메뉴 건너뛰기




Volumn 72, Issue 1-4, 2014, Pages 119-133

Determining the optimum production quantity in three-echelon production system with stochastic demand

Author keywords

Nonlinear programming; Optimum production quantity; Stochastic demand; Three echelon inventory model

Indexed keywords

COSTS; ECONOMICS; INVENTORY CONTROL; NONLINEAR PROGRAMMING; SIMULATED ANNEALING; SUPPLY CHAINS;

EID: 84903306288     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-014-5621-1     Document Type: Article
Times cited : (8)

References (37)
  • 1
    • 82755189344 scopus 로고    scopus 로고
    • Coordinating orders in a two echelon supply chain with controllable lead time and ordering cost using the credit period
    • 10.1016/j.cie.2011.08.016
    • Arkan A, Hejazi SR (2012) Coordinating orders in a two echelon supply chain with controllable lead time and ordering cost using the credit period. Computers & Industrial Engineering 62(1):56-69
    • (2012) Computers & Industrial Engineering , vol.62 , Issue.1 , pp. 56-69
    • Arkan, A.1    Hejazi, S.R.2
  • 2
    • 0028439401 scopus 로고
    • Inventory models involving lead time as a decision variable
    • 10.1057/jors.1994.85 0805.90037
    • Ben-Daya M, Raouf A (1994) Inventory models involving lead time as a decision variable. Journal of the Operational Research Society 45:579-582
    • (1994) Journal of the Operational Research Society , vol.45 , pp. 579-582
    • Ben-Daya, M.1    Raouf, A.2
  • 3
    • 39749118499 scopus 로고    scopus 로고
    • An integrated inventory production system in a three-layer supply chain
    • 10.1080/09537280801895930
    • Ben-Daya M, Al-Nassar A (2008) An integrated inventory production system in a three-layer supply chain. Production Planning and Control 19(2):97-104
    • (2008) Production Planning and Control , vol.19 , Issue.2 , pp. 97-104
    • Ben-Daya, M.1    Al-Nassar, A.2
  • 4
    • 84985846646 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor
    • 10.1111/j.1540-5915.1986.tb00228.x
    • Banerjee A (1986) A joint economic-lot-size model for purchaser and vendor. Decision Sciences 17(3):292-311
    • (1986) Decision Sciences , vol.17 , Issue.3 , pp. 292-311
    • Banerjee, A.1
  • 6
    • 0027642234 scopus 로고
    • The distribution free newsboy problem: Review and extensions
    • Gallego G, & Moon I (1993) The distribution free newsboy problem: review and extensions. Journal of the Operational Research Society, 44(8):825-834
    • (1993) Journal of the Operational Research Society , vol.44 , Issue.8 , pp. 825-834
    • Gallego, G.1    Moon, I.2
  • 7
    • 78650550490 scopus 로고    scopus 로고
    • A multiple-vendor single-buyer integrated inventory model with a variable number of vendors
    • 10.1016/j.cie.2010.11.001
    • Glock CH (2011) A multiple-vendor single-buyer integrated inventory model with a variable number of vendors. Computers & Industrial Engineering 60(1):173-182
    • (2011) Computers & Industrial Engineering , vol.60 , Issue.1 , pp. 173-182
    • Glock, C.H.1
  • 8
    • 0017416997 scopus 로고
    • An integrated inventory model for a single supplier-single customer problem
    • 10.1080/00207547708943107
    • Goyal SK (1977) An integrated inventory model for a single supplier-single customer problem. The International Journal of Production Research 15(1):107-111
    • (1977) The International Journal of Production Research , vol.15 , Issue.1 , pp. 107-111
    • Goyal, S.K.1
  • 9
    • 84985781712 scopus 로고
    • "a joint economic-lot-size model for purchaser and vendor": A comment
    • 10.1111/j.1540-5915.1988.tb00264.x
    • Goyal SK (1988) "A joint economic-lot-size model for purchaser and vendor": a comment*. Decision Sciences 19(1):236-241
    • (1988) Decision Sciences , vol.19 , Issue.1 , pp. 236-241
    • Goyal, S.K.1
  • 11
    • 70349917993 scopus 로고    scopus 로고
    • An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments
    • 10.1016/j.ejor.2009.05.035 1175.90022
    • Huang CK, Tsai DM, Wu JC, Chung KJ (2010) An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments. European Journal of Operational Research 202(2):473-478
    • (2010) European Journal of Operational Research , vol.202 , Issue.2 , pp. 473-478
    • Huang, C.K.1    Tsai, D.M.2    Wu, J.C.3    Chung, K.J.4
  • 12
    • 0024069692 scopus 로고
    • Justifying new technology acquisition through its impact on the cost of running an inventory policy
    • 10.1080/07408178808966182
    • Keller G, Noori H (1988) Justifying new technology acquisition through its impact on the cost of running an inventory policy. IIE Transactions 20(3):284-291
    • (1988) IIE Transactions , vol.20 , Issue.3 , pp. 284-291
    • Keller, G.1    Noori, H.2
  • 13
    • 0037400725 scopus 로고    scopus 로고
    • Optimizing inventory decisions in a multi-stage multi-customer supply chain
    • 10.1016/S1366-5545(02)00036-4
    • Khouja M (2003) Optimizing inventory decisions in a multi-stage multi-customer supply chain. Transportation Research Part E: Logistics and Transportation Review 39(3):193-208
    • (2003) Transportation Research Part E: Logistics and Transportation Review , vol.39 , Issue.3 , pp. 193-208
    • Khouja, M.1
  • 14
    • 84985788519 scopus 로고
    • Setup reduction in the economic production quantity model
    • 10.1111/j.1540-5915.1992.tb00402.x
    • Kim SL, Hayya JC, Hong JD (1992) Setup reduction in the economic production quantity model. Decision Sciences 23(2):500-508
    • (1992) Decision Sciences , vol.23 , Issue.2 , pp. 500-508
    • Kim, S.L.1    Hayya, J.C.2    Hong, J.D.3
  • 15
    • 1842735984 scopus 로고    scopus 로고
    • A note on inventory model involving variable lead time with defective units for mixtures of distribution
    • 10.1016/S0925-5273(03)00197-X
    • Lee WC, Wu JW, Hou WB (2004) A note on inventory model involving variable lead time with defective units for mixtures of distribution. International Journal of Production Economics 89(1):31-44
    • (2004) International Journal of Production Economics , vol.89 , Issue.1 , pp. 31-44
    • Lee, W.C.1    Wu, J.W.2    Hou, W.B.3
  • 16
    • 67349126167 scopus 로고    scopus 로고
    • A technical note on "optimizing inventory decisions in a multistage multi-customer supply chain"
    • 10.1016/j.tre.2009.01.007
    • Leung KNF (2009) A technical note on "Optimizing inventory decisions in a multistage multi-customer supply chain". Transportation Research Part E: Logistics and Transportation Review 45:572-582
    • (2009) Transportation Research Part E: Logistics and Transportation Review , vol.45 , pp. 572-582
    • Leung, K.N.F.1
  • 17
    • 74249119974 scopus 로고    scopus 로고
    • An integrated production-inventory system in a multi-stage multi form supply chain
    • 10.1016/j.tre.2009.06.003
    • Leung KNF (2010) An integrated production-inventory system in a multi-stage multi form supply chain. Transportation Research Part E: Logistics and Transportation Review 46(1):32-48
    • (2010) Transportation Research Part E: Logistics and Transportation Review , vol.46 , Issue.1 , pp. 32-48
    • Leung, K.N.F.1
  • 19
    • 0032210280 scopus 로고    scopus 로고
    • TECHNICAL NOTEA note on lead time and distributional assumptions in continuous review inventory models
    • 10.1016/S0305-0548(97)00103-2 1042.90509 1638662
    • Moon I, Choi S (1998) TECHNICAL NOTEA note on lead time and distributional assumptions in continuous review inventory models. Computers & Operations Research 25(11):1007-1012
    • (1998) Computers & Operations Research , vol.25 , Issue.11 , pp. 1007-1012
    • Moon, I.1    Choi, S.2
  • 20
    • 0025258126 scopus 로고
    • Setup cost reduction in an inventory model with finite-range stochastic lead times
    • 10.1080/00207549008942693 0686.90019
    • Nasri F, Affisco JF, Paknejad MJ (1990) Setup cost reduction in an inventory model with finite-range stochastic lead times. International Journal of Production Research 28:199-212
    • (1990) International Journal of Production Research , vol.28 , pp. 199-212
    • Nasri, F.1    Affisco, J.F.2    Paknejad, M.J.3
  • 21
    • 0035448302 scopus 로고    scopus 로고
    • Mixture inventory model involving variable lead time and controllable backorder rate
    • 10.1016/S0360-8352(01)00033-X
    • Ouyang LY, Chuang BR (2001) Mixture inventory model involving variable lead time and controllable backorder rate. Computers and Industrial Engineering 40(4):339-348
    • (2001) Computers and Industrial Engineering , vol.40 , Issue.4 , pp. 339-348
    • Ouyang, L.Y.1    Chuang, B.R.2
  • 22
    • 34249930610 scopus 로고    scopus 로고
    • An integrated vendor-buyer inventory model with quality improvement and lead time reduction
    • 10.1016/j.ijpe.2006.12.019
    • Ouyang LY, Wu KS, Ho CH (2007) An integrated vendor-buyer inventory model with quality improvement and lead time reduction. International Journal of Production Economics 108(1-2):349-358
    • (2007) International Journal of Production Economics , vol.108 , Issue.1-2 , pp. 349-358
    • Ouyang, L.Y.1    Wu, K.S.2    Ho, C.H.3
  • 24
    • 84865346808 scopus 로고    scopus 로고
    • Multi-item EOQ model while demand is sales price and price break sensitive
    • 10.1016/j.econmod.2012.06.039
    • Pal B, Sana SS, Chaudhuri KS (2012) Multi-item EOQ model while demand is sales price and price break sensitive. Economic Modelling 29(6):2283-2288
    • (2012) Economic Modelling , vol.29 , Issue.6 , pp. 2283-2288
    • Pal, B.1    Sana, S.S.2    Chaudhuri, K.S.3
  • 25
    • 84866523087 scopus 로고    scopus 로고
    • A three layer multi-item production-inventory model for multiple suppliers and retailers
    • 10.1016/j.econmod.2012.08.022
    • Pal B, Sana SS, Chaudhuri KS (2012) A three layer multi-item production-inventory model for multiple suppliers and retailers. Economic Modelling 29:2704-2710
    • (2012) Economic Modelling , vol.29 , pp. 2704-2710
    • Pal, B.1    Sana, S.S.2    Chaudhuri, K.S.3
  • 26
    • 0037139670 scopus 로고    scopus 로고
    • A study of an integrated inventory with controllable lead time
    • 10.1080/00207540110105680 1027.90024
    • Pan CJ, Yang JS (2002) A study of an integrated inventory with controllable lead time. International Journal of Production Research 40(5):1263-1273
    • (2002) International Journal of Production Research , vol.40 , Issue.5 , pp. 1263-1273
    • Pan, C.J.1    Yang, J.S.2
  • 27
    • 0000752798 scopus 로고
    • Investing in reduced setups in the EOQ model
    • 10.1287/mnsc.31.8.998 0609.90058
    • Porteus EL (1985) Investing in reduced setups in the EOQ model. Management Sciences 31:998-1010
    • (1985) Management Sciences , vol.31 , pp. 998-1010
    • Porteus, E.L.1
  • 28
    • 33947165157 scopus 로고    scopus 로고
    • Supply chain models for an assembly system with preprocessing of raw materials
    • 10.1016/j.ejor.2006.08.015 1131.90307
    • Rahman MAA, Sarker BR (2007) Supply chain models for an assembly system with preprocessing of raw materials. European Journal of Operational Research 181:733-752
    • (2007) European Journal of Operational Research , vol.181 , pp. 733-752
    • Rahman, M.A.A.1    Sarker, B.R.2
  • 29
    • 34548565651 scopus 로고    scopus 로고
    • Optimal batch sizing in a multi-stage production system with rework consideration
    • 10.1016/j.ejor.2006.12.005 1141.90017 2356878
    • Sarker BR, Jamal AMM, Mondal S (2008) Optimal batch sizing in a multi-stage production system with rework consideration. European Journal of Operational Research 184:915-929
    • (2008) European Journal of Operational Research , vol.184 , pp. 915-929
    • Sarker, B.R.1    Jamal, A.M.M.2    Mondal, S.3
  • 31
    • 43449138507 scopus 로고    scopus 로고
    • A modification for the carrying cost estimation with respect to the flexibility in production rate
    • 10.1007/s00170-007-0926-y
    • Sharma S (2008) A modification for the carrying cost estimation with respect to the flexibility in production rate. The International Journal of Advanced Manufacturing Technology 36(11-12):1252-1260
    • (2008) The International Journal of Advanced Manufacturing Technology , vol.36 , Issue.11-12 , pp. 1252-1260
    • Sharma, S.1
  • 32
    • 56749184121 scopus 로고    scopus 로고
    • Effects of an increase in manufacturing rate in the context of cyclic production
    • 10.1007/s00170-007-1261-z
    • Sharma S (2008) Effects of an increase in manufacturing rate in the context of cyclic production. The International Journal of Advanced Manufacturing Technology 39(7-8):821-827
    • (2008) The International Journal of Advanced Manufacturing Technology , vol.39 , Issue.7-8 , pp. 821-827
    • Sharma, S.1
  • 33
    • 64949110911 scopus 로고    scopus 로고
    • A composite model in the context of a production-inventory system
    • 10.1007/s11590-008-0104-7 1162.90435
    • Sharma S (2009) A composite model in the context of a production-inventory system. Optimization Letters 3(2):239-251
    • (2009) Optimization Letters , vol.3 , Issue.2 , pp. 239-251
    • Sharma, S.1
  • 34
    • 79953055406 scopus 로고    scopus 로고
    • Effects concerning quality level with the increase in production rate
    • 10.1007/s00170-010-2851-8
    • Sharma S (2011) Effects concerning quality level with the increase in production rate. The International Journal of Advanced Manufacturing Technology 53(5-8):629-634
    • (2011) The International Journal of Advanced Manufacturing Technology , vol.53 , Issue.5-8 , pp. 629-634
    • Sharma, S.1
  • 35
    • 84878648529 scopus 로고    scopus 로고
    • Cycle time reduction in context to the make to order (MTO) environment
    • 10.1108/17410381311318927
    • Sharma S (2013) Cycle time reduction in context to the make to order (MTO) environment. Journal of Manufacturing Technology Management 24(3):448-464
    • (2013) Journal of Manufacturing Technology Management , vol.24 , Issue.3 , pp. 448-464
    • Sharma, S.1
  • 36
    • 84877578456 scopus 로고    scopus 로고
    • Single-vendor single-buyer inventory model with discrete delivery order, random machine unavailability time and lost sales
    • 10.1016/j.ijpe.2011.11.019
    • Wee HM, Widyadana GA (2011) Single-vendor single-buyer inventory model with discrete delivery order, random machine unavailability time and lost sales. Int J Production Economics 143:574-579
    • (2011) Int J Production Economics , vol.143 , pp. 574-579
    • Wee, H.M.1    Widyadana, G.A.2
  • 37
    • 1342266030 scopus 로고    scopus 로고
    • Just-in-time purchasing: An integrated inventory model involving deterministic variable lead time and quality improvement investment
    • 10.1080/00207540310001632448 1069.90006
    • Yang JS, Pan JCH (2004) Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment. International Journal of Production Research 42(5):853-863
    • (2004) International Journal of Production Research , vol.42 , Issue.5 , pp. 853-863
    • Yang, J.S.1    Pan, J.C.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.