-
3
-
-
82455174813
-
Benchmarking of high capacity battery module/pack design for automatic assembly system
-
S. Li, H. Wang, Y.T. Lin, J. Abell, and S.J. Hu Benchmarking of high capacity battery module/pack design for automatic assembly system Proceedings of the 2010 ASME International Manufacturing Science and Engineering Conference 2010 34114
-
(2010)
Proceedings of the 2010 ASME International Manufacturing Science and Engineering Conference
, pp. 34114
-
-
Li, S.1
Wang, H.2
Lin, Y.T.3
Abell, J.4
Hu, S.J.5
-
7
-
-
0023537240
-
Simplified generation of all mechanical assembly sequences
-
T.L. De Fazio, and D.E. Whitney Simplified generation of all mechanical assembly sequences IEEE J Robot Autom 3 1987 640 658
-
(1987)
IEEE J Robot Autom
, vol.3
, pp. 640-658
-
-
De Fazio, T.L.1
Whitney, D.E.2
-
9
-
-
0027067346
-
Computer-aided planning of assembly operations. The selection of assembly sequences
-
M. Santochi, and G. Dini Computer aided planning of assembly operations: the selection of assembly sequences Robot CIM-Int Manuf 9 1992 439 446 (Pubitemid 23560462)
-
(1992)
Robotics and Computer-Integrated Manufacturing
, vol.9
, Issue.6
, pp. 439-446
-
-
Santochi, M.1
Dini, G.2
-
10
-
-
43049162649
-
Symbolic OBDD representations for mechanical assembly sequences
-
T. Gu, Z. Xu, and Z. Yang Symbolic OBDD representations for mechanical assembly sequences Comput Aided Des 40 2008 411 421
-
(2008)
Comput Aided des
, vol.40
, pp. 411-421
-
-
Gu, T.1
Xu, Z.2
Yang, Z.3
-
11
-
-
78049277610
-
-
F. Demoly, X.T. Yan, B. Eynard, L. Rivest, and S. Gomes Robot Comput.-Integr Manuf 27 2011 33 46
-
(2011)
Robot Comput.-Integr Manuf
, vol.27
, pp. 33-46
-
-
Demoly, F.1
Yan, X.T.2
Eynard, B.3
Rivest, L.4
Gomes, S.5
-
12
-
-
34547560142
-
A scheme for mechanical assembly design and assembly line layout conceptualization
-
Y.Q. Lee, and S.R.T. Kumara A scheme for mechanical assembly design and assembly line layout conceptualization Comput Ind Eng 27 1994 261 264
-
(1994)
Comput Ind Eng
, vol.27
, pp. 261-264
-
-
Lee, Y.Q.1
Kumara, S.R.T.2
-
13
-
-
0024590846
-
Design of an automated assembly environment
-
U. Roy, P. Banerjee, and C.R. Liu Design of an automated assembly environment Comput-Aided Des 21 1989 561 569
-
(1989)
Comput-Aided des
, vol.21
, pp. 561-569
-
-
Roy, U.1
Banerjee, P.2
Liu, C.R.3
-
14
-
-
0031620001
-
Impact of manufacturing system configuration on performance
-
Y. Koren, S.J. Hu, and T.W. Weber Impact of manufacturing system configuration on performance CIRP Ann-Manuf Technol 47 1998 369 372
-
(1998)
CIRP Ann-Manuf Technol
, vol.47
, pp. 369-372
-
-
Koren, Y.1
Hu, S.J.2
Weber, T.W.3
-
15
-
-
0031270224
-
A parallel station heuristic for the mixed-model production line balancing problem
-
R.G. Askin, and M. Zhou A parallel station heuristic for the mixed-model production line balancing problem Int J Prod Res 35 1997 3095 3105 (Pubitemid 127549656)
-
(1997)
International Journal of Production Research
, vol.35
, Issue.11
, pp. 3095-3105
-
-
Askin, R.G.1
Zhou, M.2
-
16
-
-
0037230929
-
A weighted approach for assembly line design with station paralleling and equipment selection
-
J. Bukchin, and J. Ruvinovitz A weighted approach for assembly line design with station paralleling and equipment selection IIE Trans 35 2003 73 85
-
(2003)
IIE Trans
, vol.35
, pp. 73-85
-
-
Bukchin, J.1
Ruvinovitz, J.2
-
19
-
-
0016487538
-
A branch and bound algorithm for assembly line balancing with paralleling
-
P. Pinto, D.G. Dannenbring, and B.M. Khumawala A branch and bound algorithm for assembly line balancing with paralleling Int J Prod Res 13 1975 183 196
-
(1975)
Int J Prod Res
, vol.13
, pp. 183-196
-
-
Pinto, P.1
Dannenbring, D.G.2
Khumawala, B.M.3
-
20
-
-
84948449456
-
Evaluating manufacturing system design and performance using the manufacturing system design decomposition approach
-
D.S. Cochran, and D.C. Dobbs Evaluating manufacturing system design and performance using the manufacturing system design decomposition approach J Manuf Syst 20 2002 390 404
-
(2002)
J Manuf Syst
, vol.20
, pp. 390-404
-
-
Cochran, D.S.1
Dobbs, D.C.2
-
22
-
-
46149112187
-
Balancing of manufacturing systems with complex configurations for delayed product differentiation
-
J. Ko, and S.J. Hu Balancing of manufacturing systems with complex configurations for delayed product differentiation Int J Prod Res 46 2006 4285 4308
-
(2006)
Int J Prod Res
, vol.46
, pp. 4285-4308
-
-
Ko, J.1
Hu, S.J.2
-
23
-
-
0022768294
-
A survey of exact algorithms for the simple assembly line balancing problem
-
I. Baybars A survey of exact algorithms for the simple assembly line balancing problem Manage Sci 32 1986 909 932 (Pubitemid 16612186)
-
(1986)
Management Science
, vol.32
, Issue.8
, pp. 909-932
-
-
Baybars Ilker1
-
24
-
-
0020781916
-
Assembly line balancing with processing alternatives: An application
-
P.A. Pinto, D.G. Dannenbring, and B.M. Khumawala Assembly line balancing with processing alternatives: an application Manage Sci 29 1983 817 830
-
(1983)
Manage Sci
, vol.29
, pp. 817-830
-
-
Pinto, P.A.1
Dannenbring, D.G.2
Khumawala, B.M.3
-
25
-
-
0020751825
-
An integer programming procedure for assembly system design problems
-
S.C. Graves, and B.W. Lamar An integer programming procedure for assembly system design problems Oper Res 31 1983 522 545
-
(1983)
Oper Res
, vol.31
, pp. 522-545
-
-
Graves, S.C.1
Lamar, B.W.2
-
26
-
-
0002117744
-
Equipment selection and task assignment for multiproduct assembly system design
-
S.C. Graves, and C. Holmes Redfield Equipment selection and task assignment for multiproduct assembly system design Int J Flex Manuf Syst 1 1988 31 50
-
(1988)
Int J Flex Manuf Syst
, vol.1
, pp. 31-50
-
-
Graves, S.C.1
Holmes Redfield, C.2
-
27
-
-
0033750053
-
Design of flexible assembly line to minimize equipment cost
-
J. Bukchin, and M. Tzur Design of flexible assembly line to minimize equipment cost IIE Trans 32 2000 585 598
-
(2000)
IIE Trans
, vol.32
, pp. 585-598
-
-
Bukchin, J.1
Tzur, M.2
-
28
-
-
80054710545
-
Computational system layout generation for battery stack assembly
-
Y.T. Lin, H. Wang, S. Li, C.H. Shao, J.A. Abell, and S.J. Hu Computational system layout generation for battery stack assembly GM/UM Collaborative Res Working Rep 2010
-
(2010)
GM/UM Collaborative Res Working Rep
-
-
Lin, Y.T.1
Wang, H.2
Li, S.3
Shao, C.H.4
Abell, J.A.5
Hu, S.J.6
-
30
-
-
0026119503
-
Improving the equality of workload assignments in assembly lines
-
R. Rachamadugu, and B. Talbot Improving the equality of workload assignments in assembly lines Int J Prod Res 29 1991 619 633
-
(1991)
Int J Prod Res
, vol.29
, pp. 619-633
-
-
Rachamadugu, R.1
Talbot, B.2
-
31
-
-
0037091985
-
A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations
-
DOI 10.1080/00207540110116273
-
P.M. Vilarinho, and A.S. Simaria A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations Int J Prod Res 40 2002 1405 1420 (Pubitemid 34593779)
-
(2002)
International Journal of Production Research
, vol.40
, Issue.6
, pp. 1405-1420
-
-
Vilarinho, P.M.1
Simaria, A.S.2
|