, "On the efficiency of imbalance in multi-facility multi-server service systems," Manage. Sci., vol. 41, no. 1, pp. 179-187, 1995.
    • (1995) Manage. Sci. , vol.41 , Issue.1 , pp. 179-187
    • Green, L.V.1    Guha, D.2
  • 5
    • 0030134777 scopus 로고    scopus 로고
    • On the simultaneous optimization of server and work allocations in production line systems with variable processing times
    • F. S. Hillier and K. So, "On the simultaneous optimization of server and work allocations in production line systems with variable processing times," Oper. Res., vol. 44, no. 3, pp. 435-443, 1996.
    • (1996) Oper. Res. , vol.44 , Issue.3 , pp. 435-443
    • Hillier, F.S.1    So, K.2
  • 6
    • 0026142590 scopus 로고
    • A correct and complete algorithm for the generation of mechanical assembly sequences
    • Apr.
    • L. S. Homem de Mello and A. C. Sanderson, "A correct and complete algorithm for the generation of mechanical assembly sequences," IEEE Trans. Robot. Autom., vol. 7, pp. 228-240, Apr. 1991.
    • (1991) IEEE Trans. Robot. Autom. , vol.7 , pp. 228-240
    • De Mello, L.S.H.1    Sanderson, A.C.2
  • 7
    • 0031271820 scopus 로고    scopus 로고
    • Generation of robotic assembly sequences with consideration of line balancing using simulated annealing
    • D. S. Hong and H. S. Cho, "Generation of robotic assembly sequences with consideration of line balancing using simulated annealing," Robotica, vol. 15, pp. 663-673, 1997.
    • (1997) Robotica , vol.15 , pp. 663-673
    • Hong, D.S.1    Cho, H.S.2
  • 9
    • 0023401973 scopus 로고
    • The maximum production rate for an unbalanced multi-server flow line system with finite buffer storage
    • T. Iyama and S. Ito, "The maximum production rate for an unbalanced multi-server flow line system with finite buffer storage," Int. J. Prod. Res., vol. 25, no. 8, pp. 1157-1170, 1987.
    • (1987) Int. J. Prod. Res. , vol.25 , Issue.8 , pp. 1157-1170
    • Iyama, T.1    Ito, S.2
  • 10
    • 0031335798 scopus 로고    scopus 로고
    • Impact of throughput-based objectives and machine grouping decisions on the short term performance of flexible manufacturing systems
    • Y.-D. Kim and C. A. Yano, "Impact of throughput-based objectives and machine grouping decisions on the short term performance of flexible manufacturing systems," Int. J. Prod. Res., vol. 35, no. 12, pp. 3303-3322, 1997.
    • (1997) Int. J. Prod. Res. , vol.35 , Issue.12 , pp. 3303-3322
    • Kim, Y.-D.1    Yano, C.A.2
  • 11
    • 0030147766 scopus 로고    scopus 로고
    • Throughput for production lines with serial work stations and parallel service facilities
    • M. J. Magazine and K. E. Stecke, "Throughput for production lines with serial work stations and parallel service facilities," Perform. Eval., vol. 25, pp. 211-232, 1996.
    • (1996) Perform. Eval. , vol.25 , pp. 211-232
    • Magazine, M.J.1    Stecke, K.E.2
  • 12
    • 0019088481 scopus 로고
    • Assembly research
    • J. L. Nevins and D. E. Whitney, "Assembly research," Automatica, vol. 16, no. 6, pp. 39-57, 1980.
    • (1980) Automatica , vol.16 , Issue.6 , pp. 39-57
    • Nevins, J.L.1    Whitney, D.E.2
  • 13
    • 0031276404 scopus 로고    scopus 로고
    • Designing paced assembly lines with fixed number of stations
    • H. F. Uǧurdaǧ, R. Rachamadugu, and C. A. Papachristou, "Designing paced assembly lines with fixed number of stations," Eur. J. Oper. Res., vol. 102, pp. 488-501, 1997.
    • (1997) Eur. J. Oper. Res. , vol.102 , pp. 488-501
    • Uǧurdaǧ, H.F.1    Rachamadugu, R.2    Papachristou, C.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.