메뉴 건너뛰기




Volumn 30, Issue 4, 2011, Pages 188-195

Automatic generation of assembly system configuration with equipment selection for automotive battery manufacturing

Author keywords

Assembly system; Battery; Configuration generation; Equipment selection

Indexed keywords

ASSEMBLY SEQUENCE; ASSEMBLY SYSTEM DESIGN; ASSEMBLY SYSTEMS; ASSEMBLY TASKS; AUTOMATIC CONFIGURATION; AUTOMATIC GENERATION; AUTOMOTIVE BATTERY; BATTERY; COMPUTATIONAL ALGORITHM; CONFIGURATION GENERATION; EQUIPMENT INVESTMENT; EQUIPMENT SELECTION; GENERATING SYSTEM; HIERARCHICAL COMPOSITION; HIGH CAPACITY; HIGH-POWER; HYBRID CONFIGURATIONS; HYBRID ELECTRICAL VEHICLE; INITIAL CONFIGURATION; LI-ION BATTERIES; LITHIUM-ION BATTERY; PRODUCT ASSEMBLY; RECURSIVE ALGORITHMS; REPETITIVE PATTERN; SEQUENCE PLANNING; TASK ASSIGNMENT;

EID: 80054708815     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jmsy.2011.07.009     Document Type: Conference Paper
Times cited : (50)

References (31)
  • 7
    • 0023537240 scopus 로고
    • Simplified generation of all mechanical assembly sequences
    • T.L. De Fazio, and D.E. Whitney Simplified generation of all mechanical assembly sequences IEEE J Robot Autom 3 1987 640 658
    • (1987) IEEE J Robot Autom , vol.3 , pp. 640-658
    • De Fazio, T.L.1    Whitney, D.E.2
  • 9
    • 0027067346 scopus 로고
    • Computer-aided planning of assembly operations. The selection of assembly sequences
    • M. Santochi, and G. Dini Computer aided planning of assembly operations: the selection of assembly sequences Robot CIM-Int Manuf 9 1992 439 446 (Pubitemid 23560462)
    • (1992) Robotics and Computer-Integrated Manufacturing , vol.9 , Issue.6 , pp. 439-446
    • Santochi, M.1    Dini, G.2
  • 10
    • 43049162649 scopus 로고    scopus 로고
    • Symbolic OBDD representations for mechanical assembly sequences
    • T. Gu, Z. Xu, and Z. Yang Symbolic OBDD representations for mechanical assembly sequences Comput Aided Des 40 2008 411 421
    • (2008) Comput Aided des , vol.40 , pp. 411-421
    • Gu, T.1    Xu, Z.2    Yang, Z.3
  • 12
    • 34547560142 scopus 로고
    • A scheme for mechanical assembly design and assembly line layout conceptualization
    • Y.Q. Lee, and S.R.T. Kumara A scheme for mechanical assembly design and assembly line layout conceptualization Comput Ind Eng 27 1994 261 264
    • (1994) Comput Ind Eng , vol.27 , pp. 261-264
    • Lee, Y.Q.1    Kumara, S.R.T.2
  • 13
    • 0024590846 scopus 로고
    • Design of an automated assembly environment
    • U. Roy, P. Banerjee, and C.R. Liu Design of an automated assembly environment Comput-Aided Des 21 1989 561 569
    • (1989) Comput-Aided des , vol.21 , pp. 561-569
    • Roy, U.1    Banerjee, P.2    Liu, C.R.3
  • 14
    • 0031620001 scopus 로고    scopus 로고
    • Impact of manufacturing system configuration on performance
    • Y. Koren, S.J. Hu, and T.W. Weber Impact of manufacturing system configuration on performance CIRP Ann-Manuf Technol 47 1998 369 372
    • (1998) CIRP Ann-Manuf Technol , vol.47 , pp. 369-372
    • Koren, Y.1    Hu, S.J.2    Weber, T.W.3
  • 15
    • 0031270224 scopus 로고    scopus 로고
    • A parallel station heuristic for the mixed-model production line balancing problem
    • R.G. Askin, and M. Zhou A parallel station heuristic for the mixed-model production line balancing problem Int J Prod Res 35 1997 3095 3105 (Pubitemid 127549656)
    • (1997) International Journal of Production Research , vol.35 , Issue.11 , pp. 3095-3105
    • Askin, R.G.1    Zhou, M.2
  • 16
    • 0037230929 scopus 로고    scopus 로고
    • A weighted approach for assembly line design with station paralleling and equipment selection
    • J. Bukchin, and J. Ruvinovitz A weighted approach for assembly line design with station paralleling and equipment selection IIE Trans 35 2003 73 85
    • (2003) IIE Trans , vol.35 , pp. 73-85
    • Bukchin, J.1    Ruvinovitz, J.2
  • 19
    • 0016487538 scopus 로고
    • A branch and bound algorithm for assembly line balancing with paralleling
    • P. Pinto, D.G. Dannenbring, and B.M. Khumawala A branch and bound algorithm for assembly line balancing with paralleling Int J Prod Res 13 1975 183 196
    • (1975) Int J Prod Res , vol.13 , pp. 183-196
    • Pinto, P.1    Dannenbring, D.G.2    Khumawala, B.M.3
  • 20
    • 84948449456 scopus 로고    scopus 로고
    • Evaluating manufacturing system design and performance using the manufacturing system design decomposition approach
    • D.S. Cochran, and D.C. Dobbs Evaluating manufacturing system design and performance using the manufacturing system design decomposition approach J Manuf Syst 20 2002 390 404
    • (2002) J Manuf Syst , vol.20 , pp. 390-404
    • Cochran, D.S.1    Dobbs, D.C.2
  • 22
    • 46149112187 scopus 로고    scopus 로고
    • Balancing of manufacturing systems with complex configurations for delayed product differentiation
    • J. Ko, and S.J. Hu Balancing of manufacturing systems with complex configurations for delayed product differentiation Int J Prod Res 46 2006 4285 4308
    • (2006) Int J Prod Res , vol.46 , pp. 4285-4308
    • Ko, J.1    Hu, S.J.2
  • 23
    • 0022768294 scopus 로고
    • A survey of exact algorithms for the simple assembly line balancing problem
    • I. Baybars A survey of exact algorithms for the simple assembly line balancing problem Manage Sci 32 1986 909 932 (Pubitemid 16612186)
    • (1986) Management Science , vol.32 , Issue.8 , pp. 909-932
    • Baybars Ilker1
  • 24
    • 0020781916 scopus 로고
    • Assembly line balancing with processing alternatives: An application
    • P.A. Pinto, D.G. Dannenbring, and B.M. Khumawala Assembly line balancing with processing alternatives: an application Manage Sci 29 1983 817 830
    • (1983) Manage Sci , vol.29 , pp. 817-830
    • Pinto, P.A.1    Dannenbring, D.G.2    Khumawala, B.M.3
  • 25
    • 0020751825 scopus 로고
    • An integer programming procedure for assembly system design problems
    • S.C. Graves, and B.W. Lamar An integer programming procedure for assembly system design problems Oper Res 31 1983 522 545
    • (1983) Oper Res , vol.31 , pp. 522-545
    • Graves, S.C.1    Lamar, B.W.2
  • 26
    • 0002117744 scopus 로고
    • Equipment selection and task assignment for multiproduct assembly system design
    • S.C. Graves, and C. Holmes Redfield Equipment selection and task assignment for multiproduct assembly system design Int J Flex Manuf Syst 1 1988 31 50
    • (1988) Int J Flex Manuf Syst , vol.1 , pp. 31-50
    • Graves, S.C.1    Holmes Redfield, C.2
  • 27
    • 0033750053 scopus 로고    scopus 로고
    • Design of flexible assembly line to minimize equipment cost
    • J. Bukchin, and M. Tzur Design of flexible assembly line to minimize equipment cost IIE Trans 32 2000 585 598
    • (2000) IIE Trans , vol.32 , pp. 585-598
    • Bukchin, J.1    Tzur, M.2
  • 30
    • 0026119503 scopus 로고
    • Improving the equality of workload assignments in assembly lines
    • R. Rachamadugu, and B. Talbot Improving the equality of workload assignments in assembly lines Int J Prod Res 29 1991 619 633
    • (1991) Int J Prod Res , vol.29 , pp. 619-633
    • Rachamadugu, R.1    Talbot, B.2
  • 31
    • 0037091985 scopus 로고    scopus 로고
    • A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations
    • DOI 10.1080/00207540110116273
    • P.M. Vilarinho, and A.S. Simaria A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations Int J Prod Res 40 2002 1405 1420 (Pubitemid 34593779)
    • (2002) International Journal of Production Research , vol.40 , Issue.6 , pp. 1405-1420
    • Vilarinho, P.M.1    Simaria, A.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.